SECTION 32 13 13 CONCRETE PAVING

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 13 13

SECTION 32 13 13

CONCRETE PAVING

PART 1GENERAL
1.1SECTION INCLUDES
A.Concrete base course and concrete surface course.
B.Concrete product is not specified in this Section. Refer to Section 03 30 04.
1.2REFERENCES
A.ACI 305: Hot Weather Concreting.
B.ACI 306: Cold Weather Concreting.
C.APWA Plan No. 261: Manual of Standard Plans for Concrete Pavement Joints.
D.ASTM A 307: Standard Specification for Carbon Steel Bolts and Studs, 60,000 psi Tensile Strength.
E.ASTM C 39: Standard Test Method for Compressive Strength of Cylindrical Concrete Specimens.
F.ASTM C 78: Standard Test Method for Flexural Strength of Concrete (Using Simple Beam with Third-Point Loading).
G.ASTM C 150: Standard Specification for Portland Cement.
H.ASTM C 172: Standard Method of Sampling Freshly Mixed Concrete.
I.ASTM D 3549: Standard Tet Method for Thickness or Height of Compacted Bituminous Paving Mixture Specimens.
J.ASTM D 5249: Standard Specification for Backer Material for Use with Cold- and Hot-Applied Joint Sealants in Portland-Cement and Asphalt Joints.
L.ASTM E 950: Standard Test Method for Measuring the Longitudinal Profile of Traveled Surfaces with an Accelerometer Established Inertial Profiling Reference.
M.ASTM E 1274: Standard Test Method for Measuring Pavement Roughness Using a Profilograph.
1.3SUBMITTALS
A.Before delivery.
1.Traffic control plan, Section 01 55 26.
2.Joint layout plan, if not provided as part of the Delivery Order.
3.Curing plan. Describe method to prevent excessive concrete temperatures and water evaporation that could impair strength or serviceability of the concrete. Refer to ACI 305.
4.Proof of finisher’s ACI certification.
5.Make and model name of paving machine.
6.Concrete mix design and number, Section 03 30 04.
7.Proof of profilograph calibration and profilograph operator certification.
8.Manufacturer's recommended installation procedures for joint sealing material which, when accepted by COR, will become the basis for accepting or rejecting actual installation procedures used in the Work.
B.At Delivery: Batch ticket, Section 03 30 10.
C.After delivery.
1.Profile deviation report.
2.Ride index report.
3.Upon COR’s request, submit a written quality control inspections and testing report describing source and field quality control activities and test results performed by Contractor and contractor’s Supplier.
1.4QUALITY ASSURANCE
A.Do not change concrete Supplier until COR accepts new source and new mix design.
B.Reject product that does not meet requirements of Section 03 30 04.
C.Remove product found defective after installation and install acceptable product at no additional cost to Government.
D.Foreman of paving crew has completed at least three (3) projects of similar size and nature.
1.5WEATHER
A.Hot weather, ACI 305.
B.Cold weather, ACI 306.
1.6NOTICE
A.Send written notice to residents and businesses within affected area at least 3 days before start of paving.
B.Indicate paving time and when new surface can be used.
C.Warn of potential vehicle tow away and other construction issues affecting neighborhood.
D.Should work not occur on specified day, send a new notice.
1.7ACCEPTANCE
A.General:
1.Acceptance is by Lot. Lot size is specified below.
2.Opening a paved surface to traffic does not constitute acceptance.
B.Concrete Mix:
1.Testing Frequency: Section 03 30 05. Sample per ASTM C 172.
2.Temperature, Slump, Air: Lot size is 1 random batch. Reject noncomplying batches until 2 consecutive batches are compliant then continue in random batch testing for acceptance.
3.Strength: Lot is acceptable if strength test deviations are within pay factor 1.00 limits. At COR’s discretion, a Lot with a sub-lot test deviation greater than Reject may stay in place at 50 percent cost.
a.Compression: ASTM C 39. Lot size is 500 square yards.

Table 1: Compressive Strength Pay Factors

Pay Factor
PSI Below 28 day Compressive Strength
1.00
0
0.98
1 to 100
0.94
101 to 200
0.88
201 to 300
0.80
301 to 400
Reject
Greater than 400

b. Flexural: ASTM C 78. Lot size is 750 square yard.

