SECTION_33_11_00_Water_Distribution_and_Transmission.docx

DOCX document 28 KB Posted

Attached to
Dugway Proving Ground, Utah Road Maintenance
Solicitation number
W911S6-17-B-0001
Issued by

About this file

SECTION 33 11 00 WATER DISTRIBUTION AND TRANSMISSION

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 33 11 00

SECTION 33 11 00

WATER DISTRIBUTION AND TRANSMISSION

PART 1GENERAL
1.1SECTION INCLUDES
A.Water distribution and transmission system identification, valves, boxes, service connections and accessories.
B.This section is applicable to potable and non-potable water pressure systems.
1.2REFERENCES
A.Applicable State of Utah requirements.
B.AWWA C600: AWWA Standard for Installation of Ductile-Iron Water Mains and Their Appurtenances.
C.AWWA C605: AWWA Standard for Underground Installation of Polyvinyl Chloride (PVC) Pressure Pipe and Fittings for Water.
D.AWWA C800: AWWA Standard for Underground Service Line Valves and Fittings.
1.3PERFORMANCE REQUIREMENTS
A.Depth of Cover:
1.54 inches minimum to top of pipe, unless connecting to existing piping, or as indicated in local building code. 72 inches maximum unless COR authorizes otherwise.
2.If less cover, provide additional protection to withstand frost and external loads.
B.Remove any section of pipe already placed that is found to be defective or damaged. Replace without additional cost to Government.
1.4SUBMITTALS
A.Product Data: Submit manufacturer's technical product data and installation instructions.
B.Commissioning: Submit testing data indicated in Section 33 08 00.
C.Record Documents: Submit documents, Section 01 78 39. Include details of underground structures, connections, thrust blocks and anchors. Show interface and spatial relationship between piping and adjacent structures.
D.Operating and Maintenance: Submit data, Section 01 78 23. Include maintenance data, parts lists, product data, and shop drawings.
1.5SITE CONDITIONS
A.Minimize traffic interruptions. Barricade stockpiles.
B.Secure acceptance of pipeline lateral tie-in work.
C.Repair damaged by Contractor.
D.Do not turn on or turn off any valve outside of the Work prior to securing COR's permission.
PART 2PRODUCTS
2.1PIPES AND FITTINGS
A.Provide piping materials and factory fabricated piping products of sizes, types, pressure ratings, and capacities indicated. Use only NSF approved products in drinking water systems. All such products shall be appropriately stamped with the NSF logo.
B.Where not indicated, provide proper selection as determined by installer and acceptable to COR to comply with installation requirements.
C.Provide sizes and types of equipment connections for fittings of material that matches pipe material used in the piping system. Where more than one type of material or product Option is indicated, selection is installer's choice.
D.Provide pipe fittings and accessories of same material and weight or class as pipe, with joining method indicated or recommended by manufacturer.
2.2VALVES
A.Section 33 12 16.
2.3VALVE BOX
A.Buried Valves In Traffic Areas: 2 piece, cast iron, screw adjustable sleeve, 5 - 1/4 inch shaft, with a drop lid.
B.Buried Valves in Non-traffic Areas: Slip type of height required for the installation.
C.Markings: On cover of valve box, cast the appropriate utility lettering.
2.4VALVE CHAMBER
A.General: Refer to applicable design criteria requirements explained in Laws and Regulations.
B.Basin: Class 4000 concrete floor and walls.
C.Steps: Plastic, cast into sidewalls greater than 4 feet deep.
D.Top: Flat slab class 4000 concrete.
E.Frame and Cover: Scoriated asphalt coated, heavy duty ductile iron conforming to Section 05 56 00 with flat top design and appropriate utility lettering. Shape and size as indicated.
2.5MORTAR, GROUT, AND CONCRETE
A.Mortar: Cement, Section 04 05 16.
B.Grout: Cement, Section 03 61 00.
C.Concrete:
1.Cast-in-place: Class 4000, Section 03 30 04.
2.Precast: Class 5000, Section 03 40 00.
2.6TAPPING SADDLES
A.Provide bronze alloy, ductile iron, or stainless steel saddles with stainless steel double straps.
B.Provide tapping saddles that have a minimum rated working pressure of 300 psi, neoprene Buna N gaskets, and bronze tapered threads.
2.7ACCESSORIES
A.Bolts, Nuts, Washers: Steel, Section 05 05 23.
B.Anchorages: Provide anchorages for tees, wyes, crosses, plugs, caps, bends, valves, and hydrants. After installation, apply full coat of asphalt or other acceptable corrosion-retarding material to surfaces of ferrous anchorages.
C.Corporation Stops: All bronze with tapered threads.
