SECTION 32 12 19.19 OPEN-GRADED SURFACE COURSE (OGSC)

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 12 19.19

SECTION 32 12 19.19

OPEN-GRADED SURFACE COURSE (OGSC)

PART 1 GENERAL

1.1SECTION INCLUDES
A.Materials and procedures for constructing OGSC.
1.2RELATED SECTIONS
A.Section 01452: Pavement Smoothness
B.Section 02745: Asphalt Material
C.Section 02746: Hydrated Lime
D.Section 02748: Prime Coat/Tack Coat
1.3REFERENCES
A.AASHTO T 30: Mechanical Analysis of Extracted Aggregate
B.AASHTO T 89: Determining the Liquid Limit of Soils
C.AASHTO T 90: Determining the Plastic Limit and Plasticity Index of Soils
D.AASHTO T 96: Resistance to Abrasion of Small Size Coarse Aggregate by Use of the Los Angeles Machine
E.AASHTO T 104: Soundness of Aggregate by Use of Sodium Sulfate or Magnesium Sulfate
F.AASHTO T 112: Clay Lumps and Friable Particle in Aggregate
G.AASHTO T 176: Plastic Fines in Graded Aggregates and Soils by Use of the Sand Equivalent Test
H.AASHTO T 278: Surface Frictional Properties Using the British Pendulum Tester
I.AASHTO T 279: Accelerated Polishing of Aggregates Using the British Wheel
J.AASHTO T 304: Uncompacted Void Content of Fine Aggregate
K.AASHTO T 308: Determining the Asphalt Binder Content of Hot-Mix Asphalt (HMA) by the Ignition Method
L.AASHTO TP 61: Determining the Percentage of Fractured Particles in Coarse Aggregate
M.UDOT Quality Management Plans
N.UDOT Materials Manual of Instruction
O.UDOT Minimum Sampling and Testing Requirements

1.4 DEFINITIONS NOT USED

1.5SUBMITTALS
A.Job mix gradation: at least 10 working days before paving.
1.Submit materials and documentation according to UDOT Materials Manual of Instruction, Section 954.
2.Aggregate suitability test results.
B.Changes in job mix gradation:
1.Submit a written request for a change in a job-mix gradation.
2.Allow the COR five working days to review and approve the changes.
C.Verification that Hydrated Lime meets the requirements of Section 32 12 16.
D.Verification Asphalt Binder meets the requirements of Section 32 12 16.
1.6ACCEPTANCE
A.Acceptance sampling and testing of material as specified herein.
B.A lot equals the number of tons placed during each production day.
1.A lot is evaluated on the test results of four samples, with the following exceptions:
a.Compute disincentive using the test results from three samples if only three samples can be taken for the production day.
b.Add the lot to the next day’s production if three random samples cannot be taken.
c.Add the lot to the previous day’s production for the last day’s production if three random samples cannot be taken.
d.The lot may be increased to include up to three production days when agreed upon in advance by both the Contractor and the COR and when less than 900 tons are anticipated per production day.
e.Evaluate with the appropriate number of tests “n” in Table 4:
2.Asphalt Binder: COR will compute disincentive for asphalt binder content based on Table 1 using the single test result with the largest deviation from the target. AASHTO T 308.
a.Apply incentive to the entire lot.
b.Disincentive is applied only to the sublot defined as percentage of the lot represented by the test.
c.Any lot that includes one or more sublots in disincentive is not eligible for incentive.

Table 1: Asphalt Binder Content Pay Factors

Pay Factor
Mean Absolute Deviation from Job Mix Formula
1.00
0.35 or less
0.98
0.36 to 0.50
0.95
0.51 to 0.75
0.90
0.76 to 1.00
Reject
Above 1.00

3. Gradation: COR will compute incentive/disincentive for gradation is based on Percent Within Limits computation using Table 2. AASHTO T 30

Table 2: Aggregate Gradation Pay Factors

Sieve Size
Pay Factor
Mean Absolute Deviation
1/2 inch and larger
1.00
0.0 to 5.6
0.98
5.7 to 6.3
0.95
6.4 to 7.0
0.90
7.7 to 7.7
0.85
7.8 to 8.4
Reject
Over 8.4
3/8 inch
1.00
0.0 to 5.4
0.98
5.5 to 6.4
0.95
6.5 to 6.8
0.90
6.9 to 7.5
0.85
7.6 to 8.4
Reject
Over 8.4
No. 4
1.00
0.0 to 5.2
0.98
5.3 to 5.8
0.95
5.9 to 6.4
0.90
6.5 to 7.0
0.85
7.1 to 7.6
Reject
Over 7.6
No. 8
1.00
0.0 to 4.3
0.98
4.4 to 4.8
0.95
4.9 to 5.3
0.90
5.4 to 5.8
0.85
5.9 to 6.4
Reject
Over 6.4
No. 50
1.00
0.0 to 3.4
0.98
3.5 to 3.8
0.95
3.9 to 4.1
0.90
4.2 to 4.4
0.85
4.5 to 4.9
Reject
Over 4.9
No. 200
1.00
0.0 to 1.8
0.98
1.9 to 2.0
0.95
2.1 to 2.2
0.90
2.3 to 2.4
0.85
2.5 to 2.6
Reject
Over 2.6
4.Any lot rejected based on either gradation or asphalt binder content will not be eligible for any incentive.
C.Thickness
1.Verify the thickness with a depth probe and take corrective action if necessary.
a.Minimum thickness: Plan depth minus ¼ inch.

