SECTION 31 23 33 BACKFILLING TRENCHES

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 31 23 33

SECTION 31 23 33

BACKFILLING TRENCHES

PART 1GENERAL
1.1SECTION INCLUDES
A.Trench backfill materials.
B.Trench backfilling requirements.
C.Surface restoration requirements.
1.2DEFINITIONS
A.Bedding: That surface of the Excavation or portion of the Pipe Zone below the pipe.
B.Pipe Zone: That zone in a backfilling operation which supports, and surrounds the pipe barrel, and extends to 1 foot above the top of the pipe barrel.
1.3SUBMITTALS
A.Submit maximum laboratory dry density and optimum laboratory moisture content for:
1.Subgrade material, and
2.Each type of fill to be used.
B.Upon ENGINEER's request, submit a written quality control Inspections and testing report describing source and field quality control activities performed by CONTRACTOR and its Suppliers.
1.4QUALITY ASSURANCE
A.Do not change material sources, or aggregate without COR’s knowledge.
B.Reject backfill material that does not comply with requirements specified in this section.
1.5STORAGE AND PROTECTION
A.Storage:
1.Safely stockpile backfill materials.
2.Separate differing materials, prevent mixing, and maintain optimum moisture content of backfill materials.
B.Protection:
1.During installation or repair, plug end of pipe or fitting except when installing next section of pipe or fitting.
2.Avoid displacement of and injury to Work while compacting or operating equipment.
3.Movement of construction machinery over Work at any stage of construction is solely at CONTRACTOR's risk.
1.6SITE CONDITIONS
A.Do not place, spread, or roll any backfill material over material that is damaged by water. Remove and replace damaged material at no additional cost to Government.
B.Control traffic and erosion. Keep area free of trash and debris. Repair settled, eroded, and rutted areas.
C.Reshape and compact damaged structural section to required density.
D.Restore any damaged structure to its original strength and condition.
E.Replace contaminated backfill at no additional cost to OWNER.
1.7SEQUENCING
A.Coordinate backfilling operation with pipeline commissioning requirements in Section 33 08 00.
1.8ACCEPTANCE
A.General:
1.Native material may be wasted as directed by COR if there is no additional cost to substitute material acceptable to COR.
2.For material acceptance refer to.
a.Common fill, Section 31 05 13.
b.Crushed aggregate base, Section 32 11 23.
c.Cement treated fill, Section 31 05 15.
B.Trench Backfilling: One test per Lot.

Table 1: Lot Size for Trench Backfilling Operation

Material
Lot Size
Subgrade (a)
200 lineal feet
Common Fill (a)
200 lineal feet per lift

25 square feet of footing area per lift

Crushed Aggregate Base (a)
200 lineal feet per lift

25 square feet of footing area per lift

Flowable Fill
50 cubic yards

NOTES

(a) Proctor density, Section 31 23 26

(b) Compressive strength, Section 31 05 15

(c) Lift thickness above the pipe zone before compaction, 8 inches.

