B.08 RFP Conformed AMD003 W912HN23R1000.pdf
PDF 2 MB Posted
- Solicitation number
- W912HN23R1000
About this file
This is a request for proposal for an optimized remediation contract to conduct environmental remediation activities at multiple military installations in South Carolina and North Carolina. The scope of work includes maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives at over fifty installation restoration program and military munitions response program sites. The period of performance is ten years. The solicitation is set aside for small businesses and will result in a firm fixed price contract award. The proposal due date is March 27, 2023.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until 01:00 PM local time 10 Apr 2023
X
A X B
C D
EX
X G F 560 - 575
576 - 590 X H 591 - 598
David.a.jimenez@usace.army.mil
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA FAR (48 CFR) 53.214(c)
1 598
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W912HN 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and
PIEE
conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
DAVID A JIMENEZ 912-652-5165
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 431
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT X
PACKAGING AND MARKING
J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
432 - 448 449 - 488
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA 489 X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 490 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIONS AND INSTRUCTIONS
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
491 - 558
PART II - CONTRACT CLAUSES
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
14 Feb 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W912HN23R1000
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
Complete Project Management Plan (PMP)-FFP
INFO ONLY. Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS).
NET AMT
0001AA 1 Job Complete PMP-FFP
Base Task Year 1 - Complete PMP in accordance with Table 1 of the Performance Work Statement (PWS). Period of Performance is one (1) year.
FOB: Destination
PSC CD: F999
0001AB 1 Job OPTION Update PMP-FFP
Option Task - Update PMP in accordance with Table 1 of the Performance Work Statement (PWS). Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Transition PBR Documents-FFP
INFO ONLY. Finalize and complete unfinished and transitioned Performance Based Remediation (PBR) documents in accordance with paragragh 1.3.2 and 8.2 of the PWS.
0002AA 1 Job OPTION Transition PBR Documents-FFP
Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Air. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0002AB 1 Job OPTION Transition PBR Documents-FFP
Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for JBC-Weapons. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0002AC 1 Job OPTION Transition PBR Documents-FFP
Option Task - Achieve AF/Regulatory approval for PBR documents not finalized in previous contract for SJAFB. Once exercised, the Period of Performance is three
(3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Develop IMS / MPS and Update Quarterly-FFP
INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS.
0003AA 1 Job Develop IMS and MPS-FFP
Base Task Year 1 - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS.
Period of Performance is one (1) year.
0003AB 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AC 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AD 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AE 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AF 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AG 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AH 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AJ 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0003AK 1 Job OPTION Update IMS and MPS-FFP
Option Task Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air Basewide QPPs-FFP
INFO ONLY. Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS.
0004AA 1 Job JBC-Air Basewide QPPs-FFP
Base Task Year 1 - Complete basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Period of Performance is one (1) year.
0004AB 1 Job OPTION JBC-Air Basewide QPPs-FFP
Option Tasks - Update basewide Quality Program Plans (QPPs) for Joint Base Charleston - Air (JBC-Air) in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air RAB Support-FFP
INFO ONLY. Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS.
0005AB 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 2 (FY24) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AC 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 3 (FY25) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AD 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 4 (FY26) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AE 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 5 (FY27) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AF 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 6 (FY28) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AG 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 7 (FY29) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AH 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 8 (FY30) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AJ 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 9 (FY31) - Restoration Advisory Board (RAB) support for JBC- Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0005AK 1 Job OPTION JBC-Air RAB Support-FFP
Option Task Year 10 (FY32) - Restoration Advisory Board (RAB) support for JBC-Air in accordance with paragraph 4.6 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air CIP-FFP
INFO ONLY. Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS.
0006AA 1 Job JBC-Air CIP-FFP
Base Task Year 1 - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph 4.6.2 of the PWS. Period of Performance is one (1) year.
0006AB 1 Job OPTION JBC-Air CIP-FFP
Option Task Year 3 (FY25) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph
4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0006AC 1 Job OPTION JBC-Air CIP-FFP
Option Task Year 5 (FY27) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph
4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0006AD 1 Job OPTION JBC-Air CIP-FFP
Option Task Year 7 (FY29) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph
4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0006AE 1 Job OPTION JBC-Air CIP-FFP
Option Task Year 9 (FY31) - Complete Community Survey and update Community Involvement Plan (CIP) for JBC-Air in accordance with paragraph
4.6.2 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air Basewide Well IIRAR-FFP
INFO ONLY. Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the
PWS.
0007AA 1 Job JBC-Air Basewide Well IIRAR-FFP
Base Task Year 1 (FY23) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Period of Performance is one (1) year.
0007AB 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 2 (FY24) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007AC 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 3 (FY25) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007AD 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 4 (FY26) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
0007AE 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 5 (FY27) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
0007AF 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 6 (FY28) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
0007AG 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 7 (FY29) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
0007AH 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 8 (FY30) - Complete basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well by written notification to the contractor.
0007AJ 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 9 (FY31) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007AK 1 Job OPTION JBC-Air Basewide Well IIRAR-FFP
Option Task Year 10 (FY32) - Update basewide well inventory, basewide well inspections, basewide well repairs,basewide well abandonments and basewide well replacement installs (IIRAR) for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CA 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP
Option Task - Abandon up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CB 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP
Option Task - Abandon up to five (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CC 1 Job OPTION JBC-Air - Abandon Basewide Wells-FFP
Option Task - Abandon up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CD 1 Job OPTION JBC-Air - Install Basewide Wells-FFP
Option Task - Install up to three (3) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CE 1 Job OPTION JBC-Air - Install Basewide Wells-FFP
Option Task - Install up to fiive (5) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0007CF 1 Job OPTION JBC-Air - Install Basewide Wells-FFP
Option Task - Install up to ten (10) basewide wells for JBC-Air in accordance with paragraph 1.3.2 and Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air Tier I Meetings-FFP
INFO ONLY. Complete tier I meeting facilitation and support for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS.