Table 3: Thickness Pay Factors

Pay Factor
Thickness Variation, in Inches (ASTM D 3549)
0.50 for excess material
Greater than + 0.25
1.00
+ 0.25 to - 0.25
Reject
Greater than – 0.75
D.Smoothness
1.Lot size is 100 linear feet per lane or part thereof. A minimum of two tests per lot shall be taken in both the longitudinal and transverse directions.
2.Longitudinal requirement: 1/8 inch in 10 feet parallel to centerline.
3.Transverse requirement: 1/4 inch in 10 feet perpendicular to centerline except at cross section grade breaks.

Table 4: Smoothness Pay Factors

Pay Factor
Measurement Deviations, in Percent
1.00
5 or less
0.95
6 to 10
0.90
11 to 15
0.75
16 to 19
Reject
Greater than 20
E.Submit an engineering analysis within one week if requesting that a rejected lot or sublot remain in place.
1.Include in the analysis: Data and engineering principles that indicate why the pavement should remain in place.
2.The COR will review the analysis for acceptance, denial, or revision within three working days.
3.Remove the rejected material from the project within 72 hours and replace it with an acceptable material if the request is denied.
4.Agree with COR on removal time period if rotomilling is required.
5.A Pay Factor of 0.50 applies if a rejected lot or sublot is allowed to remain in place.

PART 2 PRODUCTS

2.1ASPHALT MATERIAL
A.Refer to Section 32 12 16.
B.Sampling procedure: UDOT Quality Management Plan - 509 Asphalt Binder.
2.2HYDRATED LIME
A.Meet the requirements of Section 32 12 16.
2.3AGGREGATE MATERIALS
A.Crusher processed virgin aggregate material consisting of crushed stone, gravel, or slag.
B.Meet the following requirements, including Table5, to determine the acceptability of the aggregate.
1.Coarse aggregate:
a.Retained on # 4 sieve.
2.Fine aggregate:
a.Clean, hard grained, and angular.
b.Passing the # 4 sieve.

Table 5: Aggregate Properties

Properties
Test Method
Test Requirement
One Fractured Face
AASHTO TP 61
95 percent min.
Two Fractured Face
AASHTO TP 61
90 percent min.
Fine Aggregate Angularity
AASHTO T 304
45 min.
L.A. Wear
AASHTO T 96
Roads: 30% max.

Airfield: 25% max.

Sand Equivalent
AASHTO T 176
60 min.
Plasticity Index
AASHTO T 89 and T 90
0
Polish Test
AASHTO T 278 & T 279
31 min.
Soundness (sodium sulfate)
AASHTO T 104
12 % max. loss with five cycles
Clay Lumps and Friable Particles
AASHTO T 112
2 % max.
Natural Fines
None
None
2.4JOB-MIX
A.Obtain COR’s approval for job mix gradation:
1.Show definite single values for the percentage of aggregate passing each sieve based on the dry weight of aggregate.
2.Stay within the single value gradation limits of Table 6.
3.Incorporate minimum hydrated lime by dry weight of aggregate into all mixtures. Refer to Section 32 21 16:
a.Method A, Lime Slurry incorporate 1 percent
b.Method B, Lime Slurry Marination incorporate 1½ percent
B.Binder Content
1.Indicate the binder content as a percent in the Job-Mix Formula.

Table 6: Aggregate Gradation

Percent Passing by Dry Weight of Aggregate

Sieve Size
Percent

½ inch ⅜ inch # 4 # 8 # 200 90 - 100 35 - 45 14 - 20 2 - 4

PART 3 EXECUTION

3.1MIX
A.Mix until all particles are coated.
B.Treat aggregate with hydrated lime according to the requirements of 32 12 16.
1.Verify lime slurry equipment is operating at all times when using Method A.
a.Cease production if hydrated lime slurry treatment is interrupted.
b.COR may require marination of the aggregate/hydrated lime mixture in the stockpile, Method B, if production continues without hydrated lime slurry treatment.
3.2SURFACE PLACEMENT
A.Apply the tack coat at a uniform rate. Refer to Section 32 12 10.
1.0.10 gal/yd2 on new pavement.
2.0.15 gal/yd2 on milled surfaces.
B.Maintain a steady paver speed.
C.Roll sufficiently to seat without fracturing aggregate.
D.Bring all passes up even transversely at the end of each working day.
E.Construct longitudinal joints within 6 inches of lane lines.
F.Remove slick spots as directed by the COR.
3.3LIMITATIONS
A.Place between May 1 and September 15.
1.Obtain approval from the Government before placing OGSC after September 15.
B.Place when the air temperature in the shade and the pavement surface temperature are above 60 degrees F and rising.
C.Do not place if surface moisture is present.
D.Do not place during rain or during other adverse weather conditions.
E.Do not allow traffic on airfield OGSC for a minimum of 2 days after placement.

END OF SECTION