SECTION 32 01 17 PAVEMENT CRACK SEAL

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 32 01 17

SECTION 32 01 17

PAVEMENT CRACK SEAL

PART 1GENERAL
1.1SECTION INCLUDES
A.Filling and sealing cracks in asphalt concrete Pavements.
1.2REFERENCES
A.ASTM D 36: Standard Test Method for Softening Point of Bitumen (Ring-and Ball Apparatus)
B.ASTM D 977: Standard Specification for Emulsified Asphalt.
C.ASTM D 1190: Standard Specification for Concrete Joint Sealer, Hot-Poured Elastic Type.
D.ASTM D 2397: Standard Specification for Cationic Emulsifed Asphalt.
E.ASTM D 3381: Standard Specification for Viscosity-Graded Asphalt Cement for Use in Pavement Construction.
F.ASTM D 3405: Standard Specification for Joint Sealants, Hot-Poured, For Concrete and Asphalt Pavements.
G.ASTM D 5078: Standard Specification for Crack Filler for Asphalt Concrete and Portland Cement Concrete Pavements.
H.ASTM D 5329: Standard Test Methods for Sealants and Fillers, Hot-Applied for Joints and Cracks in Asphaltic and Portland Cement Concrete Pavements.
1.3DEFINITIONS
A.Crack Filling: The placement of materials into cracks to substantially reduce infiltration of water and to reinforce the adjacent Pavement. The crack receives no special preparation other than cleaning.
B.Crack Sealing: The placement of specialized materials in cracks or above to prevent the intrusion of incompressibles and water into the crack. The crack receives unique crack configuration prepartion.
C.Pothole: Loss of surface material in a Pavement to the extent that a patch is necessary to restore Pavement ride quality.
1.4SUBMITTALS
A.Product Data sheets.
1.5QUALITY ASSURANCE
A.Do not use crack repair product that has been over-heated, suffered prolonged heating or which ravels or can be pulled out by hand after placement.
B.Do not mix different manufacturer’s brands or different types of crack repair material.
C.Do not depress crack repair product temperature at the wand tip below the manufacturer’s recommended application temperature when loading product into product tank.
D.Rework Defective Work.
1.6NOTICE
A.Send written notice to COR at least 3 days before application of new Crack Filling or Crack Sealing material.
B.Indicate application time and when pavement surface can be used.
C.Should work not occur on the specified day, send a new notice.
1.7ACCEPTANCE
A.Visually inspect areas for adhesion Failure, damage to crack repair product, missed cracks, foreign objects in the product, or other problems that indicate the Work is not acceptable.
PART 2PRODUCTS
2.1FILLER AND SEALER MATERIAL
A.Crack treatment materials as follows.

Table 1 – Thermoplastic Filler and Sealer Materials

Material Type
ASTM
Application

Hot-applied Thermoplastic Materials

Asphalt Rubber
D 5078
Sealing

(possibly filling)

Rubberized Asphalt
D 1190

D 3405 Sealing

Low Modulus Rubberized Asphalt
(a)
Sealing
Asphalt Cement
D 3381
Filling
Mineral-filled Asphalt Cement
D 3381 (b)
Filling
Fiberized Asphalt Cement
D 3381 (b)
Filling

Chemically Cured Thermosetting Materials

Silicone
(c)
Sealing

Cold Applied Thermoplastic Materials

Asphalt Emulsion
D 977

D 2397 Filling

Polymer-modified liquid asphalt D 977 D 2397 Filling (possibly sealing)

NOTES

(a) ASTM D 3405 or ASTM D 5078 except as follows.

· Softening point, 85 deg. C. minimum, ASTM D 36.

· Resilience, 30 percent recovery minimum at 25 deg. C plus or minus 1 deg. C, ASTM D 5329.

(b) Additives such as mineral fillers and fibers provide minimal elasticity to asphalt and do not significantly affect temperature susceptibility.

(c) Manufacturer’s recommended specification.

B.Selection of Sealer: Hot applied asphalt rubber or hot applied rubberized asphalt, unless specified otherwise.
C.Selection of Filler: Asphalt emulsion, unless specified otherwise.
PART 3EXECUTION
3.1CONSTRUCTION EQUIPMENT
A.Sealant Heating Equipment: Indirect heating using double boiler or circulating hot oil heat transfer for heating the product. Do not use direct heat transfer units (tar pots). Unit must have means of constant agitation.
B.Hot Compressed Air Lance: Provide clean, oil-free compressed air at a volume of 100 cubic feet per minute at a pressure of 120 pounds per square inch at the lance tip.
3.2PREPARATION
A.Allow at least one week for repaired cracks to cure and harden before placing thin overlays.
B.Repair Potholes full depth.
3.3CRACK FILLING AND SEALING
A.Blow cracks clean. Remove foreign matter, loosened particles, and weeds.
B.Use a hot air lance when surfaces are wet or when air temperature is less than 40 deg. F. Do not burn the surrounding Pavement. Fill cracks immediately after heating with the air lance or reheat.
C.Fill each crack to within 1/4 inch of the existing surface.
D.If a thin Pavement (chip seal, slurry seal, micro-surface) is to be applied, remove crack overfill by squeegee.
3.4PROTECTION
A.Place sand on surface of crack repair product if traffic or construction activities are likely to cause pull out. Replace pulled out product at no additional cost to the Government.
B.Repair vehicles or other property damaged by crack repair operation.

END OF SECTION