B.08 RFP AMD001 W912HN23R1000.pdf
PDF 715 KB Posted
- Solicitation number
- W912HN23R1000
About this file
This is a request for proposal for environmental remediation services at multiple military bases in South Carolina and North Carolina. The contractor will undertake activities to achieve performance objectives at fifty-four Installation Restoration Program sites and eleven Military Munitions Response Program sites. Services include maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives. The ten-year contract has a total estimated value of $150 million. The solicitation is set aside for small businesses and will result in a firm fixed-price contract to be awarded by 27 March 2023. Electronic proposals must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module by the due date and time.
View the file
Other files
Show 40 more
Latest 50 of 70 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
A. Proposal Due date is extended to 1:00pm eastern, 10 April 2023.
B. PWS is updated to address RFIs to inlcude Enclosure 2 (GFI) C. Section L and M are updated to address RFIs.
D. CLIN Structure is updated to address RFIs.
All changes are annotated in their respective attachments. All other terms and conditions remain unchanged.
1. CONTRACT ID CODE PAGE OF PAGES
J 1 99
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 17-Mar-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN23R1000
X 9B. DATED (SEE ITEM 11)
14-Feb-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
17-Mar-2023
CODE
USACE - SAVANNAH DISTRICT
100 W. OGLETHORPE AVE
SAVANNAH GA 31401
W912HN 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
W912HN23R1000
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION A - SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Mar-2023 01:00 PM to 10-Apr-
2023 01:00 PM.
SECTION B - SUPPLIES OR SERVICES AND PRICES
CLIN 0003
The CLIN extended description has changed from:
INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS.
To:
INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS.
SUBCLIN 0003AA
Base Task Year 1 - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS. Period of Performance is one (1) year.
Base Task Year 1 - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS. Period of Performance is one (1) year.
SUBCLIN 0003AB
Option Task Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Option Task Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AC
Option Task Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AD
Option Task Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AE
Option Task Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AF
Option Task Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AG
Option Task Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AH
Option Task Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AJ
Option Task Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0003AK
Option Task Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
Option Task Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
CLIN 0010
The CLIN description has changed from JBC-Air Vapor Intrusion Study- to JBC-Air Vapor Intrusion
Study Work Plan-.
Base Task Year 1 - complete basewide Vapor Intrusion Study for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.
Base Task Year 1 - complete basewide Vapor Intrusion Study Work Plan for JBC-Air in accordance with paragragh
1.3.2 of the PWS. Period of Performance is five (5) years.
CLIN 0022
The CLIN description has changed from JBC-Air, Site OW507 (SWMU 82)- to RESERVED, NOT
USED-.
INFO ONLY. Site OW507 (SWMU 82): Achieve site closeout for JBC-Air in accordance with Table 1 of the PWS.
INFO ONLY. RESERVED, NOT USED.
SUBCLIN 0022AA
USED-.
The CLIN extended description has changed from:
Base Task Year 1 - Site OW507 (SWMU 82): Optimize the site in support of Response Complete for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is five (5) years.
The option status has changed from No Status to Option.
SUBCLIN 0022AB
USED-.
The CLIN extended description has changed from:
Option Task - Site OW507 (SWMU 82): Achieve Response Complete for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.
Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022AC
USED-.
The CLIN extended description has changed from:
Option Task - Site OW507 (SWMU 82): Optimize the site in support of Site Closeout for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022AD
USED-.
The CLIN extended description has changed from:
Option Task - Site OW507 (SWMU 82): Achieve Site Closeout for JBC-Air in accordance with Table 1 of the PWS.
Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
SUBCLIN 0022CA
USED-.
Base Task Year 1 - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.
SUBCLIN 0022CB
USED-.
The CLIN extended description has changed from:
Option Task Year 2 (FY24) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CC
USED-.
The CLIN extended description has changed from:
Option Task Year 3 (FY25) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CD
USED-.
The CLIN extended description has changed from:
Option Task Year 4 (FY26) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CE
USED-.
The CLIN extended description has changed from:
Option Task Year 5 (FY27) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CF
USED-.
The CLIN extended description has changed from:
Option Task Year 6 (FY28) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CG
USED-.
The CLIN extended description has changed from:
Option Task Year 7 (FY29) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CH
USED-.
The CLIN extended description has changed from:
Option Task Year 8 (FY30) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CJ
USED-.
