Dugway Proving Ground, Utah Road Maintenance

Award Notice Posted

Solicitation number
W911S6-17-B-0001
Agency
Awarded
to Ml-Tkl Construction JV
Set-aside
Competitive 8(a)

Opportunity facts

Contract number
W911S617D0002 Federal IDV award
PSC
Not on record
Place of performance
Dugway, Utah 84022, United States

Notice details come from SAM.gov. Updated .

Notice text

5 versions

Update #5 · Latest ·

*****Bonding

The IFB submittal does not require any bonding details or submission of bonds.


W911S6-17-B-0001 SF 1442 12A states: "The contractor must furnish any required performance and payment bonds 10 calendar days after award".


Bonds and bond details will be addressed at the time of award. Time of award is estimated for 05 May 2017.


The closing date remains 30 March 2017 at 1:00PM PDT.

Update #4 ·

***Posting of W911S6-14-B-0001-0001.  See attached amendment and revised Technical Exhibit A-E

Update #3 ·

******Title: Questions and Answers for W911S6-17-B-0001 DPG Road Maintenance IFB.

The following questions were received in reference to IFB solicitation W911S6-17-B-0001.


Question 1:
The break out of mobilization to achieve the most efficient price point to the government. How will the task orders be awarded in multiple/grouped task orders or one at a time....What formula would be the best to apply for mobilization?


Answer 1:
Task orders can be awarded one at a time or in multiple orders. Earlier in the fiscal year task orders are more likely awarded one at a time. The closer to fiscal year end, the more likely multiple task orders will be awarded. In FY 16 the task orders were awarded as a group. When multiple task orders are awarded, the period of performance is usually staggered to allow equipment to move from job to job. An amendment is forthcoming which shall change the solicitation Statement of
Work, adding section 1.4.2.8 Issuance of Task Orders Per Year.


Question 2:
Line item # 18 uses a unit of measure YM what is that unit of measurement I.E. yard per mile? Question is referencing Technical Exhibit A-E.


Answer 2:
Line Item # 18 YM is Cubic Yard Per Mile.
An amendment is forthcoming which shall clarify in the Technical Exhibits A Through E, by stating the meaning of all the abbreviated measurements.


 

Update #2 ·

Adding site visit slides from 15 March site visit

Update #1 ·

Mission and Installation Contracting Command (MICC), Joint Base Lewis-McChord (JBLM), Washington, anticipates issuing an award for a contract to execute for a broad range of paving projects to include airfield and roadway pavements in support of the Directorate of Public Works (DPW) located at Dugway Proving Ground,
Utah.

This acquisition is 100% 8(a) set aside restricted to Offerors located in the SBA Utah District Office or 8(a) firms with a bonafide place of business within the Utah District; no other bids will be accepted for this procurement.

Files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_04_05_16_Masonry_Mortar_and_Grout.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_32_01_17_Pavement_Crack_Seal.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_31_23_23.13_Backfilling_for_Structures.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
SECTION_01_31_13_Coordination.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
Section_02_41_00_Demolition.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_32_12_03_Asphalt_Material.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_10_14_53_Traffic_Signage.docx DOCX document
RFP_W911S6-17-B-0001.pdf PDF
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_03_30_00_Concrete.docx DOCX document
SECTION_03_35_00_Concrete_Finishing.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
SECTION_32_16_00_Driveway_Sidewalk_Curb_Gutter.docx DOCX document
SECTION_31_23_16_Excavation.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
Section_32_12_13_Prime_Coat_Tack_Coat.docx DOCX document
section_31_05_13_Common_fill.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_33_49_23_Storm_Drainage_Water_Retainage_Structures.docx DOCX document
SECTION_32_05_10_Backfilling_Roadways.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_01_00_00_General_Requirements.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_01_45_00_Quality_Control.docx DOCX document
SECTION_32_13_13_Concrete_Paving.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_01_24_Hot_In-Place_Recycling.docx DOCX document
SECTION_31_23_33_Backfilling_Trenches.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
W911S6-17-B-0001_2017_Dugway_Wage_Determination_23FEB17.pdf PDF
SECTION_03_30_10_Concrete_Placement.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

Notice history

Notice Type Posted
Dugway Proving Ground, Utah Road Maintenance Latest Award Notice
This notice Award Notice
Dugway Proving Ground, UT Road Maintenance Original Award Notice