Table 2: Flexural Strength Pay Factors

Pay Factor
PSI Below 28 day Flexure Strength
1.00
0
0.95
1 to 29
0.85
30 to 60
Reject
Greater than 60
C.Installation:
1.Placement, finishing and protection, Section 03 30 10.
a.Verify grade, cross slope, finish and dimensions.
b.No standing water in curb and gutter.
2.Thickness. Lot size is 1,000 square yards.
a.Thickness will be determined on ASTM D 3549 cored or sawed specimens. Acceptance will be based on the average of all Lot thickness tests.

Table 3: Thickness Pay Factors

Pay Factor
Tolerance (inches less than specified thickness)
1.00
0.00 to 0.25
0.90
0.26 to 0.50
0.70
0.51 to 0.75
0.50
0.76 to 1.00
b.When any thickness measurement is less than specified by more than 1 inch, the actual thickness of the Pavement will be determined by taking additional cores at intervals less than 10 feet parallel to the centerline in each direction from the affected location, until in each direction a core is found which is not deficient by more than 1 inch. Exploratory cores for deficient thickness will not be used in averages for price adjustments.
c.At COR’s discretion payment may be made for areas deficient in thickness by more than 1 inch at 50 percent. If not, remove and replace.
d.Price adjustments and Pavement removal will be applied only to those areas showing the deficient thickness which is defined by an additional set of cores taken at the 100 percent pay point as determined in a straight line basis between the original cores. If the second set of cores is deficient, the area will be defined on a straight-line basis using all scores for the different pay factors.
3.Roughness: “Must grind” bumps are removed and tolerance for profile roughness index is not exceeded.
PART 2PRODUCTS
2.1CONCRETE
A.Compression Design:
1.Cast-in-place: Class 4000, Section 03 30 04.
2.Slump per accepted mix design.
B.Flexure Design.
1.Tensile Strength: 650 psi per ASTM C 78.
2.Cement Content: 6.5 bags.
3.Water Cement Ratio: 0.44 maximum by weight (prior to pozzolan exchange), ACI 318.
4.Entrained Air: 5 to 7 percent, ASTM C 231 (pressure).
5.Slump per accepted mix design
2.2MISCELLANEOUS MATERIALS
A.Reinforcement: Grade 60 ksi galvanized or epoxy coated steel, Section 03 20 00.
B.Hook Bolts: Steel, ASTM A 307 Grade A nuts and bolts, internally and externally threaded.
C.Expansion Joint Filler: F1 sheet, Section 32 13 73.
D.Contraction Joint Filler (Backer Rod): Type 1 round, closed cell, ASTM D 5249.
E.Contraction Joint Sealant: HAS1, HAS4, or CAS6, Section 32 13 73.
F.Curing Compound: Liquid membrane, Section 03 39 00.
G.Bond Breaker: Wax based compound.
H.Grout: Epoxy adhesive, Section 03 61 00.
I.Evaporative Reducer: Water-based mono-molecular polymer liquid at application rates recommended by the manufacturer. Not to be used as a finishing aid.
PART 3EXECUTION
3.1PREPARATION
A.General:
1.Coordinate utility location, Section 01 31 13.
2.Lower Street Fixtures if paving machine is not capable of passing over fixtures.
3.Coat surface of Street Fixtures with oil to prevent bond with concrete Pavement.
4.Remove sand, leaves and other objectionable materials prior to placing the paving course.
5.Notify COR minimum 24 hours prior to commencement of concreting operations.
B.Trees, Plants, Ground Cover:
1.Protect trees, plants and other ground cover from damage.
2.Repair tree damage at no additional cost to the Government.
C.Traffic Control:
1.Provide worker and public safety, Section 01 55 26.
2.Apply temporary traffic and lane marking tape or paint after placement layout has been verified by COR.
D.Base Course:
1.Verify base course is placed to grade, compacted and dampened.
2.If indicated, apply prime coat, Section 32 12 13.
E.Cement Treated or Lean Concrete Base: Remove loose material from surface of cement treated or lean concrete base course immediately before placing concrete surface course. Moisten the surface but do not place concrete over puddled water. Apply a double coat of bond breaker prior to placing surface concrete.
3.2FORM CONSTRUCTION
A.Section 03 11 00.
B.Check formwork for grade and alignment variance from the following tolerances:
1.Top of forms not more than 1/4 inch from true grade.
2.Vertical face on longitudinal axis not more than 1/4 inch from true line.
C.Place joint filler vertical in position, in straight lines. Secure to formwork during concrete placement.
3.3REINFORCEMENT PLACEMENT
A.Section 03 20 00.
B.Interrupt reinforcement at expansion joints.
C.Use load transfer bars on longitudinal construction and transverse construction joints.
D.Use smooth dowel in expansion joints.
E.Keep load transfer bars and dowels in vertical center of concrete and perpendicular to the joint during concrete placement.
F.Position mats on bar chair supports and properly tie before any concrete is poured. Keep mats clean, free from rust, flat, and free of distortions. Straighten bends, kinks, and other irregularities or replace units before concrete placement. Provide a minimum of 2 inch overlap to adjacent mats.
3.4JOINTS
A.General:
1.Review joint layout with COR.
2.Follow Section 32 13 73 requirements.
3.Follow joint requirements in APWA Plan No. 261.
B.Construction Joint: Construction joints (contact joints) (cold joints) are those made by placing concrete against cured concrete.
1.The contact joint between separately laid lanes cannot deviate from a true line by more than 1/4 inch in any direction at any point.
