Section_01_55_26_Traffic_Control.docx

DOCX document 30 KB Posted

Attached to
Dugway Proving Ground, Utah Road Maintenance
Solicitation number
W911S6-17-B-0001
Issued by

About this file

SECTION 01 55 26 TRAFFIC CONTROL

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 55 26

SECTION 01 55 26

TRAFFIC CONTROL

PART 1GENERAL
1.1SECTION INCLUDES
A.Providing operation and maintenance equipment, services, personnel, traffic control and protective devices, as required to expedite vehicular traffic flow on haul routes, at work site entrances and exits, on-site access roads, and parking areas.
B.Maintain rights of public.
1.2REEFERENCES
A.ASTM D 4956: Retroreflective Sheeting for Traffic Control.
B.Instructions to Flaggers. Publication of UDOT.
C.Work Zone Traffic Control Guide: Publication of the Utah LTAP Center.
D.MUTCD: Manual on Uniform Traffic Control Devices for Streets and Highways (MUTCD).
1.3SUBMITTALS
A.Submit traffic control plan to Contracting Officer 14 days prior to beginning work .
B.Submit copy of flagger or traffic control technician certification when requested by Contracting Officer.
1.4TRAFFIC CONTROL PLAN
A.Create a traffic control plan using the following resources. Resolve discrepancies between resources in descending order shown.
1.MUTCD.
2.Work Zone Traffic Control Guide.
3.ATSSA.
B.Include the following documentation as part of the traffic control plan.
1.Written description of phasing.
2.Drawing showing phasing (if required for clarity).
3.Drawing showing placement of traffic control devices.
C.Show how to move pedestrians through or around the Work site.
D.Show how to handle signalized intersections.
E.Meet grade, slope and protection requirement of the Americans with Disabilities Act (ADA).
1.5TRAFFIC CONTROL TECHNICIAN
A.Certified by ATSSA or AGC.
1.6FLAGGER
A.Certified by ATSSA, AGC or UDOT.

B. Equipment:

1.24” x 24” “Stop/Slow” sign.
2.6” to 8” long red wand for night flagging.
3.Light plant for night flagging.

C. Clothing:

1.Clothed; full length pants and long or short sleeved shirt.
2.Hard toed shoes.
3.Orange, red-orange hardhat and vest.
4.Night clothing to be reflectorized.
PART 2PRODUCTS
2.1PAVEMENT MARKINGS
A.MUTCD.
B.Channelizing Devices: Crash worthy plastic cones, drums and barricades.
C.Reflective Sheeting: ASTM D 4956.
D.Pavement Markings: Section 32 17 23.
PART 3EXECUTION
3.1FLAGGING
A.MUTCD.
3.2TRAFFIC CONTROL DEVICES AND SIGNS
A.Install before work activities begin.
B.Maintain to ensure proper, continuous function.
C.Remove when no longer needed.
3.3ILLUMINATION
A.Provide illumination and lighting during periods of low visibility:
1.To clearly delineate traffic lanes and to guide traffic.

2. For use by flaggers in directing traffic.

1) For use by flaggers in all night construction activities.

B.Provide illumination in critical traffic and parking areas.
3.4CONSTRUCTION PARKING CONTROL
A.Control vehicular parking. Do not interfere with public traffic or parking, access by emergency vehicles, the Government’s operations, or construction operations.
B.Monitor parking of private vehicles:

1. Maintain free vehicular access to and through parking areas.

2. Prohibit parking on or adjacent to access roads, or in non-designated areas.

3. Maintain fire and emergency vehicle access.

3.6HAUL ROUTES
A.Consult with Contracting Officer to establish public thoroughfares which will be used as haul routes and site access.
B.Restrict haul routes to those shown on the Drawings, unless otherwise approved by the Contracting Officer.
C.Furnish road signs, barricades, safety lights, signals, and flag personnel at no additional cost to the Government. Provide traffic control at critical areas of haul routes to safely expedite traffic flow and minimize interference of normal public traffic.
D.Maintain hard surface haul roads in a clean condition with no accumulation of dirt, debris, or other foreign objects. Do not allow accumulation of debris or other foreign objects in haul roads.
E.Prior to acceptance of Work, haul roads shall be restored to the condition existing prior to the start of construction at no additional cost to Government.

END OF SECTION

TRAFFIC CONTROL Page 2

File details come from the government source that posted it. Updated .