SECTION 32 01 13.61 SLURRY SEAL
View the file
Other files
Show 40 more
Latest 50 of 87 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION 32 01 13.61
SECTION 32 01 13.61
SLURRY SEAL
| PART 1 | GENERAL |
| 1.1 | SECTION INCLUDES |
A. Products and procedures for mixing and spreading a properly proportioned mixture of fine graded aggregate, mineral filler, emulsified asphalt, and water.
B. Products and procedures for a cured slurry with a homogeneous appearance, firm surface adhesion, and skid resistant texture.
| 1.2 | REFERENCES | |
| A. | AASHTO M 17: Standard Specification for Mineral Filler for Bituminous Paving Mixtures | |
| B. | AASHTO M 29: Standard Specification for Fine Aggregate for Bituminous Paving Mixtures | |
| C. | AASHTO M 208: Standard Specification for Cationic Emulsified Asphalt | |
| D. | AASHTO T 11: Material Finer than 75 µm (No. 200) Sieve in Mineral Aggregate | |
| E. | AASHTO T 27: Sieve Analysis of Fine and Coarse Aggregates | |
| F. | AASHTO T 96: Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine | |
| G. | AASHTO T 104: Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate | |
| H. | AASHTO T 176: Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test | |
| I. | AASHTO T 278: Surface Frictional Properties Using the British Pendulum Tester | |
| J. | AASHTO T 279: Accelerated Polishing of Aggregates Using the British Wheel | |
| K. | ISSA A105 Guidelines | |
| L. | UDOT Minimum Sampling and Testing Requirements Section 508 Asphalt Emulsiong Quality Management Plan | |
| 1.3 | SUBMITTALS | |
| A. | Submit Mix Design and test results to the COR a minimum of 14 days prior to beginning construction. | |
| 1. | Meet the requirements of this Section, article 2.7. | |
| 2. | Include target gradation for combined aggregate and mineral filler. | |
| B. | Provide test reports for aggregate. | |
| 1. | Meet the requirements of this Section, article 2.2. |
C. Provide a Manufacturer’s Certificate of Compliance for Mineral Filler.
D. Provide verification that the emulsified asphalt supplier adheres to UDOT Minimum Sampling and Testing Requirements Section 508 Asphalt Emulsion Quality Management Plan.
| 1. | Provide a certificate of analysis/compliance from the manufacturer for each shipment. |
| 1.4 | QUALITY ASSURANCE |
A. Determine emulsion weights by mix design.
B. Do not change source of emulsified asphalt or aggregate without COR’s written concurrence.
C. Reject coating products that do not meet requirements of this Section.
D. Remove any product found defective after installation and install acceptable product at no additional cost to the GOVERNMENT.
1.5 WEATHER
A. Do not apply slurry seal during rain, when road surface moisture is present, or during other adverse weather conditions.
B. Do not apply slurry seal if either the pavement or air temperature is below 50 degree F and falling. Slurry seal may be applied when both the pavement and air temperatures are above 45 degrees F and rising.
C. Do not apply slurry seal when the temperature is projected below 33 degrees F within 24 hours of placing slurry seal.
D. Cease slurry seal operations when weather or other conditions prolong opening road surface to traffic beyond two hours.
1.6 ACCEPTANCE
A. Acceptance of slurry seal is by lot. One lot is one day’s production. One sub-lot is 500 tons. Acceptance occurs if:
1. The average gradation of each sieve of 5 aggregate samples is within the specified gradation band for that sieve.
2. The number of individual aggregate samples in each lot outside the band does not exceed 2.
3. The number of individual aggregate samples are not outside the band by more than 2 percent on any one sieve.
| B. | Opening slurry seal surface to traffic does not constitute acceptance. | |
| PART 2 | PRODUCTS | |
| 2.1 | EMULSIFIED ASPHALT |
A. Use a cationic emulsified asphalt grade CQS-1H as specified in AASHTO M 208.
B. Use a polymer modified emulsion CQS-1HP, meeting CQS-1H specifications identified in AASHTO M 208 and ISSA A 105, using solid synthetic rubber or latex material.