2.Tie both sides of longitudinal and transverse construction joints together with tie bars or key-way. Before placing concrete in adjoining slab, straighten tie bars to 0.1 feet of straight position.
3.Do not cause edge slump when placing tie-bars or by over-working edge of slab.
C.Contraction Joints: Contraction joints (crack control joints) are scorelines made to force crack joint locations in concrete. Keep a minimum of 3 working power saws on the Project when concrete operations are underway. Saw all joints before uncontrolled shrinkage cracking takes place. Do not tear or ravel concrete during sawing.
1.Joint spacing measured in feet = twice the slab thickness measured in inches or a maximum of 15 feet.
2.Joint Depth = T/3.
3.Use of a mechanical control joint-void former in lieu of saw cutting or tooling is acceptable.
4.Longitudinal Joints: Make longitudinal joints the same dimension as transverse joints.
5.Make transverse joints across width of the Pavement full length and meet curb and gutter joints.
6.Leave forms in place until paving operations are resumed on the other side of the joint.
D.Volunteer Crack Joint:
1.If a volunteer crack joint falls within 5 feet of the location of proposed contraction joint, omit the contraction joint.
2.Rout volunteer crack joints to a 1-1/4 inch depth by 3/8 inch width. Clean and fill crack joint with backer rod and joint sealant.
3.When crack joints occur within 2 feet of expansion or construction joints, replace panel. Use saw cuts and tie-bars or dowels in cut planes.
E.Expansion Joints:
1.If a deformed rebar is used in an expansion joint, provide sleeve for movement.
2.Secure fillers to prevent movement. When butted together, do not leave voids or gaps between filler units.
3.Set joint fillers full depth if no joint sealant is specified.
4.Recess joint fillers if backer rods and joint sealant are specified or provide a plastic cap.
F.Joint Sealing: Section 32 13 73.
G.If Contractor chooses to open the roadway to construction or public traffic prior to final sawing and sealing, install backer rod in the initial (green) cut to prevent entrance of incompressibles.
3.5CONCRETE PLACEMENT
A.Section 03 30 10.
B.At the beginning of concrete placement, test slump and air. If corrections are necessary, placement may proceed after 2 subsequent and consecutive batches pass testing.
C.Any delay in excess of 15 minutes from placing to start of finishing operations is cause for stopping placement work.
D.Do not place concrete until concrete sub base and surface course forms have been checked for line and grade. Moisten sub base if required to provide a uniform dampened condition at time of concrete placement. Do not place concrete around Manholes or other structures until they are at required finish elevation and cross-slope.
E.Prevent segregation of mix. Consolidate concrete along face of forms and adjacent to transverse joints with internal vibrator. Keep vibrator away from joint assemblies, reinforcement, or side forms. Use only square-faced shovels for hand-spreading and consolidation. Consolidate with care to prevent dislocation of reinforcing, dowels, and joint devices.
F.Do not place concrete in a longitudinal section until test specimens from the adjacent lane have attained an ASTM C 78 flexural strength (modulus of rupture) of 450 psi.
G.Deposit and spread concrete in a continuous operation between transverse joints. If interrupted for more than 1/2 hour, place a construction joint.
H.Place the concrete to the full width of the Pavement in a single construction operation unless indicated otherwise.
3.6FINISHING
A.Section 03 35 00.
B.Any delay in excess of 30 minutes for completing the finishing operation is cause for stopping concrete placing to correct the difficulties.
C.After striking-off and consolidating concrete, smooth surface by screeding and floating. Use hand methods only where mechanical floating is not possible. Adjust floating to compact surface and produce uniform texture.
D.After floating, test slab for trueness with a straight edge. Distribute concrete as required to remove surface irregularities. Refloat repaired areas to provide a continuous smooth finish.
E.Round edges of slabs, gutters, back top edge of curb, and formed joints with an edging tool. Eliminate tool marks.
F.Surface Texture: After floating when excess moisture or surface sheen has disappeared.
1.For speed less than 45 mph: 1/16 inch deep burlap drag, turf drag, or broom.
2.For speed greater than 45 mph: 1/8 inch deep groove placed 80 degrees to center line and randomly spaced between 3/8 and 1-1/2 inches.
G.Do not remove forms for at least 24 hours after concrete has been placed. After form removal, clean ends of joints and patch any minor honeycombed areas. Remove and replace areas or sections with major defects.
3.7CURING
A.Section 03 39 00.
B.Type II Class A or B (white pigmented) membrane forming compound applied in two directions for total white coverage on all exposed surfaces after texturing.
C.Eliminate thermal shock of concrete by keeping cure temperature close to ground and air temperature.
3.8TOLERANCES
A.Grade: 1/8 inch in 10 feet parallel to centerline.
B.Cross Slope: 1/4 inch in 10 feet perpendicular to centerline except at cross section grade breaks.
C.Thickness: Not less than 1/4 inch deficient.
D.Roughness:

Table 4: Roughness Tolerance

Speed and Traffic Class
Profile Roughness Index, (PRI) Inches / Mile
Profile Deviation Inches/25 feet Maximum
IRI
PI
Min
Max
Min
Max
0 to 29 mph
I or II
– –
– –
– –
– –
0.4
III or IV
129
177
46
66
0.4
30 to 44 mph
I or II
90
115
35
50
0.4
III or IV
70
90
21
35
0.4
45 mph +
All Classes
–
70
–
21
0.3

NOTES

(a) Use a zero blanking band.

(b) As a minimum, trace right wheel path in direction of travel.

(c) Traffic class defined in Table 3, Article 32 12 05.

(d) IRI (International Roughness Index), ASTM E 950.

(e) PI (Profile Index), ASTM E 1274 .

1. Profile Deviation: Begin traces 50 feet before edge of new pavement and end traces 50 feet after edge of new pavement. Areas exceeding profile deviation tolerance are “must grind” areas.

2.Profile Roughness Index: (PRI)
a.Lot is 0.1 lane mile (528 feet long one lane wide). Add segments shorter than 250 feet to preceding Lot. Treat partial segments longer than 250 feet as a Lot.
b.Exclude from the Lot are turn lanes, parking lanes, medians, Street Fixtures, crowns of intersecting streets, bridge decks, grades greater than 8 percent, and vertical curves less than 1,000 feet radius (including super-elevation transitions).
3.9OPENING TO TRAFFIC
A.Not less than 3,000 psi compressive or 400 psi flexure strength.
3.10PROTECTION AND REPAIR
A.General: All expenses are at no cost to Government.
B.Protection: Section 03 30 10 and as follows.
1.Do not allow steel wheel rollers or steel wheel vehicles on the concrete Pavement. Keep traffic and construction equipment off at least 10 days after concrete placement or until 100 percent of the design strength has been achieved and verified by either
a.Maturity meter.
b.Concrete cylinders.
2.If construction traffic is permitted, keep Pavement clean. Remove surface stains and spillage of materials as they occur.
3.Remove saw-cut dust immediately. Protect storm drains
C.Repair: Section 03 30 10.
1.Corrective Action for “Must Grinds”: Grinding per Section 02 41 14 is acceptable after concrete cure.
2.Corrective Action for Profile Roughness Index: Grinding is acceptable. Re-profile corrected segments to verify ride index meets tolerance.
3.Corrective Action for Cracks: Consider repair options published in Guidelines by the American Concrete Pavement Association (ACPA). Do not begin corrective work until COR agrees with repair option. Drill test cores when necessary to determine magnitude. Fill holes with Portland cement concrete bonded to Pavement with epoxy adhesive.

END OF SECTION