This is a request for proposal for environmental remediation services at multiple military bases in South Carolina and North Carolina. The contractor will undertake activities to achieve performance objectives at fifty-four Installation Restoration Program sites and eleven Military Munitions Response Program sites. Services include maintenance of established remedies, optimization at applicable sites, and achievement of site-specific objectives. The ten-year contract has a total estimated value of $150 million. The solicitation is set aside for small businesses and will result in a firm fixed-price contract to be awarded by 27 March 2023. Electronic proposals must be submitted through the Procurement Integrated Enterprise Environment Solicitation Module by the due date and time.

View the file

Other files

File Type Posted
B.08 RFP Conformed AMD004 W912HN23R1000.pdf PDF
B.08 RFP AMD004 W912HN23R1000.pdf PDF
B.08 FY23 Carolina Group ORC_Final PWS_3APR23.pdf PDF
B.07 ProjNET Questions and Answers.pdf PDF
B.08 RFP AMD003 W912HN23R1000.pdf PDF
B.08 RFP Conformed AMD003 W912HN23R1000.pdf PDF
B.08 FY23 Carolina Group ORC_Final PWS_30MAR23.pdf PDF
B.08 PWS_Enclosure_2B___GFI_Spreadsheets_2_0_23 MAR 23 UPDATED.xlsx XLSX spreadsheet
B.08 RFP AMD002 W912HN23R1000.pdf PDF
B.08 LF008 LTM Report Final_rev0.pdf PDF
B.08 RFP Conformed AMD002 W912HN23R1000.pdf PDF
B.08 FY23 Carolina Group ORC_Final PWS_23MAR23.pdf PDF
B.08 LF016 LTM Report Final rev 0.pdf PDF
B.08 LF015 LTM Report Final rev0.pdf PDF
B.08 TU543_MW-1-58_06Mar2023_report FC2733.pdf PDF
B.08 LF006 LTM Report Final_rev0.pdf PDF
B.08 GFI JB CHS PBR_FL073 (SWMU 73)_Draft CMI YR2.pdf PDF
B.08 GFI JB CHS PBR DA017 (SWMU 17) Draft SA CMI Progress Report 8.pdf PDF
B.08 GFI JBCA_Multi Site_Analytical Data.pdf PDF
B.08 GFI JB CHS PBR TU939 (AOC B-3) Draft Semi-Annual Progress Report 5.pdf PDF
B.08 GFI JB CHS PBR CS023 (SWMU 23) Draft 2021 LUC Report redline.pdf PDF
B.08 GFI JB CHS PBR DA017 (SWMU 17) Draft UIC Permit App for Supplemental Injection redline2.pdf PDF
B.08 GFI JB CHS PBR LF003 (SWMU 3) Draft 2021 Annual Report redline.pdf PDF
B.08 GFI JBCA_TU542_AOC_V_Draft_2022_GWMR_0323.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 2.pdf PDF
B.08 GFI JB CHS PBR_DA951 (AOC Q)_XE005 (SWMU 25)_Draft 2021 LUC Report.pdf PDF
B.08 GFI JB CHS PBR_DA951 (AOC Q)_DF LUCIP.pdf PDF
B.08 GFI JBC_XE006 SWMU 20 2022 Annual LUC Report Rev1 Changed Pages.pdf PDF
B.08 AMD001 PWS_Enclosure_2B___GFI_Spreadsheets_2_0_13 MAR 23 UPDATED.xlsx XLSX spreadsheet
B.08 AMD001 PWS Enclosure 4_FY23 Carolina Group ORC_Final Sub-CLINs.xlsx XLSX spreadsheet
B.08 GFI JBCW_AB062_Analytical Data only.pdf PDF
B.08 GFI JBCA_ST027_SWMU145_DF_CASER_2022_030923 DRAFT for GFI.pdf PDF
B.08 GFI SWMU 55 (FT003) DF MW Install WP DRAFT-FINAL for GFI (3).pdf PDF
B.08 GFI JB CHS PBR_XE005 (SWMU 25)_DF LUCIP.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 3.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 4.pdf PDF
B.08 GFI SJAFB SS033 Raw Lab Data_Jan 2023.pdf PDF
B.08 AMD001 FY23 Carolina Group ORC_Final PWS_15MAR23.docx DOCX document
B.08 GFI SWMU 55 FT003 - 2022 LTM Report DRAFT for GFI (2).pdf PDF
B.08 GFI JB CHS PBR_LF010 (SWMU 10)_Draft 2022 AMR.pdf PDF
B.08 GFI SJAFB RW502 Raw Lab Data_Jan 2023.pdf PDF
B.08 GFI JB CHS PBR CS023 (SWMU 23) Draft Final Monitoring & LUC Inspection Work Plan.pdf PDF
B.08 GFI JB CHS PBR Draft Final LF003 (SWMU 3) Monitoring & LUC Inspection Work Plan.pdf PDF
B.08 AMD001 RFP Section L Attachment 4 - Proposal Schedule.xlsx XLSX spreadsheet
B.08 GFI JB CHS PBR_TU014 (SWMU 14)_Draft 2022 LTM Report.pdf PDF
B.08 GFI JBCW_SS012_Analytical Data 5.pdf PDF
B.08 GFI JBCA ST027_Preliminary Analytical Data_Feb 2023.pdf PDF
B.08 GFI JB CHS PBR SS042 (Zone 4) 2022 1Q-4Q Annual Monitoring Report #13-14 DRAFT for GFI.pdf PDF
B.08 GFI JB CHS PBR LF016 (SWMU 16) Draft 2022 Annual Monitoring Report.pdf PDF
B.08 GFI JBCW_SS012_CENSUS-071TJ_Oct 2022.pdf PDF
Show 40 more