0008AB 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 2 (FY24) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AC 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 3 (FY25) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AD 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 4 (FY26) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AE 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 5 (FY27) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AF 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 6 (FY28) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AG 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 7 (FY29) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AH 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 8 (FY30) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AJ 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 9 (FY31) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0008AK 1 Job OPTION JBC-Air Tier I Meetings-FFP
Option Task Year 10 (FY32) - Support and facilitate tier I meetings for JBC-Air in accordance with paragragh 1.1 and 4.6.1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0009 1 Job JBC-Air Dioxane Sampling and Reporting-FFP
Base Task Year 1 - complete 1,4 Dioxane sampling and reporting for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.
0010 1 Job JBC-Air Vapor Intrusion Study Work Plan-FFP
Base Task Year 1 - complete basewide Vapor Intrusion Study Work Plan for JBC- Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five
(5) years.
0011 1 Job JBC-Air Basewide Background Studies-FFP
Base Task Year 1 - complete basewide Background Studies for pesticides, PAHs, metals for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.
0012 1 Job OPTION JBC-Air Installation RCRA Permit-FFP
Option Task Year 6 (FY28) - support renewal of the installation RCRA permit for JBC-Air in accordance with paragragh 1.1 and 4.10 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air, Site DD540 (AOC P)-FFP
INFO ONLY. Site DD540 (AOC P): Conduct RA-O with optimization for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.
0013AA 1 Job JBC-Air, Site DD540 (AOC P)-FFP
Base Task Year 1 - Site DD540 (AOC P): Prepare Performance Model and achieve the interim performance goals years 2 and 3 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Period of Performance is five (5) years.
0013AB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task - Achieve the performance goals years 4, 5, and 6 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013AC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task - Achieve the performance goals years 7, 8 and develop an Optimization Summary and Forecasting Report for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013AD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task - Achieve the performance goal year 9 and final performance goal year 10 for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS.
Once exercised, the Period of Performance is three (3) years unless in an instance where there is not three (3) years remaining on the contract. The POP will end after three (3) years, or contract expiration, whichever is soonest.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CA 1 Job JBC-Air, Site DD540 (AOC P)-FFP
Base Task Year 1 - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Period of Performance is three (3) years.
0013CB 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 2 (FY24) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CC 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 3 (FY25) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CD 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 4 (FY26) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CE 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 5 (FY27) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CF 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 6 (FY28) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CG 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 7 (FY29) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CH 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 8 (FY30) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CJ 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 9 (FY31) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0013CK 1 Job OPTION JBC-Air, Site DD540 (AOC P)-FFP
Option Task Year 10 (FY32) - Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with paragragh 1.2.4 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air, Site FT003 (SWMU 55)-FFP
INFO ONLY. Site FT003 (SWMU 55): Conduct RA-O/LTM and reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS.
0014CA 1 Job JBC-Air, Site FT003 (SWMU 55)-FFP
Base Task Year 1 - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Period of Performance is three (3) years.
0014CB 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 2 (FY24) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CC 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 3 (FY25) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CD 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 4 (FY26) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CE 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 5 (FY27) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CF 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 6 (FY28) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CG 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 7 (FY29) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CH 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 8 (FY30) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC, and complete the Reduce LCC Summary Report for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CJ 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 9 (FY31) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0014CK 1 Job OPTION JBC-Air, Site FT003 (SWMU 55)-FFP
Option Task Year 10 (FY32) - Site FT003 (SWMU 55): Maintain compliance with regulatory requirements and binding agreements, and Reduce LCC for JBC-Air in accordance with paragragh 1.2.5 and Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air, Site LF002 (SWMU 69)-FFP
INFO ONLY. Site LF002 (SWMU 69): Conduct LTM for JBC-Air in accordance with Table 1 of the PWS.
0015CA 1 Job JBC-Air, Site LF002 (SWMU 69)-FFP
Base Task Year 1 - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.
0015CB 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 2 (FY24) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CC 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 3 (FY25) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CD 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 4 (FY26) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CE 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 5 (FY27) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CF 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 6 (FY28) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CG 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 7 (FY29) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CH 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 8 (FY30) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CJ 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 9 (FY31) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0015CK 1 Job OPTION JBC-Air, Site LF002 (SWMU 69)-FFP
Option Task Year 10 (FY32) - Site LF002 (SWMU 69): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
JBC-Air, Site LF004 (SWMU 66)-FFP
INFO ONLY. Site LF004 (SWMU 66): Conduct LTM for JBC-Air in accordance
0016CA 1 Job JBC-Air, Site LF004 (SWMU 66)-FFP
Base Task Year 1 - Site LF004 (SWMU 66): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.
0016CB 1 Job OPTION JBC-Air, Site LF004 (SWMU 66)-FFP
Option Task Year 2 (FY24) - Site LF004 (SWMU 66): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0016CC 1 Job OPTION JBC-Air, Site LF004 (SWMU 66)-FFP
Option Task Year 3 (FY25) - Site LF004 (SWMU 66): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.
Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
0016CD 1 Job OPTION JBC-Air,…