SECTION 32 01 16 RECYCLED ASPHALT PAVING
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 32 01 16
SECTION 32 01 16
RECYCLED ASPHALT PAVING
| PART 1 | GENERAL | |
| 1.1 | SECTION INCLUDES | |
| A. | Placing RAC in base, leveling, or surface courses. | |
| B. | Mix design requirements. | |
| 1.2 | REFERENCES | |
| A. | ASTM D 2950: Standard Test Method for Density of Bituminous Concrete In Place by Nuclear Method. | |
| B. | ASTM D 3549: Standard Test Method for Thickness or Height of Compacted Bituminous Paving Mixture Specimens. | |
| 1.3 | DEFINITIONS | |
| A. | RAP (reclaimed asphalt pavement): Product of bitumen and aggregate recovered from milling an asphalt concrete pavement. No roadbase or Subgrade materials are contained in RAP. | |
| B. | RAC (recycled asphalt concrete): Product of mixing RAP, new aggregates and asphalt cement or recycle agent or both. | |
| 1.4 | SUBMITTALS | |
| A. | Prior to commencing work of this Section, submit. | |
| 1. | Traffic control plan, Section 01 55 26. | |
| 2. | A list of equipment to be used. | |
| 3. | Type of asphalt to be used, Section 32 12 03. | |
| B. | RAC Mix Design: Determine the conditions and properties of the existing materials. Identify recycling agent and submit the following data as applicable. | |
| 1. | When the amount of RAP is 15 percent or less of the RAC, submit a design mix formula if Supplier does not have a design mix formula at the plant. The formula shall be based on current test data. | |
| 2. | When the amount of RAP added to the RAC is over 15 percent, submit a design mix formula. | |
| C. | RAC Delivery Tickets: Section 32 12 17. | |
| PART 2 | PRODUCTS | |
| 2.1 | MATERIAL | |
| A. | Recycled Asphalt: RA grade, Section 32 12 03: | |
| B. | Tack Coat: Section 32 12 14. | |
| C. | Paving Geotextile: Section 31 05 19. | |
| D. | Paving Geogrid: Section 31 05 21. | |
| 2.2 | RECLAIMED ASPHALT PAVEMENT (RAP) AGGREGATE | |
| A. | Free of detrimental quantities of deleterious materials, with a minimum sand equivalent value of 50 and graded (on a non-dried basis) as follows. |
| Sieve |
| Percent Passing by Weight |
| 1-1/2” |
| 100 |
| 1” |
| 90 |
| PART 3 | EXECUTION |
| 3.1 | CONSTRUCTION EQUIPMENT |
| A. | Laydown Machine: Provide track equipment when operating on fabrics or geogrid, otherwise type of equipment to be provided is Contractor’s choice. |
| B. | Compactors: Steel wheeled static or vibratory. Any use of a pneumatic tire roller is for intermediate compaction only. |
| 3.2 | PREPARATION |
| A. | General: |
| 1. | Coordinate utility location, Section 01 31 13. Contact utility companies and other agencies, for dangerous concentration of combustible, flammable, or explosive matter. |
| 2. | Lower Street Fixtures if Pavement recycler machine is not capable of releasing Pavement-cutting mechanism to protect fixtures. |
| 3. | Remove plant materials from cracks, edges and joints. Sweep surface clean. Blow cracks clean. |
| 4. | Stabilize portland cement concrete Subgrade slabs, if applicable. |
| 5. | Apply tack coat, Section 32 12 14. |
| 6. | Verify that surfaces are dry. |
| B. | Trees, Plants, Ground Cover: Protect trees, plants and other ground cover from damage. |
| C. | Traffic Control: |
| 1. | Control pedestrian and vehicular traffic, Section 01 55 26. |
| 2. | Protect pavement from traffic until mixture has cooled enough not to become marked. |
| 3. | Apply temporary traffic and lane marking tape or paint after layout and placement has been verified with COR. |
| D. | Milling, Section 02 41 14 |
| 3.3 | PLACING RAC |
| A. | Hot-laid RAC, Section 32 12 16. |
| B. | Cold-laid RAC, Section 32 12 17. |
| C. | Mix and blend milled aggregate, recycling asphalt, virgin asphalt and virgin aggregate per the mix design. |
| 3.4 | TOLERANCES |
| A. | Compaction, lift thickness, grade, cross slope, Section 32 12 17. |
| B. | Complete compaction of RAC within 5 minutes of placing RAC and before its temperature drops below 200 deg. F. |
END OF SECTION