FY23 Carolina Group OPTIMIZED REMEDIATION CONTRACT
Solicitation number
W912HN23R1000
Issued by

About this file

This is a request for proposal for an optimized remediation contract to conduct environmental remediation activities at multiple military installations in South Carolina and North Carolina. The scope of work includes maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives at over fifty installation restoration program and military munitions response program sites. The period of performance is ten years. The solicitation is set aside for small businesses and will result in a firm fixed price contract award. The proposal due date is March 27, 2023.

View the file

Other files

File Type Posted
B.08 RFP Conformed AMD004 W912HN23R1000.pdf PDF
B.08 RFP AMD004 W912HN23R1000.pdf PDF
B.08 FY23 Carolina Group ORC_Final PWS_3APR23.pdf PDF
B.07 ProjNET Questions and Answers.pdf PDF
B.08 RFP AMD003 W912HN23R1000.pdf PDF
B.08 FY23 Carolina Group ORC_Final PWS_30MAR23.pdf PDF
B.08 PWS_Enclosure_2B___GFI_Spreadsheets_2_0_23 MAR 23 UPDATED.xlsx XLSX spreadsheet
B.08 RFP AMD002 W912HN23R1000.pdf PDF
B.08 LF008 LTM Report Final_rev0.pdf PDF
B.08 RFP Conformed AMD002 W912HN23R1000.pdf PDF
B.08 FY23 Carolina Group ORC_Final PWS_23MAR23.pdf PDF
B.08 LF016 LTM Report Final rev 0.pdf PDF
B.08 LF015 LTM Report Final rev0.pdf PDF
B.08 TU543_MW-1-58_06Mar2023_report FC2733.pdf PDF
B.08 LF006 LTM Report Final_rev0.pdf PDF
B.08 GFI JB CHS PBR_FL073 (SWMU 73)_Draft CMI YR2.pdf PDF
B.08 GFI JB CHS PBR DA017 (SWMU 17) Draft SA CMI Progress Report 8.pdf PDF
B.08 RFP AMD001 W912HN23R1000.pdf PDF
B.08 GFI JBCA_Multi Site_Analytical Data.pdf PDF
B.08 GFI JB CHS PBR TU939 (AOC B-3) Draft Semi-Annual Progress Report 5.pdf PDF
B.08 GFI JB CHS PBR CS023 (SWMU 23) Draft 2021 LUC Report redline.pdf PDF
B.08 GFI JB CHS PBR DA017 (SWMU 17) Draft UIC Permit App for Supplemental Injection redline2.pdf PDF
B.08 GFI JB CHS PBR LF003 (SWMU 3) Draft 2021 Annual Report redline.pdf PDF
B.08 GFI JBCA_TU542_AOC_V_Draft_2022_GWMR_0323.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 2.pdf PDF
B.08 GFI JB CHS PBR_DA951 (AOC Q)_XE005 (SWMU 25)_Draft 2021 LUC Report.pdf PDF
B.08 GFI JB CHS PBR_DA951 (AOC Q)_DF LUCIP.pdf PDF
B.08 GFI JBC_XE006 SWMU 20 2022 Annual LUC Report Rev1 Changed Pages.pdf PDF
B.08 AMD001 PWS_Enclosure_2B___GFI_Spreadsheets_2_0_13 MAR 23 UPDATED.xlsx XLSX spreadsheet
B.08 AMD001 PWS Enclosure 4_FY23 Carolina Group ORC_Final Sub-CLINs.xlsx XLSX spreadsheet
B.08 GFI JBCW_AB062_Analytical Data only.pdf PDF
B.08 GFI JBCA_ST027_SWMU145_DF_CASER_2022_030923 DRAFT for GFI.pdf PDF
B.08 GFI SWMU 55 (FT003) DF MW Install WP DRAFT-FINAL for GFI (3).pdf PDF
B.08 GFI JB CHS PBR_XE005 (SWMU 25)_DF LUCIP.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 3.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 4.pdf PDF
B.08 GFI SJAFB SS033 Raw Lab Data_Jan 2023.pdf PDF
B.08 AMD001 FY23 Carolina Group ORC_Final PWS_15MAR23.docx DOCX document
B.08 GFI SWMU 55 FT003 - 2022 LTM Report DRAFT for GFI (2).pdf PDF
B.08 GFI JB CHS PBR_LF010 (SWMU 10)_Draft 2022 AMR.pdf PDF
B.08 GFI SJAFB RW502 Raw Lab Data_Jan 2023.pdf PDF
B.08 GFI JB CHS PBR CS023 (SWMU 23) Draft Final Monitoring & LUC Inspection Work Plan.pdf PDF
B.08 GFI JB CHS PBR Draft Final LF003 (SWMU 3) Monitoring & LUC Inspection Work Plan.pdf PDF
B.08 AMD001 RFP Section L Attachment 4 - Proposal Schedule.xlsx XLSX spreadsheet
B.08 GFI JB CHS PBR_TU014 (SWMU 14)_Draft 2022 LTM Report.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 5.pdf PDF
B.08 GFI JBCA ST027_Preliminary Analytical Data_Feb 2023.pdf PDF
B.08 GFI JB CHS PBR SS042 (Zone 4) 2022 1Q-4Q Annual Monitoring Report #13-14 DRAFT for GFI.pdf PDF
B.08 GFI JB CHS PBR LF016 (SWMU 16) Draft 2022 Annual Monitoring Report.pdf PDF
B.08 GFI JBCW_SS012_CENSUS-071TJ_Oct 2022.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CODE