D.Hydrant and Valve: Dry barrel, Section 33 12 19.
E.Water Meter and Valve: Section 33 12 19.
F.Grease: Non-oxide.
G.Polyethylene Sheet: 8 mil thick.
PART 3EXECUTION
3.1EXAMINATION
A.Verify Trench Excavation is ready to receive work, and dimensions, and elevations are as indicated.
B.Commencing installation means acceptance by Contractor of existing conditions.
3.2PREPARATION
A.Excavation, Section 31 23 16. Hand trim to required elevations. Correct over excavations.
B.Remove stones or other hard matter that could damage pipe embedment or impede backfilling or compaction.
C.Examine areas and conditions under which materials and products are to be installed. Do not proceed with system installation until unsatisfactory conditions have been corrected.
D.Clearly identify and promptly set aside defective or damaged pipe.
E.Use pipe cutting tool acceptable to pipe manufacturer.
3.3LOCATING POTABLE WATER PIPE
A.Comply with Utah Drinking Water Act. As a minimum locate potable water pipe at least 18 inches vertical and 10 feet horizontal edge to edge between water and sewer lines. Place water lines above sewer line.
B.Where potable water pipe crosses under gravity-flow sewer lines, fully encase the sewer pipe in concrete for a distance at least 10 feet each side of the crossing.
1.Do not locate any joint in the water line within 36 inches of the crossing.
2.Encase water line if it is within 24 inches of a sewer force main or inverted syphon.
3.Encase sewer main joints in concrete if joints are horizontally closer than 36 inches to the water line.
C.Do not put potable water lines in the same Trench with sewer lines, storm drains or electric wires.
3.4INSTALLATION - PIPE AND FITTING
A.Polyvinyl Chloride Pipe: AWWA C605.
3.5INSTALLATION – CONCRETE THRUST BLOCKS
A.Do not make hydrostatic tests of Section 33 08 00 until thrust block concrete has cured for at least 5 days.
B.Provide thrust blocks on all plugs, caps, tees, hydrants and vertical or horizontal bends.
C.Provide stainless steel or epoxy coated steel tie rods and clamps or shackles to restrain thrust.
D.Unless otherwise indicated or directed by COR, place the base and bearing sides of thrust blocking directly against undisturbed earth.
E.Sides of thrust blocking not subject to thrust may be placed against forms. Place thrust blocking so the fitting joints will be accessible for repair.
3.6INSTALLATION - VALVES AND VALVE BOXES
A.Valves:
1.Ensure all parts are in working order.
2.Set location of valves outside of sidewalk limits, Driveway Approaches and other pedestrian or vehicular interference.
3.Install plumb with stems pointing up.
4.Grease all exposed bolts and nuts then apply polyethylene sheet and tape wrap.
B.Valve Boxes:
1.Set over valve nut so operator's key is plumb with clearance in valve box when opening and closing the valve.
2.Adjust box to finish grade.
3.Clean all dirt or foreign material out of box.
3.7INSTALLATION – TAPS
A.Comply with all connection requirements of State of Utah.
B.Make all service taps with a tapping machine acceptable to COR. Use teflon tape on all taps unless indicated otherwise.
C.The minimum distance between taps is 24 inches, with a 5 degree stagger. Do not make service taps within 24 inches of the end of pipe. Install taps at 60 degress from vertical, or as authorized by COR.
D.Service saddles are required on all taps except, 3/4 inch or 1" taps to new ductile iron pipe
E.Grease all exposed bolts and nuts then apply polyethylene sheet and tape wrap.
3.8INSTALLATION – WATER MAIN LOOP (SYPHON)
A.Existing water mains may not match standard size. Excavate to obtain actual pipe diameter and match size.
B.Do not shutdown pipeline until couplings and fittings are on site. Coordinate shutdown with COR.
C.Connections to steel or transite pipe requires transition couplings or sleeves with transition gaskets.
D.Grease all exposed bolts and nuts then apply polyethylene sheet and tape wrap
E.Provide thrust blocks except where joints are welded. Follow details shown on the Drawings.
3.9DISINFECTION
A.Section 33 13 00.
B.After disinfection, legally dispose of disinfection water.
3.10BACKFILLING
A.Prior to Backfilling:
1.Secure COR’s acceptance of brass wedge installations and concrete thrust block installations.
2.For pressure pipe testing follow Section 33 08 00 requirements and for disinfection follow Section 33 13 00 requirements.
B.Trenches: Section 33 05 20.

END OF SECTION

WATER DISTRIBUTION AND TRANSMISSION Page 1

File details come from the government source that posted it. Updated .