| 1. | Combine the polymer modifier with the base asphalt or asphalt emulsion at a minimum rate of 3 percent solids by weight of asphalt, prior to loading at the manufacturing plant. |
| 2. | Use a polymer modified emulsion compatible with the mix design developed for the conventional slurry seal. |
C. Verify that the shipment is the same as the mix design.
D. Adhere to UDOT Minimum Sampling and Testing Requirements Section 508 Asphalt Emulsion Quality Management Plan.
| 2.2 | WATER | |
| A. | Potable and free from harmful salts and contaminants. | |
| 2.3 | AGGREGATE |
A. Use 100 percent manufactured sand, slag, crushed fines, or a combination. Refer to AASHTO M 29.
B. Use aggregate that is clean and free from organic matter or other detrimental substances.
C. Use an aggregate blend with a sand equivalent of 45 or more. Refer to AASHTO T 176.
D. Meet a minimum polishing value of 31. Refer to AASHTO T 278 and AASHTO T 279.
E. Use aggregate with 35 percent or less loss by abrasion. Refer to AASHTO T 96.
F. Meet 15 percent soundness maximum using Na2 SO4. Refer to AASHTO T 104.
2.4 MINERAL FILLER
| A. | Use portland cement, hydrated lime, or aluminum sulfate. Refer to AASHTO M 17. | |
| 2.5 | COMBINED AGGREGATE AND MINERAL FILLER | |
| A. | Use a job mix or target gradation within the gradation band. Base the mix design on this gradation. The percent passing each sieve after the target gradation has been submitted will not vary by more than the stockpile tolerance and still remain within the gradation band. Refer to AASHTO T 11, AASHTO T 27, and Table 1. |
Table 1: Gradation
Sieve Size
| Gradation Band (% Passing) |
| Stockpile Tolerance |
| ⅜ inch |
| 100 |
| No. 4 |
| 70-90 |
| +/- 5% |
| No. 8 |
| 45-70 |
| +/- 5% |
| No. 16 |
| 28-50 |
| +/- 5% |
| No. 30 |
| 19-34 |
| +/- 5% |
| No. 50 |
| 12-28 |
| +/- 4% |
| No. 100 |
| 7-18 |
| +/- 3% |
| No. 200 |
| 5-15 |
| +/- 2% |
| 2.6 | ADDITIVES | |
| A. | Use additives as required to accelerate or retard the break-set of the slurry seal or to improve the resulting finished surface. | |
| 1. | Determine the initial additive quantities by the mix design for the slurry mix or individual materials. | |
| 2. | Obtain COR approval. | |
| 2.7 | SLURRY SEAL MIX DESIGN | |
| A. | Provide the COR with the test results and the proposed mix design from a UDOT approved laboratory conforming to the following tests in ISSA A105. | |
| 1. | Use the same materials and aggregate gradation to be used on the project. |
Table 2: Tests
| ISSA TEST NO. |
| DESCRIPTION |
| SPECIFICATION |
| ISSA TB 106 |
| Slurry Seal Consistency |
| 2cm Minimum; 3cm Max. |
ISSA TB-139
(For quick-traffic systems) Wet Cohesion 30 Minutes Minimum (Set) Wet Cohesion 60 Minutes Minimum 12 kg-cm Minimum
20 kg-cm Minimum
ISSA TB 109
(For heavy-traffic areas only)
| Excess Asphalt by LWT Sand Abrasion |
| 50 g/ft2 Maximum |
(538 g/m2 Maximum)