(Hour)

PAGE(S)

until 01:00 PM local time 10 Apr 2023

X

A X B

C D

EX

X G F 560 - 575

576 - 590 X H 591 - 598

David.a.jimenez@usace.army.mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA FAR (48 CFR) 53.214(c)

1 598

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

W912HN 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

PIEE

conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

DAVID A JIMENEZ 912-652-5165

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 431

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

432 - 448 449 - 488

X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 489 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 490 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIONS AND INSTRUCTIONS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

491 - 558

PART II - CONTRACT CLAUSES

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.5. DATE ISSUED

14 Feb 2023

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

W912HN23R1000

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

Complete Project Management Plan (PMP)-FFP

INFO ONLY. Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS).

NET AMT

0001AA 1 Job Complete PMP-FFP

Base Task Year 1 - Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS). Period of Performance is one (1) year.

FOB: Destination

PSC CD: F999

0001AB 1 Job OPTION Update PMP-FFP

Option Task - Update PMP in accordance with Table 1 of the Performance Work Statement (PWS). Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Transition PBR Documents-FFP

INFO ONLY. Finalize and complete unfinished and transitioned Performance Based Remediation (PBR) documents in accordance with paragragh 1.3.2 and 8.2 of the PWS.

0002AA 1 Job OPTION Transition PBR Documents-FFP

Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Air. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0002AB 1 Job OPTION Transition PBR Documents-FFP

Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Weapons. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0002AC 1 Job OPTION Transition PBR Documents-FFP

Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for SJAFB. Once exercised, the Period of Performance is three

(3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Develop IMS / MPS and Update Quarterly-FFP

INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS.

0003AA 1 Job Develop IMS and MPS-FFP

Base Task Year 1 - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS.

Period of Performance is one (1) year.

0003AB 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AC 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AD 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AE 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AF 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AG 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AH 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AJ 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0003AK 1 Job OPTION Update IMS and MPS-FFP

Option Task Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air Basewide QPPs-FFP

INFO ONLY. Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS.

0004AA 1 Job JBC-Air Basewide QPPs-FFP

Base Task Year 1 - Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Period of Performance is one (1) year.

0004AB 1 Job OPTION JBC-Air Basewide QPPs-FFP

Option Tasks - Update basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air RAB Support-FFP

INFO ONLY. Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS.

0005AB 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 2 (FY24) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AC 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 3 (FY25) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AD 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 4 (FY26) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AE 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 5 (FY27) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AF 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 6 (FY28) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AG 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 7 (FY29) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AH 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 8 (FY30) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AJ 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 9 (FY31) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0005AK 1 Job OPTION JBC-Air RAB Support-FFP

Option Task Year 10 (FY32) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air CIP-FFP

INFO ONLY. Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS.

0006AA 1 Job JBC-Air CIP-FFP

Base Task Year 1 - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Period of Performance is one (1) year.

0006AB 1 Job OPTION JBC-Air CIP-FFP

Option Task Year 3 (FY25) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph

4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0006AC 1 Job OPTION JBC-Air CIP-FFP

Option Task Year 5 (FY27) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph

4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0006AD 1 Job OPTION JBC-Air CIP-FFP

Option Task Year 7 (FY29) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph

4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0006AE 1 Job OPTION JBC-Air CIP-FFP

Option Task Year 9 (FY31) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph

4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air Basewide Well IIRAR-FFP

INFO ONLY. Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the

PWS.

0007AA 1 Job JBC-Air Basewide Well IIRAR-FFP

Base Task Year 1 (FY23) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Period of Performance is one (1) year.

0007AB 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 2 (FY24) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007AC 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 3 (FY25) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007AD 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 4 (FY26) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

0007AE 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 5 (FY27) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

0007AF 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 6 (FY28) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

0007AG 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 7 (FY29) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

0007AH 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 8 (FY30) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.

