SECTION 32 16 00 DRIVEWAY, SIDEWALK, CURB, GUTTER

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 16 00

SECTION 32 16 00

DRIVEWAY, SIDEWALK, CURB, GUTTER

PART 1GENERAL
1.1SECTION INCLUDES
A.Concrete flatwork such as but not limited to waterways, waterway transition structures, sidewalks, curbs, gutters, Driveway Approaches.
1.2REFERENCES
A.American Public Works Association (Utah Chapter).
1.Plan 205: Curb and Gutter.
2.Plan 209: Curbs.
3.Plan 211: Waterway.
4.Plan 213: Waterway Transition Structure.
5.Plan 222: Saw-Cut Driveway Approach
6.Plan 231: Concrete Sidewalk.
B.ASTM A 36: Standard Specifications for Structural Steel.
C.ASTM C 39. Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.
D.ASTM C 172: Standard Method of Sampling Freshly Mixed Concrete.
1.3DEFINITIONS
A.Driveway: A paved or unpaved vehicular thoroughfare outside of, but connected to a public road right-of-way or highway right-of-way.
B.Driveway Approach: (1) A vehicular thoroughfare connecting a public road or highway to a driveway. (2) A concrete structure composed of sidewalk, apron and any curb and gutter abutting the apron. When an apron is built as a bridge over curb and gutter, the bridge is included in this definition.
1.4SUBMITTALS
A.Traffic control plan, Section 01 55 26.
B.Concrete mix design, Section 03 30 04.
C.Batch ticket, Section 03 30 10.
D.Quality Control Inspections and Testing Report: Upon COR’s request, submit a report describing source and field quality control activities and test results performed by Contractor and Contractor’s Suppliers.
1.5NOTICE
A.Coordinate with COR to provide notice to residents and/or building occupants within affected area at least 3 days before work starts.
B.Indicate when concrete work will take place and when driveway approach can be used.
C.Warn of potential vehicle tow away and other construction issues affecting neighborhood.
D.Should work not occur on specified day, provide a new notice.
1.6ACCEPTANCE
A.General:
1.Acceptance is by Lot. One Lot is one day’s production.
B.Concrete Mix:
1.Testing Frequency: Section 03 30 05. Sample per ASTM C 172.
2.Temperature, Slump, Air: Lot size is 1 random batch. Reject noncomplying batches until 2 consecutive batches are compliant then proceed in random batch testing for acceptance.
3.Strength: ASTM C 39. Lot size is 50 cubic yards. At COR’s discretion, a Lot with sub-lot test deviations greater than Reject may stay in place at 50 percent cost.

