SECTION 32 11 23 UNTREATED AGGREGATE BASE COURSE (UTBC)

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 11 23

SECTION 32 11 23

UNTREATED AGGREGATE BASE COURSE (UTBC)

PART 1 GENERAL

1.1SECTION INCLUDES
A.Production, construction, and compaction of UTBC used for pavements, shoulders, and incidental construction.
1.2REFERENCES
A.AASHTO T 11: Materials Finer than 75-m (No. 200) Sieve in Mineral Aggregates by Washing
B.AASHTO T 19: Bulk Density (“Unit Weight”) and Voids in Aggregate
C.AASHTO T 27: Sieve Analysis of Fine and Coarse Aggregates
D.AASHTO T 89: Determining the Liquid Limit of Soils
E.AASHTO T 90: Determining the Plastic Limit and Plasticity Index of Soils
F.AASHTO T 96: Resistance to Degradation of Small-Sized Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine
G.AASHTO T 180: Moisture-Density Relations of Soils Using a 4.54 kg (10 lb) Rammer and 457 mm (18 in) Drop
H.AASHTO T 193: The California Bearing Ratio
I.AASHTO T 255: Total Evaporable Moisture Content of Aggregate by Drying
J.AASHTO TP 61: Determining the Percent of Fracture in Coarse Aggregate
K.UDOT Minimum Sampling and Testing Requirements
1.3SUBMITTALS
A.Submit a written report for approval for each aggregate class and source, a minimum of seven days prior to placement. Include the following:
1.Aggregate suitability. Refer to this Section, Part 2, Products.
2.Name of supplier and location of source.
3.Maximum Dry Density and Optimum Moisture Content. Refer to AASHTO T 180, Method D.
4.Job mix gradation including single values for each sieve size, No. 4 and finer, within the gradation limits of Table 3.
1.4ACCEPTANCE
A.General:
1.COR is not obligated to accept changes in gradation target after any material is delivered to site.

2. Observation of CONTRACTOR’s field quality control testing does not constitute acceptance. Such testing; however, may be used by COR for acceptance if the following conditions are met.

a. COR accepts qualifications of CONTRACTOR’s testing agency.

b. CONTRACTOR has a quality control plan similar to AASHTO R 9.

c. Test results are submitted promptly.

d. Acceptance criteria are met.

B.Gradation: Lot size is 500 cubic yards. Collect samples from grade prior to compaction. Conduct at least one test for each lot. Material not within tolerance may remain in-place at COR’s discretion provided density requirements are met. Tolerance deficiency must be corrected before placement continues.
C.Relative Density: Lot size is 10,000 cubic yards. Conduct at least 1 laboratory determination to be used as a standard for field density and field moisture content determinations.
D.Field Density:
1.Lot size is one days’ placement. Number of density tests varies according to placement type and sub-lot size. Conduct at least 1 field determination in each sub-lot. Select test locations randomly.

Table 1: Placement Type and Sublot Size

Placement Type I:

Pavement (includes curb, gutter, and waterways)

1,000 square yards

Placement Type II:

Sidewalk Driveways, Pedestrian Access Ramps, Flatwork

400 lineal feet 800 square feet

Placement Type III:

Landscape and other non-structural, non-load bearing areas

2,000 square yards

E.Class A aggregate, Table2: Pavement Section includes placement for Curb, Curb and Gutter, and Waterways.
1.The Contractor takes random samples from the grade and tests for moisture, gradation, and laboratory density, and performs In-place Density determinations.
2.Meet gradation limits and applicable tolerances of Table 3 for each gradation test. Each sublot will be evaluated separately and not averaged with other sublots.
3.Meet minimum density test average of 97 percent of maximum laboratory density with no test less than 94 percent.
F.Class B aggregate, Table 2: Incidental includes placement for Driveways, Pedestrian Access Ramps, Sidewalk, Flatwork, and other similar items of work.
1.The Contractor takes random samples from the grade and tests for moisture, gradation, and laboratory density, and performs In-place Density determinations.
2.Meet gradation limits and applicable tolerances of Table 3 for each gradation test. Each sublot will be evaluated separately and not averaged with other sublots.
3.Meet minimum density test average of 95 percent of maximum laboratory density with no test less than 92 percent.
G.Class C aggregate, Table 2: Shoulder
2.Adjust moisture content prior to compaction.
H.Class D aggregate, Table 2: Pipe Trench backfill.
1.The Contractor takes random samples from the grade and tests for moisture, gradation, and laboratory density, and performs In-place Density determinations.
2.Unless otherwise specified by the pipe manufacturer, meet the following requirements:
a.Gradation limits for 3/4" aggregate and applicable tolerances of Table 3 for each gradation test. Each sub-lot will be evaluated separately and not averaged with other sub-lots.
b.Minimum density test average of 95 percent of maximum laboratory density with no test less than 92 percent.
I.Correct material that does not meet the specified criteria by scarifying, placing additional material, re-mixing, reshaping and re-compacting when directed by the COR. Rework unacceptable material at no additional cost to the Government.
J.Do not place additional material on any unaccepted layer.
K.Remove products found defective after placement and replace with acceptable products at no additional cost to the Government when directed by the COR.