The CLIN extended description has changed from:
Option Task Year 9 (FY31) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0022CK
USED-.
The CLIN extended description has changed from:
Option Task Year 10 (FY32) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
CLIN 0023
The CLIN description has changed from JBC-Air, Site RW052 (SWMU 123)- to RESERVED, NOT
USED-.
The CLIN extended description has changed from:
INFO ONLY. Site RW052 (SWMU 123): Achieve site closeout for JBC-Air in accordance with Table 1 of the
PWS.
SUBCLIN 0023AA
USED-.
The CLIN extended description has changed from:
Base Task Year 1 - Site RW052 (SWMU 123): Optimize the site in support of Response Complete for JBC-Air in
SUBCLIN 0023AB
USED-.
The CLIN extended description has changed from:
Option Task - Site RW052 (SWMU 123): Achieve Response Complete for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.
Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023AC
USED-.
The CLIN extended description has changed from:
Option Task - Site RW052 (SWMU 123): Optimize the site in support of Site Closeout for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023AD
USED-.
The CLIN extended description has changed from:
Option Task - Site RW052 (SWMU 123): Achieve Site Closeout for JBC-Air in accordance with Table 1 of the PWS. One year POP. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.
Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CA
USED-.
The CLIN extended description has changed from:
Base Task Year 1 - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.
SUBCLIN 0023CB
USED-.
The CLIN extended description has changed from:
Option Task Year 2 (FY24) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CC
USED-.
The CLIN extended description has changed from:
Option Task Year 3 (FY25) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CD
USED-.
The CLIN extended description has changed from:
Option Task Year 4 (FY26) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CE
USED-.
The CLIN extended description has changed from:
Option Task Year 5 (FY27) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CF
USED-.
The CLIN extended description has changed from:
Option Task Year 6 (FY28) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CG
USED-.
The CLIN extended description has changed from:
Option Task Year 7 (FY29) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CH
USED-.
The CLIN extended description has changed from:
Option Task Year 8 (FY30) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CJ
USED-.
The CLIN extended description has changed from:
Option Task Year 9 (FY31) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0023CK
USED-.
The CLIN extended description has changed from:
Option Task Year 10 (FY32) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
CLIN 0028
The CLIN description has changed from JBC-Air, Site TU522 (SWMUU 101)- to RESERVED, NOT
USED-.
The CLIN extended description has changed from:
INFO ONLY. Site TU522 (SWMUU 101): Achieve site closeout for JBC-Air in accordance with Table 1 of the
PWS.
SUBCLIN 0028AA
USED-.
The CLIN extended description has changed from:
Base Task Year 1 - Site TU522 (SWMUU 101): Optimize the site in support of Response Complete for JBC-Air in
SUBCLIN 0028AB
USED-.
The CLIN extended description has changed from:
Option Task - Site TU522 (SWMUU 101): Achieve Response Complete for JBC-Air in accordance with Table 1 of the PWS. One year POP. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028AC
USED-.
The CLIN extended description has changed from:
Option Task - Site TU522 (SWMUU 101): Optimize the site in support of Site Closeout for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028AD
USED-.
The CLIN extended description has changed from:
Option Task - Site TU522 (SWMUU 101): Achieve Site Closeout for JBC-Air in accordance with Table 1 of the PWS. One year POP. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.
Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CA
USED-.
The CLIN extended description has changed from:
Base Task Year 1 - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.
SUBCLIN 0028CB
The CLIN extended description has changed from:
Option Task Year 2 (FY24) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CC
USED-.
The CLIN extended description has changed from:
Option Task Year 3 (FY25) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CD
USED-.
The CLIN extended description has changed from:
Option Task Year 4 (FY26) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CE
Option Task Year 5 (FY27) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CF
USED-.
The CLIN extended description has changed from:
Option Task Year 6 (FY28) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CG
USED-.
The CLIN extended description has changed from:
Option Task Year 7 (FY29) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CH
Option Task Year 8 (FY30) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CJ
USED-.
The CLIN extended description has changed from:
Option Task Year 9 (FY31) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0028CK
USED-.
The CLIN extended description has changed from:
Option Task Year 10 (FY32) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
CLIN 0037
The CLIN description has changed from JBC-Weapons Vapor Intrusion Study- to JBC-Weapons Vapor Intrusion Study WP-.