Table 1: Compressive Strength Pay Factors

Pay Factor
PSI Below 28-Day Compressive Strength
0.98
1 to 100
0.94
101 to 200
0.88
201 to 300
0.80
301 to 400
Reject
Greater than 400
C.Placement, finishing and protection, Section 03 30 10
1.Verify line, grade, cross slope and finish.
2.No standing water in curb and gutter.
PART 2PRODUCTS
2.1MATERIALS
A.Concrete Mix.:
1.Cast-in-place: Class 4000, Section 03 30 04.
2.Maximum slump per mix design.
B.Reinforcement: Grade 60 ksi galvanized or epoxy coated steel per Section 03 20 00.
C.Expansion Joint Filler: F1 sheet 1/2 inch thick per Section 32 13 73.
D.Contraction Joint Filler (Backer Rod): Closed cell, Type 1 round Section 32 13 73.
E.Contraction Joint Sealer: HAS1 or HAS4 hot applied per Section 32 13 73.
F.Curing Compound: Membrane forming compound per Section 03 39 00.
G.Plate Steel: ASTM A 36 galvanized per Section 05 05 10.
PART 3EXECUTION
3.1CONSTRUCTION EQUIPMENT
A.Slip Form Machines.
1.Placement must produce required cross-section, lines, grades, finish, and jointing as specified for formed concrete.
2.If results are not acceptable, remove and replace work with formed concrete.
3.2PREPARATION
A.Control pedestrian and vehicular traffic, Section 01 55 26.
B.Examine surfaces scheduled to receive concrete formwork for defects.
C.Do not start work until defects are corrected.
D.Check slopes on each side of the work to ensure drainage. Failure to check and verify will result in Contractor repairing any drainage deficiencies at no additional cost to Government.
3.3LAYOUT
A.Curb, Gutter, Curb and Gutter: Plan 205, 209, 211, 213.
1.Line: Less than 1/2 inch variance in 10 feet and not more than 1 inch from true line at any location.
2.Grade: Not more than 1/4 inch variance in 10 feet. Flood curb and gutter with water after final cure has been reached. Remove and replace any area where ponding is found.
B.Sidewalk: Plan 231.
1.Cross slope 2 percent.
2.Landing slope 2 percent maximum in any direction.
3.Ramp slope, per ADA and UFAS requirements.
C.Driveway Approaches: Plan 215, 216, 221, 225, 229.
3.4CONCRETE PLACEMENT
A.Section 03 30 10.
B.Make sure base course is uniformly damp at time of concrete placement.
C.Obtain ENGINEER's review of base course and forms before placing concrete.
D.Do not use methods that segregate the mix.
E.Place concrete so time between end of placement and beginning of finishing is less than 15 minutes.
F.Consolidate concrete with vibrator or other acceptable method. Do not use mechanical vibrators. Prevent dislocation of inserts.
3.5CONTRACTION JOINTS
A.Geometrics:
1.Tooled Joints (Score Lines):
a.Depth = T/4. T is the depth of the concrete slab in inches.
b.Top radius = 1/2 inch.
2.Saw Cut Joints: Saw joints before uncontrolled shrinkage cracking occurs. Do not tear or ravel concrete during sawing.
3.Template Joints: 1/8 to 3/16 inch wide 1/4-depth of slab.
B.Sidewalks.
1.At intervals equal to the width of the sidewalk and transverse to the line of walk.
2.Radial at curbs and walk returns.
3.Place longitudinal joints in walks when width of walk in feet is greater than 2 times the walk thickness in inches. (e.g. maximum width of a 4 inch thick walk before placement of a longitudinal contraction joint is 8 feet). Make longitudinal joints parallel to, or concentric with, the lines of the walk.
4.In walk returns make 1 joint radially midway between the beginning of curb returns (BCR) and end of curb returns (ECR). Match longitudinal and traverse joints with the adjacent walks.
C.Curb, Gutter, Waterway.
1.Place joints at intervals not exceeding 12 feet.
2.At curb radius and walk returns make the joints radial.
3.Where integral curb and gutter is adjacent to concrete Pavement, align the joints with the Pavement joints where practical.
D.Additional Contraction Joint Requirements: Section 32 13 73.
3.6EXPANSION JOINTS
A.Geometrics: 1/2 inch wide full depth filler that is flush with concrete surface. Do not place seal over top of filler.
B.Sidewalks, Sidewalk Ramps.
1.Place expansion joints to separate sidewalk from utility poles, hydrants, Manhole frames, buildings and abutting sidewalks.
2.Place expansion joints between the sidewalk and the back of curb returns and between the sidewalk and sidewalk ramps.
3.Do not place expansion joints in sidewalk ramp surfaces.
4.Expansion joints are not required when using slip form method to place concrete except where sidewalk changes direction or where it joins foundation walls or structures.
C.Curb, Gutter, Waterway.
1.Do not place longitudinal joints in drain gutter flow-lines.
2.Where drain gutter transitions extend beyond the curb return, place expansion joints at the ends of the drain gutter transition.
3.Place expansion joints at beginning of curb radius (BCR) and end of curb radius (ECR).
D.Slip Form Work: Expansion joints are not required except at BCR or ECR.
E.Driveway Approach: Do not place expansion joints in curb returns.
F.Street Intersection Corner: Place expansion joints at BCR and ECR.
G.Additional Expansion Joint Requirements: Section 32 13 73.
3.7FINISH
A.Section 03 35 00.
B.Round edges exposed to public view to a 1/2 inch radius.
C.Apply broom finish longitudinal to curb and gutter flowline.
D.Apply broom finish transverse to sidewalk centerline as follows.
1.Fine hair finish where grades are less than 6 percent.
2.Rough hair finish where grades exceed 6 percent.
E.Remove form marks or irregularities from finish surfaces.
3.8CURING
A.Section 03 39 00.
B.Type ID Class A (clear with fugitive dye) membrane forming compound. Apply total coverage in 2 directions after texturing.
C.Eliminate thermal shock of concrete by keeping cure temperature even throughout extent and depth of concrete slab.
3.9PROTECTION AND REPAIRS
A.General: All expenses are at no cost to Government.
B.Protection: Section 03 30 10.
1.Protect concrete work from deicing chemicals during the 28 day cure period.
2.Immediately after placement, protect concrete from graffiti or other types of mechanical injury.
C.Repair: Section 03 30 10.
1.Correct all humps or depressions.
2.Secure COR’s acceptance of method of correction.

END OF SECTION