| ISSA TB-114 |
| Wet Stripping |
| Pass (90% Minimum) |
| ISSA TB-100 |
| Wet-Track Abrasion Loss, One-hour Soak |
| 75 g/ft2 (807 g/m2) |
| ISSA TB-113 |
| Mix Time** |
| Controllable to 180 Seconds Minimum |
** Perform the mixing test and set-time test at the highest temperatures expected during construction.
| 2.8 | EQUIPMENT | |
| A. | Use only a machine designed and manufactured specifically for blending, mixing, and placing slurry seal. | |
| 1. | Mix the material in a self-propelled, slurry seal mixing machine of either truck-mounted or continuous-run design. | |
| a) | Continuous-run machines: equipped to self-load materials while continuing to lay slurry seal. | |
| b) | Either type machine: accurately deliver and proportion the aggregate, emulsified asphalt, mineral filler, control setting additive, and water to a revolving mixer and to discharge the mixed product on a continuous-flow basis. | |
| 2. | Maintain sufficient storage capacity within the machine for aggregate, emulsified asphalt, mineral filler, control additive and water to maintain an adequate supply to the proportioning controls. | |
| B. | Calibrate each mixing unit in the presence of the Engineer before a machine is used on a project. | |
| C. | Provide a lateral control device and a flexible strike-off capable of being adjusted to lay the slurry at the mix design rate of application. | |
| PART 3 | EXECUTION | |
| 3.1 | STOCKPILE | |
| A. | Construct individual 500-ton stockpiles of slurry seal aggregates. | |
| 1. | COR approves stockpiles a minimum of one and a maximum of seven days prior to use. | |
| B. | Notify the COR a minimum of seven calendar days prior to slurry seal placement in order for the initial stockpiles samples and tests to be reviewed for acceptance. | |
| C. | Obtain the COR’s written acceptance of all stockpiles prior to use in slurry seal. | |
| D. | Remove material not meeting specifications from the stockpile area. | |
| E. | Retest corrected material for acceptance. | |
| 3.2 | PREPARATION |
A. Repair any holes, raveled areas, or low areas by tacking and filling with asphalt concrete.
B. Seal all cracks with cutback asphalt. Allow crack seal to dry before surfacing.
C. Protect manholes, valve boxes, drop inlets and other service utility entrances prior to surfacing.
D. Clean the surface of all dirt, sand, dust, oil, and other objectionable material immediately prior to applying the slurry.
E. Allow cracks to dry thoroughly before applying slurry seal when using water to clean the surface.
F. Build stockpiles and receive acceptance of aggregate from the COR prior to starting slurry work.
G. Tack coat high-absorbent asphalt surfaces and polished and slick surfaces.
3.3 TRAFFIC CONTROL
A. Follow Section 01 55 26 requirements.
B. Direct traffic through work with traffic control devices to provide worker and public safety.
C. The length of time before traffic is permitted to use the surface depends on the type of slurry seal mix characteristics and weather conditions.
3.4 APPLICATION
A. Pre-wet the entire surface by fogging ahead of the slurry box. Do not over apply, causing free water to sit on the pavement in front of the slurry box.
B. Carry a sufficient amount of slurry in all parts of the spreader at all times so that full width and complete coverage is obtained with no streaks or narrow spots. Avoid overloading the spreader.
C. Apply slurry mixture of proper consistency at an average rate of 18 to 22 lb/yd2.
D. Do not add additional water for any reason, once the mixture has been placed onto the road surface.
| E. | Remove and replace the slurry if any of the following occurs: |
| 1. | Lumping, balling, or unmixed aggregates. |
| 2. | Separation of the coarse aggregate from the emulsion and fines. |
| 3. | Settling of the coarse aggregate to the bottom of the mix. |
| 4. | Excessive breaking of emulsion inside the spreader box. |
| 5. | Streaking caused by oversized aggregate. |
| F. | Use hand squeegees to spread slurry in areas that cannot be reached with slurry seal machine. |
| 1. | Lightly dampen areas prior to mix placement. |
| 2. | Provide complete and uniform coverage. |
| 3. | Avoid unsightly appearance from hand work. |
| 4. | Use the same type of finish in hand worked areas as applied by the spreader box. |
| G. | Correct any joints or cracks that are not filled by the slurry mixture. |
H. Place slurry seal adjacent to concrete pavements or concrete curb and gutter with a straight longitudinal edge. Do not allow over-lap on these areas.
I. Maintain straight lines at all locations.
3.5 JOINTS
A. Do not permit build-up on longitudinal or transverse joints.
B. Smooth thick spots before the emulsion breaks to a uniform surface with no breaks or discontinuities is obtained.
C. Use construction paper or comparable products so all beginning and ending joint lines from each construction pass are straight.
3.6 FIELD QUALITY CONTROL
A. The slurry, when cured, shall present a uniform, skid-resistant appearance where all cracks are filled.
B. Leave no streaks caused by oversized aggregate particles or buildup of slurry mix on squeegees.
C. Leave no holes, bare spots, or cracks through which liquids or foreign matter could penetrate to the underlying pavement.
3.7 PROTECTION AND REPAIR
A. Protect all structures, including curb and gutter, sidewalk, guardrails and guideposts from being spattered or marred. If any spattering, over-coating, or marring occurs, correct at no additional cost to GOVERNMENT.
B. Insure straight lines along lips of gutters and shoulders. No runoff on these areas will be permitted. Lines at intersections will be kept straight to provide good appearance.
C. Repair any damage caused by construction.
END OF SECTION