Option Task Year FY25 - complete basewide Vapor Intrusion Study for JBC-Weapons in accordance with paragragh 1.3.2 of the PWS. Once exercised, the Period of Performance is five (5) years. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Option Task Year FY25 - complete basewide Vapor Intrusion Study Work Plan for JBC-Weapons in accordance with paragragh 1.3.2 of the PWS. Once exercised, the Period of Performance is five (5) years. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be
CLIN 0054
The CLIN description has changed from JBC-Weapons, Site SS012 (SWMU 112)- to JBC-Weapons, Site
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
INFO ONLY. Site SS012 (SWMU 112): Conduct RA-O and achieve alternative objective for JBC-Weapons in accordance with Table 1 of the PWS.
INFO ONLY. Site SS012 (SWMU 12): Conduct RA-O and achieve alternative objective for JBC-Weapons in
SUBCLIN 0054AA
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 3 (FY25) - Site SS012 (SWMU 112): Achieve Supplemental Site Investigation Work Plan for JBC-Weapons in accordance with Table 1 of the PWS. Five year POP. Once exercised, the Period of Performance is five (5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Option Task Year 3 (FY25) - Site SS012 (SWMU 12): Achieve Supplemental Site Investigation Work Plan for JBC- Weapons in accordance with Table 1 of the PWS. Five year POP. Once exercised, the Period of Performance is five
(5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.
Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0054AB
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task - Site SS012 (SWMU 112): Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Option Task - Site SS012 (SWMU 12): Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to
SUBCLIN 0054AC
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task - Site SS012 (SWMU 112): Achieve Remedy Evaluation and Recommendation Report for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to
Option Task - Site SS012 (SWMU 12): Achieve Remedy Evaluation and Recommendation Report for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to
SUBCLIN 0054AD
SS012 (SWMU 12)-.
Option Task - Site SS012 (SWMU 112): Complete Pilot Study(ies)/Treatability Test(s) for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to
Option Task - Site SS012 (SWMU 12): Complete Pilot Study(ies)/Treatability Test(s) for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to
SUBCLIN 0054AE
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task - Site SS012 (SWMU 112): Achieve Revised Statement of Basis for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress.
Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Option Task - Site SS012 (SWMU 12): Achieve Revised Statement of Basis for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress.
Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0054CC
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 3 (FY25) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Option Task Year 3 (FY25) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
SUBCLIN 0054CD
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 4 (FY26) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
Option Task Year 4 (FY26) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
SUBCLIN 0054CE
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 5 (FY27) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
Option Task Year 5 (FY27) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
SUBCLIN 0054CF
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 6 (FY28) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
Option Task Year 6 (FY28) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
SUBCLIN 0054CG
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 7 (FY29) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
Option Task Year 7 (FY29) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
SUBCLIN 0054CH
SS012 (SWMU 12)-.
Option Task Year 8 (FY30) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
Option Task Year 8 (FY30) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
SUBCLIN 0054CJ
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 9 (FY31) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
Option Task Year 9 (FY31) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
SUBCLIN 0054CK
SS012 (SWMU 12)-.
The CLIN extended description has changed from:
Option Task Year 10 (FY32) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
Option Task Year 10 (FY32) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the
CLIN 0057
INFO ONLY. Site TU927 (TU/US-C10): Conduct RA-O and achieve alternate objective for JBC-Weapons in
INFO ONLY. Site TU927 (TU/US-C10): Achieve Site Closeout.
SUBCLIN 0057AA
Option Task Year 3 (FY25) - Site TU927 (TU/US-C10): Achieve Supplemental Site Investigation Work Plan for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
Option Task Year 3 (FY25) - Site TU927 (TU/US-C10): Optimize the site in support of Site Closeout for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any
SUBCLIN 0057AB
Option Task - Site TU927 (TU/US-C10): Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to
Option Task - Site TU927 (TU/US-C10): Achieve Site Closeout. Once exercised, the Period of Performance is five
(5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.
SUBCLIN 0057AC
The CLIN description has changed from JBC-Weapons, Site TU927 (TU/US-C10)- to RESERVED, NOT
USED-.
The CLIN extended description has changed from:
Option Task - Site TU927 (TU/US-C10): Achieve Remedy Evaluation and Recommendation Report for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to
SUBCLIN 0057AD
USED-.
The CLIN extended description has changed from:
Option Task - Site TU927 (TU/US-C10): Complete Pilot Study(ies)/Treatability Test(s) for JBC-Weapons in accordance…