SECTION 33 49 23 SUBSURFACE DETENTION SYSTEMS
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 33 49 23
SECTION 33 49 23
SUBSURFACE DETENTION SYSTEMS
| PART 1 | GENERAL |
| 1.1 | SECTION INCLUDES |
| A. | Units for subsurface detention and infiltration systems. |
| B. | Related work includes but is not limited to: |
| 1. | Excavation, Section 31 23 16. |
| 2. | Backfilling for Structures, Section 31 23 23. |
| 1.2 | REFERENCES |
| A. | AASHTO M 252: Standard Specification for Corrugated Polyethylene Drainage Pipe. |
| B. | AASHTO M 294: Standard Specification for Corrugated Polyethylene Pipe, 300- to 1500-mm Diameter. |
| C. | ASTM D 698: Standard Test Method for Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft3 (600 kNm/m3)). |
| D. | ASTM D 1557: Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3 (2,700 kN-m/m3)). |
| E. | ASTM D 1784: Standard Specification for Rigid Polyvinyl Chloride (PVC) Compounds and Chlorinated Polyvinyl Chloride (CPVC) Compounds. |
| F. | ASTM D 2239: Standard Specification for Polyethylene (PE) Pipe (SDR-PR) Based on Controlled Inside Diameter. |
| G. | ASTM D 2564: Standard Specification for Solvent Cement for Polyvinyl Chloride (PVC) Plastic Pipe and Fittings. |
| H. | ASTM D 2657: Standard Recommended Practice for Heat Joining of Thermoplastic Pipe and Fittings. |
| I. | ASTM D 3212: Standard Specification for Joints for Drain and Sewer Plastic Pipes Using Flexible Elastomeric Seals. |
| J. | ASTM D 3261: Standard Specification for butt Heat Fusion Polyethylene (PE) Plastic Fittings for Polyethylene (PE) Plastic Pipe and Tubing. |
| K. | ASTM D 3350: Standard Specification for Polyethylene Plastics Pipe and Fittings Materials. |
| L. | ASTM F 477: Standard Specification for Elastomeric Seals (Gaskets) for Joining Plastic Pipe. |
| M. | ASTM F 667: Standard Specification for Large Diameter Corrugated Polyethylene Tubing and Fittings. |
| N. | ASTM F 1055: Standard Specifications for Electrofusion Type Polyethylene Fittings for Outside Diameter Controlled Polyethylene Pipe and Tubing. |
| O. | ASTM F 2418: Standard Specification for Polypropylene (PP) Corrugated Wall Stormwater Collection Chambers. |
| P. | ASTM F 2736: Standard Specification for 6 to 30 in. Polypropylene (PP) Corrugated Single Wall Pipe and Double Wall Pipe. |
| Q. | ASTM F 2787: Standard Practice for Structural Design of Thermoplastic Corrugated Wall Stormwater Collection Chambers. |
| 1.3 | DEFINITIONS |
| A. | Chamber System: Arched units with open bottoms interconnected by piping, headers, and/or manifolds. |
| B. | Cellular System: Open-structured units that can be placed side by side and stacked vertically to form an open-sided storage tank-like structure. |
| 1.4 | SUBMITTALS |
| A. | Manufacturer’s product data for detention system components. |
| B. | Manufacturer’s installation instructions for the system. |
| C. | Material certificates for geofabrics, granular fill and backill materials. |
| 1.5 | DELIVERY, STORAGE AND HANDLING |
| A. | Protect materials from damage during delivery. |
| B. | Store on smooth surfaces free from dirt, mud and debris. Store outside only if outside air temperatures are at or above 55 degrees Fahrenheit. |
| C. | If materials will be stored for more than four days, cover materials with tarp. |
| 1.6 | PROJECT CONDITIONS |
| A. | Review manufacturer’s installation procedures and coordinate work with other work affected. |
| B. | Do not use frozen materials or materials mixed or coated with ice or frost. |
| C. | Do not build on frozen, wet, saturated or muddy subgrade. |
| D. | Protect partially completed installation against damage from other construction traffic when work is in progress and when backfill is complete until construction is complete. |
| PART 2 | PRODUCTS |
| 2.1 | CHAMBER SYSTEM |
| A. | Chamber: |
| 1. | Polyproylene per ASTM F 2418 |
| 2. | Open-bottomed |
| 3. | Minimum Design Live Load: AASHTO H20 |
| B. | Piping, Headers, and Manifolds: Polyethylene, polypropylene, or polyvinylchloride per system manufacturer’s requirements. |
| C. | Fittings: Per system manufacturer’s requirements. |
| D. | Foundation Stone: |
| 1. | Clean, angular stone with size gradation per system manufacturer’s requirements. |
| 2. | Compact to minimum density required by system manufacturer. |
| 3. | Depth: 6”, 12”, or 18” as indicated. If not specified, depth will be 6”. |
| E. | Embedment Stone: |
| 1. | Clean, angular stone with size gradation per system manufacturer’s requirements. |
| 2. | Unless otherwise required by system manufacturer, do not compact embedment stone. |
| 3. | Depth above top of chambers: Minimum of 6”. |
| F. | Fill Material: |
| 1. | Minimum depth: 8” or as required by system manufacturer. |
| 2. | Maximum depth: Per system manufacturer. |
| 3. | Material: |
| a. | 6” to 18” above chamber: Granular well-graded soil or aggregate mixture per system manufacturer’s requirements. |
| b. | Greater than 18” above chamber: Native soils free from organic and deleterious materials, as indicated, or as otherwise required by system manufacturer. |
| 4. | Compaction per system manufacturer’s requirements. |
| G. | Geotextile: Per system manufacturer’s requirements. |
| 2.2 | CELLULAR SYSTEM |
| A. | Cells: Manufactured from a plastic material. |
| 1. | Minimum Design Load: AASHTO H20 |
| 2. | Maximum Depth: 11’ from bottom of cellular units to finish grade. |
| B. | Base: |
| 1. | Minimum of 6” of crushed stone per system manufacturer’s requirements. |
| 2. | Compaction per system manufacturer’s requirements. |
| C. | Side Fill: |
| 1. | Minimum of 12” width. |
| 2. | Crushed stone per system manufacturer’s requirements. |
| 3. | Compaction per system manufacturer’s requirements. |
| D. | Top Fill: A minimum of 12” of crushed stone or roadbase material per system manufacturer’s requirements. |
| 1. | Minimum Cover: 24” from the top of the cellular units to finish grade. |
| 2. | Maximum Cover: 36” from the top of the cellular units to finish grade. |
| E. | Geogrid: Per manufacturer’s requirements. |
| F. | Geotextile: Per manufacturer’s requirements. |
| G. | Maintenance ports, cleanouts, and pipe inlets and outlets: Prefabricated per manufacturer’s requirements. |
| PART 3 | EXECUTION |
| 3.1 | PREPARATION |
| A. | Excavate to limits indicated. |
| B. | Prepare subgrade according to system manufacturer’s requirements. Bottom shall be smooth, level, and free of lumps or debris. |
| 3.2 | INSTALLATION |
| A. | Install subsurface detention system components according to system manufacturer’s installation instructions. |
| B. | Backfill according to system manufacturer’s requirements. Do not backfill until COR has accepted system component installation. |
| 3.3 | CLEANING |
| A. | Perform cleaning during the installation of the work and upon completion of the work. |
| B. | Remove from site all excess materials, debris, and equipment. |
| C. | Repair any damage to adjacent materials and surfaces resulting from installation of the work. |
END OF SECTION