PART 2 PRODUCTS

2.1 AGGREGATES

A. Well-graded, clean, hard, tough, durable and sound mineral aggregates consisting of crushed stone, crushed gravel or crushed slag; free of organic matter and contamination from chemical or petroleum products; meeting the requirements of Table 2.

Table 2: Aggregate Properties

Physical Property Aggregate Class

A
B
C
AASHTO Test

D ASTM Test

Dry Rodded Unit Weight
Not less than 75 lb/ft3
T 19
Not less than 75 lb/ft3
C 29
Liquid Limit/ Plastic Index
LL 25/Non-plastic
LL 25/ PI 6
T 89
LL 25/ PI 6
D 4318
Aggregate Wear
Not to exceed 50 %
T 96
Not to exceed 50 %
C 131
Gradation
Table 3
T 11

T 27

Table 3
C 136
CBR with a 10 lb surcharge measured at 0.20 inch penetration
70% Min
40% Min
T 193

70% Min D 1883

Two Fractured Faces
90 % Min
50% Min
50% Min
TP 61
50 % Min
D 5821

NOTES:

(a) Liquid limit, plastic limit: Passing No. 40 sieve.

(b) Wear: Retained on No. 8 sieve.

(c) CBR: Use a 10 lb surcharge measured at 0.20 inch penetration at 95 percent of modified Proctor.

(d) Faces: Retained on No. 4 sieve.

B. Establish the job mix (target) gradation for the 3/4 inch sieve and finer within the gradation limits. The Job Mix Gradation Tolerance is the allowable deviation from the job mix (target) gradation on the applicable sieves. All other percents passing will be within the gradation limits. Refer to AASHTO T 11 and AASHTO T 27.

Table 3: Gradation Limits

Sieve Size Gradation Target Band

1-1/2” Gradation Tolerance

1" Gradation Tolerance

3/4" Gradation Tolerance

1½ inch 1 inch ¾ inch ½ inch ⅜ inch No. 4 No. 16 No. 200

90 - 100 70 - 85 65 – 80 55 - 75 40 - 65 25 - 40 7 - 11

±9.0 ±9.0 ±9.0 ±7.0 ±5.0 ±3.0

79 – 91 49 – 61 27 – 35 7 – 11

±9.0 ±7.0 ±5.0 ±3.0

78 – 92 55 – 67 28 – 38 7 – 11

±9.0 ±7.0 ±5.0 ±3.0

Percent passing based on total aggregate (dry weight), and fine and coarse aggregate having approximately the same bulk specific gravities.

PART 3 EXECUTION

3.1INSTALLATION
A.Mixing: Provide moisture content of ± 2 percent of optimum at the time of placement. Refer to AASHTO T 180, Method D and AASHTO T 255.
B.Procedures for changing the Job-Mix Gradation
1.Submit changes in writing 48 hours prior to placement for approval by the COR.
C.Placing: Place in layers of uniform thickness and compact each layer to a thickness not to exceed a 6 inch depth. Do not place on any frozen surface.
D.Finishing: Uniform line and grade with surface deviations no more than ⅜ inch in 10 ft in any direction.
1.Profile Tolerance: Correct any profile deviations greater than ⅜ inch at no additional cost to the Government.
a.Rework minimum of 4-inch lift to achieve homogeneous density.
b.Determine limits of correction based on extent of deviation.
c.Continue finishing until existing deviation is less than ⅜ inch.
E.Compaction: Maintain optimum moisture content ± 2 percent.
1.Use appropriate compaction equipment adjacent to abutments, backwalls, approach slabs, wing walls, retaining walls, and other structures.
2.95 percent minimum unless otherwise indicated on the plans or directed by the COR.

END OF SECTION