SECTION_03_39_00_Concrete_Curing.docx

DOCX document 23 KB Posted

Attached to
Dugway Proving Ground, Utah Road Maintenance
Solicitation number
W911S6-17-B-0001
Issued by

About this file

SECTION 03 39 00 CONCRETE CURING

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
SECTION_01_66_00_Product_Storage_and_Protection.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 03 39 00

SECTION 03 39 00

CONCRETE CURING

PART 1GENERAL
1.1SECTION INCLUDES
A.Concrete curing requirements.
1.2REFERENCES
A.ACI 301: Specifications for Structural Concrete for Buildings
B.ACI 305: Hot Weather Concreting.
C.ACI306: Cold Weather Concreting
D.ASTM C 171: Standard Specification for Sheet Materials for Curing Concrete.
E.ASTM C 1315: Standard Specification for Liquid Membrane-Forming Compounds Having Special Properties for Curing and Sealing Concrete.
1.3SUBMITTALS
A.Curing agent data sheet.
B.Curing plan. Describe estimated cure quantity and procedure.
C.Manufacturer certificates, Section 01 33 00 that shows product meets performance criteria.
D.Manufacturer's recommended installation procedures which, when accepted by COR, will become the basis for accepting or rejecting installed product.
1.4QUALITY ASSURANCE
A.Use workers knowledgeable of ACI 301, 305, 306.
1.5PRODUCT HANDLING
A.Protect materials of this section before, during, and after installation.
B.Protect the work and materials of other trades.
C.In the event of damage, immediately make replacements and repair at no additional cost to OWNER.
1.6WEATHER LIMITATIONS
A.Above 75 deg. F., ACI 305
B.Below 55 deg. F., ACI 306.
PART 2PRODUCTS
2.1COVERS
A.Water or Fog-spay: Clean, non-staining and non-detrimental to concrete.
B.Sheet Coverings: White waterproof paper, polyethylene film, or polyethylene coated burlap sheet complying with ASTM C 171.
C.Mat Coverings: Clean roll goods of cotton or burlap fabric.
D.Insulating Coverings: Non-staining curing blankets.
2.2MEMBRANE FORMING COMPOUND
A.Material.
1.Styrene-acrylic.
2.Styrene-butadiene.
3.Alpha- methylstyrene.
B.Performance Criteria: ASTM C 1315 compound.
1.Type ID Class A (clear with fugitive dye), or
2.Type II Class A or B (white pigmented).
C.Volatile Organic Compounds (VOC): Comply with local, state and federal requirements.
PART 3EXECUTION
3.1PREPARATION
A.Do not use membrane forming curing compound on surfaces that are to receive hardeners.
B.Commence curing operation within 20 minutes after finishing.
3.2APPLICATION – COVERS
A.Water: Apply water-fog spray or ponding.
B.Absorptive Mat: Place absorptive mat to provide coverage of concrete surfaces and edges. Lap over adjacent absorptive covers. Thoroughly saturate with water and keep continuously wet.
C.Moisture-Retaining Sheet: Place cover in widest practicable width with sides and ends lapped and sealed to prevent moisture loss. Repair any holes or tears during curing period.
D.Formed Surface Curing: Cure formed concrete surfaces, including underside of beams, supported slabs and other similar surfaces by moist curing with forms in place for full curing period. If forms are removed prior to curing completion, applying cure film or penetrant or use methods indicated above, as applicable.
3.3APPLICATION – MEMBRANE FORMING COMPOUND
A.Apply coating continuously and uniformly. Follow manufacturer’s recommendations
B.Protect continuity of film coatings and repair damage during cure period.
C.If forms are removed before expiration of cure period, apply coating to unprotected areas.
3.4CONCRETE CURE TEMPERATURE
A.During cure period, eliminate thermal shock of concrete by keeping cure temperature even throughout extent and depth of concrete.

END OF SECTION

CONCRETE CURING Page 1