Latest 50 of 70 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

A. Proposal Due date is extended to 1:00pm eastern, 10 April 2023.

B. PWS is updated to address RFIs to inlcude Enclosure 2 (GFI) C. Section L and M are updated to address RFIs.

D. CLIN Structure is updated to address RFIs.

All changes are annotated in their respective attachments. All other terms and conditions remain unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 99

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Mar-2023

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X W912HN23R1000

X 9B. DATED (SEE ITEM 11)

14-Feb-2023

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Mar-2023

CODE

USACE - SAVANNAH DISTRICT

100 W. OGLETHORPE AVE

SAVANNAH GA 31401

W912HN 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W912HN23R1000

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Mar-2023 01:00 PM to 10-Apr-

2023 01:00 PM.

SECTION B - SUPPLIES OR SERVICES AND PRICES

CLIN 0003

The CLIN extended description has changed from:

INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS.

To:

INFO ONLY. Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS.

SUBCLIN 0003AA

Base Task Year 1 - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update quarterly in accordance with Table 1 of the PWS. Period of Performance is one (1) year.

Base Task Year 1 - Develop integrated master schedule (IMS) / milestone payment schedule (MPS) and update monthly in accordance with Table 1 of the PWS. Period of Performance is one (1) year.

SUBCLIN 0003AB

Option Task Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Option Task Year 2 (FY24) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AC

Option Task Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 3 (FY25) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AD

Option Task Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 4 (FY26) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AE

Option Task Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 5 (FY27) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AF

Option Task Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 6 (FY28) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AG

Option Task Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 7 (FY29) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AH

Option Task Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 8 (FY30) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AJ

Option Task Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 9 (FY31) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0003AK

Option Task Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) quarterly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

Option Task Year 10 (FY32) - Update integrated master schedule (IMS) / milestone payment schedule (MPS) monthly in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

CLIN 0010

The CLIN description has changed from JBC-Air Vapor Intrusion Study- to JBC-Air Vapor Intrusion

Study Work Plan-.

Base Task Year 1 - complete basewide Vapor Intrusion Study for JBC-Air in accordance with paragragh 1.3.2 of the PWS. Period of Performance is five (5) years.

