SECTION 31 23 16 EXCAVATION

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 31 23 16

SECTION 31 23 16

EXCAVATION

PART 1GENERAL
1.1SECTION INCLUDES
A.Excavation and disposal of excavated materials.
B.Protection of existing facilities, utilities, and structures affected by excavation.
1.2DEFINITIONS
A.Extra Excavation: Upper limit of Excavation is proposed excavation limit. Lower and lateral limits are as authorized by COR.
B.Classified Excavation: The excavation of specified materials.
C.Incidental Excavation: Excavation done for Contractor's benefit, excavation error, dewatering of Excavation, slough, or over-break.
D.Unclassified Excavation: The excavation of all materials encountered regardless of the nature, size, or manner in which they are removed. Presence of isolated boulders or Rock fragments will not be sufficient cause to change classification of surrounding materials.
1.3STORAGE AND HANDLING
A.Stockpile excavated material to cause a minimum of inconvenience to public and provide for emergency services as necessary.
B.Provide free access to all existing fire hydrants, water and gas valves, and meters.
C.Provide free flow of storm water in all gutters, conduits, and natural water courses.
D.Utilize traffic control signs, markers, and procedures in product storage and handling activities.
E.Promptly remove other material from site.
1.4SITE CONDITIONS
A.Prior to excavation, photograph existing surfaces along which work may take place in order to determine, after construction is completed, whether any damage to existing improvements occurred prior to construction operations. Refer to construction photograph requirements, Section 01 78 39.
B.Perform Incidental Excavation at no additional cost to OWNER.
PART 2PRODUCTS
2.1MATERIALS FOR OVER EXCAVATED AREAS
A.Common fill, Section 31 05 13.
B.Crushed aggregate base, Section 32 11 23.
C.Stabilization fill, crushed aggregate base or common fill with maximum rectilinear particle size of 2 inches.
D.Stabilization fabric, Section 31 05 19.
PART 3EXECUTION
3.1PREPARATION
A.Use white paint and mark the proposed Excavation.
B.Submit Dig Permit request to COR, see Section 01 31 13. Typical color of marks indicate the following.
1.White: Proposed Excavation
2.Pink: Temporary survey markings
3.Red: Electric power lines, cables, conduit and lighting cables
4.Yellow: Gas, oil, steam, Petroleum or gaseous materials
5.Orange: Communications, alarm, signal, cables or conduits.
6.Blue: Potable water.
7.Purple: Reclaimed Water, irrigation and slurry lines
8.Green: Sewer and storm drain lines
3.2PROTECTION
A.Identify required lines, grades, contours, and benchmarks, Section 01 71 23.
B.Pothole, expose or otherwise locate utilities as necessary to locate a marked utility that interferes with or may be damaged by excavation work.
C.Where utilities or structures conflict with design grades, report conflict to the COR 14 days prior to the initiation of work within the conflict area.
D.For temporary controls, refer to Section 01 57 00.
E.Support and protect from damage any existing facility and structure that exists in, passes through, or passes under the site.
F.No Contract Time extension shall be granted and no additional compensation shall be made if CONTRACTOR fails to pothole and identify buried utilities or structures which conflict with the Work.
3.3TOPSOIL
A.Excavate topsoil only to depth that will preserve topsoil quality.
B.Do not mix topsoil with subsoil during stockpiling or spreading.
3.4LANDSCAPE SPRINKLER SYSTEMS
A.Protect existing landscape sprinkler systems.
B.When disturbance of existing sprinkler system is required, interrupt and repair system so operation of system is maintained.
3.5SHORING
A.Slope, shore, sheet, brace or otherwise support Excavations over 4 feet deep, in accordance with OSHA requirements.
B.When soil conditions are unstable, Excavations shallower than 4 feet deep must also be sloped, supported or shored.
3.6DEWATERING
A.Keep Excavation free from surface and ground water.
B.If ground water table is in the intended construction operations, dewater Excavations.
C.If there are no olfactory or visual indications of contamination in the water, discharge according to requirements of Federal, State or local agency having jurisdiction.
D.If any evidence of contamination in the water, based on olfactory or visual indications, cease excavation work until potential risks are evaluated. During evaluation, handle water as a contaminated material.
E.Pay for damages and costs resulting from dewatering operations.
3.7GENERAL EXCAVATION REQUIREMENTS
A.Excavate topsoil from areas to be relandscaped or regraded and other marked areas.
B.Excavate site to line and grade indicated.
C.Carefully excavate soils in vicinity of buried utility marks.
D.Where soil has been softened or eroded by flooding or hardened by drying during unfavorable weather, rework all damaged areas or replace with approved material at no additional cost to Government.
E.Notify COR of unexpected subsurface conditions.
F.Underpin adjacent structure, service utilities and pipe chases that may be damaged by Excavation work.
G.Protect Excavation walls as required. If conditions permit, slope Excavation Sides to maintain a safe and clean working area. Remove loose materials.

H.Where COR deems subgrade material to be susceptible to frost heave or otherwise unsatisfactory, excavate additional depth.

3.8ROADWAY EXCAVATION
A.In advance of setting line and grade stakes, clean Subgrade area of brush, weeds, vegetation, grass, and debris. Drain all depressions or ruts that contain water.
B.Backfill and compact over excavation, Section 33 23 26.
3.9STRUCTURAL AND LANDSCAPE EXCAVATION
A.Provide Shoring, cribs, cofferdams, caissons, pumping, bailing, draining, sheathing, bracing, and related items.
B.For piling work, coordinate special requirements for piling. Protect Excavation walls.
C.If conditions permit, slope Excavation Sides as excavation progress. Maintain a safe and clean working area.
D.Support Excavations. Do not interfere with the bearing of adjacent foundations, pipelines, etc.
3.10TRENCH EXCAVATION
A.Grade bottom of Trenches to provide uniform bearing surface.
B.If necessary, make bellholes and depressions required to complete joining of pipe or box.
C.Limit width of Trench excavations to the dimensions suitable for worker access per pipe manufacturer's recommendation. Provide enough space for compaction equipment. Notify ENGINEER if excavation operations exceed any indicated line and grade limits.
D.In public thoroughfares and regardless of Trench depth, limit length of open Trenches to 200 lineal feet day or night. Provide barricading, Section 01 55 26. Protect Trenches over night.
3.11EXTRA EXCAVATION
A.If unstable material is encountered at the bottom or face of any Excavation, do not perform extra excavation without written consent.
B.Correct excavations beyond the specified lines and grades by filling and compacting the resulting voids with acceptable fill.
C.Volume of Excavation within any specified pay limit will be determined by the method of average-end-areas in the original position.
3.12TOLERANCE
A.Grading: Top surface of Subgrade = plus or minus 1 inch.

END OF SECTION