SECTION 33 12 16 WATER VALVES

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 33 12 16

SECTION 33 12 16

WATER VALVES

PART 1GENERAL
1.1SECTION INCLUDES
A.Gate valves and their installation.
B.Related work includes but is not limited to,
1.Excavation, Section 31 23 16.
2.Trench backfill, Section 33 05 20.
3.Landscape restoration, Section 32 92 00 or Section 32 93 13.
1.2REFERENCES
A.AWWA C111: American National Standard for Rubber-Gasket Joints for Ductile-Iron and Gray-Iron Pressure Pipe and Fittings.
B.AWWA C504: AWWA Standard for Rubber-Seated Butterfly Valves.
C.AWWA C508: AWWA Standard for Swing-Check Valves for Waterworks Service, 2 In. Through 24 In. NPS.
D.AWWA C509: AWWA Standard for Resilient-Seated Gate Valves for Water and Sewerage Systems.
E.AWWA C550: AWWA Standard for Protective Interior Coatings for Valves and Hydrants.
F.AWWA C600: AWWA Standard for Installation of Ductile-Iron Water Mains and Their Appurtenances.
1.3SUBMITTALS
A.Provide technical information as required for evaluating the quality of the valve. As a minimum include dimensions, weights, materials lists and operation charts.
PART 2PRODUCTS
2.1VALVES - GENERAL
A.Underground:
1.Less than 3 inches: Screwed ends.
2.3 inches and larger: Flanged or mechanical joint ends as specified. Non-rising stem. Two inches square operating nut. Low alloy steel bolts, AWWA C111.
B.Clearance: Install so that handles clear all obstruction when moved from open to closed.
C.Rated Working Pressure: 150 psi unless indicated.
D.Coating: Interior, AWWA C550. Exterior per manufacturer’s recommendation.
2.2GATE VALVES
A.Material: Cast iron body, bronze mounted. Furnish valves 3 inches through 48 inches that conform to the requirements of AWWA C509, non-rising stem design with "O" ring seals.
B.Operating Direction: Open counterclockwise.
C.Buried Valves: Flanged, mechanical joint, or as indicated.
PART 3EXECUTION
3.1INSTALLATION
A.Flush all lines before valve installation.
B.In ductile iron water mains install valves, AWWA C600.

END OF SECTION