SECTION_32_12_43_Porous_Paving.docx

DOCX document 27 KB Posted

Attached to
Dugway Proving Ground, Utah Road Maintenance
Solicitation number
W911S6-17-B-0001
Issued by

About this file

SECTION 32 12 43 POROUS PAVING

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 12 43

SECTION 32 12 43

POROUS PAVING

PART 1GENERAL
1.1SUMMARY
A.Section includes:
1.Porous paving systems.
a.Concrete.
b.Asphalt.
2.Unit paver systems.
1.2REFERENCES
A.AASHTO M288: Standard Specification for Geotextile Specification for Highway Applications
B.ASTM C 33: Standard Specification for Concrete Aggregates
C.ASTM C 67: Standard Test Methods for Sampling and Testing Brick and Structural Clay Tile
D.ASTM C 936: Standard Specification for Solid Concrete Interlocking Paving Units
E.ASTM C1319: Standard Specification for Concrete Grid Paving Units
F.ASTM C1688: Standard Test Method for Density and Void Content of Freshly Mixed Pervious Concrete
G.ASTM C1701: Standard Test Method for Infiltration Rate of In Place Pervious Concrete
H.ASTM D 698: Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort (12 400 ft-lbf/ft (600 kN-m/m))
I.ASTM D 1557: Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft (2,700 kN-m/m))
1.3SUBMITTALS
A.Product data. Unless otherwise indicated, submit the following for each type of product provided under work of this Section:
1.Recycled Content:
a.Indicate recycled content; indicate percentage of pre-consumer and postconsumer recycled content per unit of product.
2.Local/Regional Materials:
a.Sourcing location(s): Indicate location of extraction, harvesting, and recovery; indicate distance between extraction, harvesting, and recovery and the project site.
b.Manufacturing location(s): Indicate location of manufacturing facility; indicate distance between manufacturing facility and the project site.
c.Product Value: Indicate dollar value of product containing local/regional materials; include materials cost only.
d.Product Component(s) Value: Where product components are sourced or manufactured in separate locations, provide location information for each component. Indicate the percentage by weight of each component per unit of product.
3.Albedo data: Provide information identifying the Solar Reflectance Index SRI of the following products provided under work of this Section:
a.Pavement.
B.Concrete Paving: In addition to the above, provide submittals as required for Concrete Paving, Section 32 13 13.
C.Asphalt Paving: In addition to the above, provide submittals as required for Asphalt Paving, Sections 32 12 03 and 32 12 16.
1.4QUALITY ASSURANCE
A.Installer Certification:
1.For porous paving installations, provide Pervious Concrete Contractor Certification from the National Ready Mixed Concrete Association.
B.Field-Constructed Mockup: Install minimum 225 square feet to demonstrate typical joints, surface finish, texture, color, permeability, and standard of workmanship.
1.When COR determines that mockup does not meet requirements, demolish and remove it from the site and install another until the mockup is accepted.
2.Keep accepted mockup undisturbed during construction as a standard for judging completed paving.
3.Accepted mockup may be incorporated into final work when approved by COR.
1.5ACCEPTANCE
A.Concrete: For lot size, testing, and Pay Factors see Section 32 13 13.
B.Asphalt: For lot size, testing, and Pay Factors see Sections 32 12 03 and 32 12 16.
PART 2PRODUCTS
2.1POROUS CONCRETE PAVING
A.Installed system:
1.Albedo: Minimum Solar Reflectance Index (SRI) of 29.
2.Permeability: Minimum permeability rate 60 percent or not less than an infiltration rate of 1.1 inch/hr. for a 20-year design life. Determine the field water infiltration rate of in place pervious concrete in accordance with ASTM C1701.
3.Density and void content: Detremine the density and void content of freshly mixed pervious concrete in accordance with ASTM C1688. Verify that mixture proportions are as designed.
4.Compressive Strength: Minimum Class 3000, Section 03 30 04.
5.Slump: Per accepted mix design.
2.2POROUS ASPHALT PAVING
A.Asphalt Cement:
1.Recycled Content: Minimum 5 percent post-consumer recycled content, or minimum 20 percent pre-consumer recycled content at Contractor’s option.
C.Installed system:
1.Permeability: Minimum permeability rate 60 percent.
2.3UNIT PAVER SYSTEMS
A.Concrete paver systems:
1.Concrete grid paver units: Comply with ASTM C1319.
2.Interlocking concrete paver units: Comply with ASTM C 936.
3.Average compressive strength of 8,000 psi with no individual unit under 7,200 psi.
4.Maximum 1 percent loss in dry mass per unit in minimum 50 freeze-thaw cycles when tested according to ASTM C 67.
B.Plastic paver forms:
1.Recycled Content: Minimum 5 percent post-consumer recycled content, or minimum 20 percent pre-consumer recycled content at contractor’s option.
C.Installed system:
1.Permeability: Minimum permeability rate 60 percent or not less than an infiltration rate of 1.1 inch/hr. for a 20-year design life.
2.5ACCESSORIES
A.Paver Bedding And Joint Sand: As recommended by paver manufacturer and as follows:
1.Clean, non-plastic, free from deleterious or foreign matter, natural or manufactured from crushed rock.
2.Sieve according to ASTM C 33, No. 8 stone; bedding and joint aggregate conforming to gradation in Table 1. Joint material may also conform to No. 89 crushed stone or finer material at contractor’s option.

Table 1: Bedding and Joint Aggregate Gradation

Sieve Size
Percent Passing, by Weight
1/2 in.
100%
3/8 in.
85% to 100%
No. 4
10% to 30%
No. 8
0% to 10%
No. 16
0% to 5%
3.Screenings and stone dust are not permitted.
4.Sand having material passing the No. 200 (0.075 mm) sieve is not permitted.
B.Reservoir stones: ASTM C 33 No. 57 crushed concrete or other recycled materials conforming to gradation in Table 2.

Table 2: Reservoir Stone Gradation

Sieve Size
Percent Passing, by Weight
1-1/2 in.
100%
1 in.
95% to 100%
1/2 in.
25% to 60%
No. 4
0% to 10%
No. 8
0% to 5%
1.Recycled Content: Minimum 5 percent post-consumer recycled content, or minimum 20 percent pre-consumer recycled content at contractor’s option.
C.Geotextile fabric: Comply with AASHTO M288 based on application and installation conditions. Verify compatibility between geotextile and adjacent soils for filtration, clogging and permeability.
D.Edge restraints: Concrete.
PART 3EXECUTION
3.1PREPARATION
A.Verify compacted subgrade, granular base or stabilized soil is acceptable and ready to support paving and imposed loads.
1.Verify subsoils have a permeability between 0.5 and 3.0 inches per hour.
2.Compact to minimum 95 percent Standard Proctor Density per ASTM D 698 for pedestrian areas.
3.Compact to 95 percent Modified Proctor Density per ASTM D 1557 for areas subject to heavy vehicular traffic.
4.Verify that geotextiles, if applicable, have been placed in accordance to specifications and drawings.
B.Reservoir stones: Verify gradients and elevations of base are correct.
1.Install so that the bottom of the stone reservoir is flat and graded such that infiltrated runoff will be able to infiltrate through the entire surface.
C.Install edge restraints per the drawings and manufacturer's recommendations.
3.2INSTALLATION
A.Install pervious paving system(s) in accordance with manufacturer’s recommendations and as indicated.
B.Final Surface:
1.Tolerances: Maximum variation 3/8 inch under a 10 ft long straight edge.
2.Install surface elevation of the paving system 1/8 to 1/4 inch above adjacent drainage inlets, concrete collars or channels.

END OF SECTION