Base Task Year 1 - complete basewide Vapor Intrusion Study Work Plan for JBC-Air in accordance with paragragh

1.3.2 of the PWS. Period of Performance is five (5) years.

CLIN 0022

The CLIN description has changed from JBC-Air, Site OW507 (SWMU 82)- to RESERVED, NOT

USED-.

INFO ONLY. Site OW507 (SWMU 82): Achieve site closeout for JBC-Air in accordance with Table 1 of the PWS.

INFO ONLY. RESERVED, NOT USED.

SUBCLIN 0022AA

USED-.

The CLIN extended description has changed from:

Base Task Year 1 - Site OW507 (SWMU 82): Optimize the site in support of Response Complete for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is five (5) years.

The option status has changed from No Status to Option.

SUBCLIN 0022AB

USED-.

The CLIN extended description has changed from:

Option Task - Site OW507 (SWMU 82): Achieve Response Complete for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.

Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022AC

USED-.

The CLIN extended description has changed from:

Option Task - Site OW507 (SWMU 82): Optimize the site in support of Site Closeout for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022AD

USED-.

The CLIN extended description has changed from:

Option Task - Site OW507 (SWMU 82): Achieve Site Closeout for JBC-Air in accordance with Table 1 of the PWS.

Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

SUBCLIN 0022CA

USED-.

Base Task Year 1 - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.

SUBCLIN 0022CB

USED-.

The CLIN extended description has changed from:

Option Task Year 2 (FY24) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CC

USED-.

The CLIN extended description has changed from:

Option Task Year 3 (FY25) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CD

USED-.

The CLIN extended description has changed from:

Option Task Year 4 (FY26) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CE

USED-.

The CLIN extended description has changed from:

Option Task Year 5 (FY27) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CF

USED-.

The CLIN extended description has changed from:

Option Task Year 6 (FY28) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CG

USED-.

The CLIN extended description has changed from:

Option Task Year 7 (FY29) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CH

USED-.

The CLIN extended description has changed from:

Option Task Year 8 (FY30) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CJ

USED-.

The CLIN extended description has changed from:

Option Task Year 9 (FY31) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0022CK

USED-.

The CLIN extended description has changed from:

Option Task Year 10 (FY32) - Site OW507 (SWMU 82): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

CLIN 0023

The CLIN description has changed from JBC-Air, Site RW052 (SWMU 123)- to RESERVED, NOT

USED-.

The CLIN extended description has changed from:

INFO ONLY. Site RW052 (SWMU 123): Achieve site closeout for JBC-Air in accordance with Table 1 of the

PWS.

SUBCLIN 0023AA

USED-.

The CLIN extended description has changed from:

Base Task Year 1 - Site RW052 (SWMU 123): Optimize the site in support of Response Complete for JBC-Air in

SUBCLIN 0023AB

USED-.

The CLIN extended description has changed from:

Option Task - Site RW052 (SWMU 123): Achieve Response Complete for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.

Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023AC

USED-.

The CLIN extended description has changed from:

Option Task - Site RW052 (SWMU 123): Optimize the site in support of Site Closeout for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023AD

USED-.

The CLIN extended description has changed from:

Option Task - Site RW052 (SWMU 123): Achieve Site Closeout for JBC-Air in accordance with Table 1 of the PWS. One year POP. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.

Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CA

USED-.

The CLIN extended description has changed from:

Base Task Year 1 - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.

SUBCLIN 0023CB

USED-.

The CLIN extended description has changed from:

Option Task Year 2 (FY24) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CC

USED-.

The CLIN extended description has changed from:

Option Task Year 3 (FY25) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CD

USED-.

The CLIN extended description has changed from:

Option Task Year 4 (FY26) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CE

USED-.

The CLIN extended description has changed from:

Option Task Year 5 (FY27) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CF

USED-.

The CLIN extended description has changed from:

Option Task Year 6 (FY28) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CG

USED-.

The CLIN extended description has changed from:

Option Task Year 7 (FY29) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CH

USED-.

