SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx

DOCX document 22 KB Posted

Attached to
Dugway Proving Ground, Utah Road Maintenance
Solicitation number
W911S6-17-B-0001
Issued by

About this file

SECTION 33 11 11 RELOCATE WATER METERS AND FIRE HYDRANTS

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 33 11 11

SECTION 33 11 11

RELOCATE WATER METERS AND FIRE HYDRANTS

PART 1GENERAL
1.1SECTION INCLUDES
A.Relocate existing water meters or fire hydrants which may be necessary because of changes in grade or installation of new improvements which conflict with existing meter and hydrant locations.
1.2REFERENCES
A.AWWA C203: AWWA Standard for Coal-Tar Protective Coatings and Linings for Steel Water Pipelines - Enamel and Tape - Hot-Applied.
B.AWWA C502: AWWA Standard for Dry-Barrel Fire Hydrants.
1.3JOB CONDITIONS
A.Secure utility company permit to do relocation work and pay applicable fees.
B.Secure utility company approval of joints, connections, and pipe installations prior to commencing backfill operations.
PART 2PRODUCTS
2.1HYDRANTS
A.Use existing hydrant unless Contract Documents specify Contractor will provide a new unit.
B.Use the same type of pipe material as used for existing hydrant piping unless indicated otherwise.
C.Use mechanical and flange joint fittings unless indicated otherwise. Use only new tees, fittings, and bends.
D.Coat all weld connections and damaged areas of metal piping with coal tar enamel. Follow AWWA C203 requirements. Tape wrap coatings.
2.2WATER SERVICE METERS
A.Use existing water meter and yoke unless Contract Documents specify Contractor will provide a new unit.
B.When relocating meters, use Type K copper pipe (Section 33 05 03) or polyethylene pipe (Section 33 05 06) from main to meter yoke.
2.3CONCRETE
A.Cast-in-place: Class 3000 or 4000, Section 03 30 04.
PART 3EXECUTION
3.1PREPARATION
A.Before commencing work, coordinate location and shutdown of utility lines with utility company and residents; Section 01 31 13.
B.Protect existing hydrants and meters from damage.
C.Control ground water, surface water, and storm water.
D.Control pedesrian and vehicular traffic, Section 01 55 26.
E.Provide all excavation backfill, compaction, connections, testing, and surface restorations to made the installation complete.
3.2MOVING EXISTING HYDRANTS
A.Relocate to locations indicated.
B.Do not disturb location of hydrant lateral tee at water main.
C.The method of harnessing the hydrant (reshackling or reblocking) shall match existing conditions or approval of COR.
D.Install hydrant so base flange is even with or less than 4 inches above grade of surrounding surface.
3.3RECONNECTING EXISTING HYDRANTS
A.Hydrant reconnections shall meet new work requirements indicated in Section 33 12 19.
B.When existing tee on water main is to be moved to new location, seal and shackle old tee.
3.4HYDRANT BARREL EXTENSIONS
A.Follow AWWA C502 to extend barrels, operating stems and flanged adapters in design material and workmanship so hydrant base flange is even with or less than 4 inches above grade of surrounding surface.
3.5RESETTING WATER METERS
A.Follow Section 33 12 33 to relocate water meters and service connections to locations indicated.
B.Follow Section 33 05 14 to adjust meter boxes to grade in paved surfaces.
3.6FIELD QUALITY CONTROL
A.Hydrostatic tests, Section 33 08 00.
B.Disinfection, Section 33 13 00.

END OF SECTION