1.9WARRANTY
A.Any settlement noted in Trench backfill or in structures built over the Trench backfill will be considered to be caused by improper compaction methods and shall be corrected at no cost to the Government.
B.Restore structures damaged by settlement at no additional cost to Government.
PART 2PRODUCTS
2.1BACKFILL MATERIALS
A.Common fill, Section 31 05 13.
B.Crushed aggregate base, Section 32 11 23.
C.Cement treated fill, Section 31 05 15.
D.Slag or asphalt bearing material not allowed.
2.2ACCESSORIES
A.Water: Make arrangements for sources of water during construction and make arrangements for delivery of water to site. Comply with local Laws and Regulations.
B.Geotextile Fabric: Section 31 05 19.
C.Identification Tape: Permanent, bright-colored, continuous-printed magnetic plastic tape, intended for direct-burial service; not less than 6 inches wide by 4 mils thick. The tape shall read "CAUTION: BURIED INSTALLATION BELOW". Color of tape as follows.
1.Red: Electric power lines, cables, conduit and lighting cables
2.Yellow: Gas, oil, steam, Petroleum or gaseous materials
3.Orange: Communications, alarm, signal, cables or conduits.
4.Blue: Potable water
5.Purple: Reclaimed Water, irrigation and slurry lines
6.Green: Sewer and storm drain lines
D.Trace Wire: Contractor shall provide and install a trace wire within one foot of all new utilities placed underground, or as otherwise indicated. Trace wire shall be #14 insulated copper wire. Installation shall meet the following requirements:
1.If length of new utility is 500 feet or less the Contractor shall install one terminal box of 2 ½” diameter pipe at each end of the wire marking the utility location.
2.If length of new utility is greater than 500 feet, the Contractor shall place terminal boxes at 500 feet intervals.
3.Terminal boxes (Handley Industries or approved equal) shall have a metal screw-on type lid.
a.The terminal box shall be encased in an 18” diameter by 12” deep concrete cylinder.
b.The terminal box lid shall be flush with the top of the concrete cylinder and the top of the concrete cylinder shall be flush with adjacent pavement or 2” above the adjacent ground elevation.
4.The trace wire shall have a metal identification tag attached to the wire at each terminal box. The tag shall be engraved with the type of utility, and for pipelines the tag shall be engraved with the pipe size.
PART 3EXECUTION
3.1PREPARATION
A.Verify backfill material meets gradation requirements, foundation walls are braced to support surcharge forces imposed by backfilling operations, areas to be backfilled are free of debris, snow, ice or water, and Trench bottom is not frozen.
B.If Subgrade is not readily compactable secure written authorization for extra excavation and backfill; Section 31 23 16.
C.Avoid injuring and displacement of pipe and structures while compacting soil or operating equipment next to pipeline.
D.Place geotextile fabrics; Section 31 05 19.
3.2GENERAL BACKFILLING REQUIREMENTS
A.Protect Subgrade from desiccation, flooding and freezing.
B.Do not damage corrosion protection on pipe.
C.Repair or replace damaged pipe at no additional cost to Government.
D.Withdraw sheathing, Shoring, piles, and similar supports as backfilling progresses. Backfill and compact all holes left by removals.
E.Provide sufficient water quality facilities to meet State water quality requirements.
F.Water settling of Trench backfill is not permitted. "Jetting" of Trench backfill is prohibited.
3.3PIPE ZONE
A.Maintain uniform foundation along barrel of pipe with sufficient relief for joint connections.
B.Use backfill materials meeting pipe manufacturer's recommendations. Maximum backfill particle size is 3/4 inch for plastic pipe.
C.Do not permit free fall of backfill material which may damage pipe, pipe finish, or pipe alignment.
D.Except where piping must remain exposed for tests, fill Pipe Zone as soon as possible.
3.4TRENCH ABOVE PIPE ZONE.
A.Maximum lift thickness before compaction is 8 inches.
B.Fill unauthorized Excavations with material acceptable to COR at no additional cost to Government.
C.Do not damage adjacent structures or service lines.
D.Install continuous plastic line marker directly over buried lines 18 inches below finished grade.
3.5MODIFIED BACKFILL LAYER METHOD
A.At discretion of Contractor, backfill may be placed in thicker layers than indicated above subject to the following provisions.
1.Contractor proves the ability of proposed method to achieve specified average compaction density.
2.COR, on the basis of test results, approves the system in writing.
B.Should Contractor find it necessary to change the method or any part of it, including the source of material, or the rate of placing the material, obtain approval of COR, who may require a further trial area.
C.If testing shows a previously approved system is no longer producing the required degree of compaction, make changes to comply.
D.Where vibration effects are creating environmental problems, make changes to eliminate problems.
3.6COMPACTION
A.Compact backfill, Section 31 23 26.
1.A-1 soils: 95 percent or greater of a Modified Proctor Density.
2.Other soils: 95 percent or greater of a Standard Proctor Density.
3.7COMPRESSIVE STRENGTH
A.Where a flowable fill is used, provide compressive strength indicated in Section 31 05 15. Use fill which flows easily and vibration is not required.
3.8SURFACE RESTORATION
A.Provide temporary paved surfaces where Trenches pass through roadways, Driveways or sidewalks.
B.Restore paved surfaces.
C.Finish landscaped surfaces with grass, Section 32 92 00 or with other ground cover, Section 32 93 13.
3.9CLEANING
A.Remove stockpiles from the site. Grade site surface to prevent free standing surface water.
B.Leave borrow areas clean and neat.

END OF SECTION