0007AJ 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 9 (FY31) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007AK 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP

Option Task Year 10 (FY32) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CA 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP

Option Task - Abandon up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CB 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP

Option Task - Abandon up to five (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CC 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP

Option Task - Abandon up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CD 1 Job OPTION JBC-Air - Install Basewide Wells-FFP

Option Task - Install up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CE 1 Job OPTION JBC-Air - Install Basewide Wells-FFP

Option Task - Install up to fiive (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0007CF 1 Job OPTION JBC-Air - Install Basewide Wells-FFP

Option Task - Install up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air Tier I Meetings-FFP

INFO ONLY. Complete tier I meeting facilitation and support for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS.

0008AB 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 2 (FY24) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AC 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 3 (FY25) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AD 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 4 (FY26) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AE 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 5 (FY27) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AF 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 6 (FY28) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AG 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 7 (FY29) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AH 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 8 (FY30) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AJ 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 9 (FY31) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0008AK 1 Job OPTION JBC-Air Tier I Meetings-FFP

Option Task Year 10 (FY32) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0009 1 Job JBC-Air Dioxane Sampling and Reporting-FFP

Base Task Year 1 - complete 1,4 Dioxane sampling and reporting for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.

0010 1 Job JBC-Air Vapor Intrusion Study Work Plan-FFP

Base Task Year 1 - complete basewide Vapor Intrusion Study Work Plan for JBC- Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five

(5) years.

0011 1 Job JBC-Air Basewide Background Studies-FFP

Base Task Year 1 - complete basewide Background Studies for pesticides, PAHs, metals for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.

0012 1 Job OPTION JBC-Air Installation RCRA Permit-FFP

Option Task Year 6 (FY28) - support renewal of the installation RCRA permit for JBC-Air in accordance with paragragh 1.1 and 4.10 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air, Site DD540 (AOC P)-FFP

INFO ONLY. Site DD540 (AOC P): Conduct RA-O with optimization for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.

0013AA 1 Job JBC-Air, Site DD540 (AOC P)-FFP

Base Task Year 1 - Site DD540 (AOC P): Prepare Performance Model and achieve the interim performance goals years 2 and 3 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Period of Performance is five (5) years.

0013AB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task - Achieve the performance goals years 4, 5, and 6 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013AC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task - Achieve the performance goals years 7, 8 and develop an Optimization Summary and Forecasting Report for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013AD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task - Achieve the performance goal year 9 and final performance goal year 10 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.

Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CA 1 Job JBC-Air, Site DD540 (AOC P)-FFP

Base Task Year 1 - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Period of Performance is three (3) years.

0013CB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 2 (FY24) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 3 (FY25) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 4 (FY26) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CE 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 5 (FY27) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CF 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 6 (FY28) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CG 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 7 (FY29) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CH 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 8 (FY30) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CJ 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 9 (FY31) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0013CK 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP

Option Task Year 10 (FY32) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air, Site FT003 (SWMU 55)-FFP

INFO ONLY. Site FT003 (SWMU 55): Conduct RA-O/LTM and reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS.

0014CA 1 Job JBC-Air, Site FT003 (SWMU 55)-FFP

Base Task Year 1 - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Period of Performance is three (3) years.

0014CB 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 2 (FY24) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CC 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 3 (FY25) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CD 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 4 (FY26) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CE 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 5 (FY27) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CF 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 6 (FY28) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CG 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 7 (FY29) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CH 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 8 (FY30) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC, and complete the Reduce LCC Summary Report for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CJ 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 9 (FY31) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0014CK 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP

Option Task Year 10 (FY32) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air, Site LF002 (SWMU 69)-FFP

INFO ONLY. Site LF002 (SWMU 69): Conduct LTM for JBC-Air in accordance with Table 1 of the PWS.

0015CA 1 Job JBC-Air, Site LF002 (SWMU 69)-FFP

Base Task Year 1 - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.

0015CB 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 2 (FY24) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CC 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 3 (FY25) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CD 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 4 (FY26) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CE 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 5 (FY27) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CF 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 6 (FY28) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CG 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 7 (FY29) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CH 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 8 (FY30) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CJ 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 9 (FY31) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0015CK 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP

Option Task Year 10 (FY32) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

JBC-Air, Site LF004 (SWMU 66)-FFP

INFO ONLY. Site LF004 (SWMU 66): Conduct LTM for JBC-Air in accordance

0016CA 1 Job JBC-Air, Site LF004 (SWMU 66)-FFP

Base Task Year 1 - Site LF004 (SWMU 66): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.

0016CB 1 Job OPTION JBC-Air, Site LF004 (SWMU 66)-FFP

Option Task Year 2 (FY24) - Site LF004 (SWMU 66): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0016CC 1 Job OPTION JBC-Air, Site LF004 (SWMU 66)-FFP

Option Task Year 3 (FY25) - Site LF004 (SWMU 66): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.

Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

0016CD 1 Job OPTION JBC-Air,…