The CLIN extended description has changed from:

Option Task Year 8 (FY30) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CJ

USED-.

The CLIN extended description has changed from:

Option Task Year 9 (FY31) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0023CK

USED-.

The CLIN extended description has changed from:

Option Task Year 10 (FY32) - Site RW052 (SWMU 123): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

CLIN 0028

The CLIN description has changed from JBC-Air, Site TU522 (SWMUU 101)- to RESERVED, NOT

USED-.

The CLIN extended description has changed from:

INFO ONLY. Site TU522 (SWMUU 101): Achieve site closeout for JBC-Air in accordance with Table 1 of the

PWS.

SUBCLIN 0028AA

USED-.

The CLIN extended description has changed from:

Base Task Year 1 - Site TU522 (SWMUU 101): Optimize the site in support of Response Complete for JBC-Air in

SUBCLIN 0028AB

USED-.

The CLIN extended description has changed from:

Option Task - Site TU522 (SWMUU 101): Achieve Response Complete for JBC-Air in accordance with Table 1 of the PWS. One year POP. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028AC

USED-.

The CLIN extended description has changed from:

Option Task - Site TU522 (SWMUU 101): Optimize the site in support of Site Closeout for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028AD

USED-.

The CLIN extended description has changed from:

Option Task - Site TU522 (SWMUU 101): Achieve Site Closeout for JBC-Air in accordance with Table 1 of the PWS. One year POP. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.

Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CA

USED-.

The CLIN extended description has changed from:

Base Task Year 1 - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Period of Performance is three (3) years.

SUBCLIN 0028CB

The CLIN extended description has changed from:

Option Task Year 2 (FY24) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CC

USED-.

The CLIN extended description has changed from:

Option Task Year 3 (FY25) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CD

USED-.

The CLIN extended description has changed from:

Option Task Year 4 (FY26) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CE

Option Task Year 5 (FY27) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CF

USED-.

The CLIN extended description has changed from:

Option Task Year 6 (FY28) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CG

USED-.

The CLIN extended description has changed from:

Option Task Year 7 (FY29) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CH

Option Task Year 8 (FY30) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CJ

USED-.

The CLIN extended description has changed from:

Option Task Year 9 (FY31) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0028CK

USED-.

The CLIN extended description has changed from:

Option Task Year 10 (FY32) - Site TU522 (SWMUU 101): Maintain compliance with regulatory requirements and binding agreements for JBC-Air in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

CLIN 0037

The CLIN description has changed from JBC-Weapons Vapor Intrusion Study- to JBC-Weapons Vapor Intrusion Study WP-.

Option Task Year FY25 - complete basewide Vapor Intrusion Study for JBC-Weapons in accordance with paragragh 1.3.2 of the PWS. Once exercised, the Period of Performance is five (5) years. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Option Task Year FY25 - complete basewide Vapor Intrusion Study Work Plan for JBC-Weapons in accordance with paragragh 1.3.2 of the PWS. Once exercised, the Period of Performance is five (5) years. Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be

CLIN 0054

The CLIN description has changed from JBC-Weapons, Site SS012 (SWMU 112)- to JBC-Weapons, Site

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

INFO ONLY. Site SS012 (SWMU 112): Conduct RA-O and achieve alternative objective for JBC-Weapons in accordance with Table 1 of the PWS.

INFO ONLY. Site SS012 (SWMU 12): Conduct RA-O and achieve alternative objective for JBC-Weapons in

SUBCLIN 0054AA

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 3 (FY25) - Site SS012 (SWMU 112): Achieve Supplemental Site Investigation Work Plan for JBC-Weapons in accordance with Table 1 of the PWS. Five year POP. Once exercised, the Period of Performance is five (5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Option Task Year 3 (FY25) - Site SS012 (SWMU 12): Achieve Supplemental Site Investigation Work Plan for JBC- Weapons in accordance with Table 1 of the PWS. Five year POP. Once exercised, the Period of Performance is five

(5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress.

Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0054AB

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task - Site SS012 (SWMU 112): Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Option Task - Site SS012 (SWMU 12): Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to

SUBCLIN 0054AC

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task - Site SS012 (SWMU 112): Achieve Remedy Evaluation and Recommendation Report for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to

Option Task - Site SS012 (SWMU 12): Achieve Remedy Evaluation and Recommendation Report for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to

SUBCLIN 0054AD

SS012 (SWMU 12)-.

Option Task - Site SS012 (SWMU 112): Complete Pilot Study(ies)/Treatability Test(s) for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to

Option Task - Site SS012 (SWMU 12): Complete Pilot Study(ies)/Treatability Test(s) for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to

SUBCLIN 0054AE

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task - Site SS012 (SWMU 112): Achieve Revised Statement of Basis for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress.

Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Option Task - Site SS012 (SWMU 12): Achieve Revised Statement of Basis for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest. Option will be exercised upon CO determination/justification of bona fide need and contractor progress.

Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0054CC

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 3 (FY25) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Option Task Year 3 (FY25) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

SUBCLIN 0054CD

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 4 (FY26) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

Option Task Year 4 (FY26) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

SUBCLIN 0054CE

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 5 (FY27) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

Option Task Year 5 (FY27) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

SUBCLIN 0054CF

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 6 (FY28) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

Option Task Year 6 (FY28) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

SUBCLIN 0054CG

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 7 (FY29) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

Option Task Year 7 (FY29) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

SUBCLIN 0054CH

SS012 (SWMU 12)-.

Option Task Year 8 (FY30) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

Option Task Year 8 (FY30) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is three (3) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

SUBCLIN 0054CJ

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 9 (FY31) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

Option Task Year 9 (FY31) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is two (2) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

SUBCLIN 0054CK

SS012 (SWMU 12)-.

The CLIN extended description has changed from:

Option Task Year 10 (FY32) - Site SS012 (SWMU 112): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

Option Task Year 10 (FY32) - Site SS012 (SWMU 12): Maintain compliance with regulatory requirements and binding agreements for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the

CLIN 0057

INFO ONLY. Site TU927 (TU/US-C10): Conduct RA-O and achieve alternate objective for JBC-Weapons in

INFO ONLY. Site TU927 (TU/US-C10): Achieve Site Closeout.

SUBCLIN 0057AA

Option Task Year 3 (FY25) - Site TU927 (TU/US-C10): Achieve Supplemental Site Investigation Work Plan for JBC-Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

Option Task Year 3 (FY25) - Site TU927 (TU/US-C10): Optimize the site in support of Site Closeout for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any

SUBCLIN 0057AB

Option Task - Site TU927 (TU/US-C10): Achieve Advanced Site Characterization including Supplemental Site Investigation, Revised 3-D Conceptual Site Model, and Updated Groundwater Monitoring Program for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is five (5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to

Option Task - Site TU927 (TU/US-C10): Achieve Site Closeout. Once exercised, the Period of Performance is five

(5) years unless in an instance where there is not five (5) years remaining on the contract. The POP will end after five (5) years, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to the contractor.

SUBCLIN 0057AC

The CLIN description has changed from JBC-Weapons, Site TU927 (TU/US-C10)- to RESERVED, NOT

USED-.

The CLIN extended description has changed from:

Option Task - Site TU927 (TU/US-C10): Achieve Remedy Evaluation and Recommendation Report for JBC- Weapons in accordance with Table 1 of the PWS. Once exercised, the Period of Performance is one (1) year unless in an instance where there is not one (1) year remaining on the contract. The POP will end after one (1) year, or contract expiration, whichever is soonest.Option will be exercised upon CO determination/justification of bona fide need and contractor progress. Any option may be exercised at the sole discretion of the CO by written notification to

SUBCLIN 0057AD

USED-.

The CLIN extended description has changed from:

Option Task - Site TU927 (TU/US-C10): Complete Pilot Study(ies)/Treatability Test(s) for JBC-Weapons in accordance…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .