Section_02_41_00_Demolition.docx

DOCX document 29 KB Posted

Attached to
Dugway Proving Ground, Utah Road Maintenance
Solicitation number
W911S6-17-B-0001
Issued by

About this file

SECTION 02 41 00 DEMOLITION

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 02 41 00

SECTION 02 41 00

DEMOLITION

PART 1 GENERAL

1.1SECTION INCLUDES
A.Remove, dispose of, or salvage buildings, fences, structures, pavements, curb, gutter, driveways and approaches, sidewalk and similar hard surfaces, abandoned pipelines or utility items and other obstructions that interfere with construction on or off the site including, but not limited to, foundations, bridges, culverts, guardrail, concrete work, septic tanks, trees, etc.
B.Salvage as specified, or dispose of in an approved manner.
1.2REFERENCES
A.ASSE/SAFE A10.6: Safety Requirements for Demolition Operations
B.EM 385-1-1: U.S. Army Corps of Engineers Safety and Health Requirements Manual
1.3SITE CONDITIONS
A.Before beginning any demolition or deconstruction work, survey the site and examine the drawings and specifications to determine the extent of the work. Record existing conditions in the presence of the COR showing the condition of structures and other facilities adjacent to areas of alteration or removal. Photographs sized 4 inch will be acceptable as a record of existing conditions. Include in the record the elevation of the top of foundation walls, finish floor elevations, possible conflicting electrical conduits, plumbing lines, alarms systems, the location and extent of existing cracks and other damage and description of surface conditions that exist prior to before starting work.
B.Protect adjacent structures and utilities and their contents that are designated to remain.
1.4DUST CONTROL
A.Control dust per Section 01 57 00.
1.5PROTECTION
A.Protect adjacent structures and utilities and their contents that are designated to remain.
B.Salvageable materials and equipment shall be protected from the weather at all times.
C.Repair or replace damaged structures, pavements, curbs and gutters, sidewalks, trees and shrubs, utilities, and etc. that are identified either to remain or to be relocated at no additional cost to Government.

1.6 BURNING

A. The use of burning at the project site for the disposal of refuse and debris will not be permitted.

1.7USE OF EXPLOSIVES
A.Use of explosives will not be permitted.
1.8SUBMITTALS
A.Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only.
B.SD-01 Preconstruction Submittals
1.Existing Conditions; G
2.Demolition Plan; G
1.8QUALITY ASSURANCE
A.Furnish timely notification of demolition projects. Notify the COR in writing 14 days prior to the commencement of work.
B.Comply with federal, state, and local hauling and disposal regulations.
C.In addition to the requirements of the "Contract Clauses," conform to the safety requirements contained in ASSE/SAFE A10.6.

PART 2 PRODUCTS Not Used

PART 3 EXECUTION

3.1PREPARATION
A.Review all work procedures with COR.
B.Coordinate utility location in accordance with Section 01 31 13.
C.Preserve all active utilities.
D.Traffic Control: Provide worker and public safety, Section 01 55 26.
E.Tree Roots: Avoid or minimize damage to tree roots. Roots provide anchorage, storage of energy, and absorption and conduction of water and mineral elements. Loss of root connection affects health and stability of tree and safety of people and property.
3.2UTILITIES
A.Remove existing utilities as indicated and terminate in a manner conforming to the nationally recognized code covering the specific utility and approved by the COR or as otherwise indicated.
B.When utility lines are encountered but are not indicated on the drawings, notify the COR prior to further work in that area.
C.Remove meters and related equipment and deliver to a designated location in accordance with instructions of the COR.
D.Plug disconnected storm drains or sewer lines with a watertight concrete plug extending at least 2 ft into the remaining pipe.
E.Service Laterals: Excavate and shut off the corporation stop. Disconnect and cap.
3.3STRUCTURES
A.Remove structures and incidentals such as but not limited to foundations, sidewalks, pavement slabs, fences and outbuildings.
B.Remove foundation walls at least 2 feet below the finished grade or 2 feet below the natural ground surface. Remove floor slab or break it into pieces no larger than 3 feet square.
C.Backfilling and compaction of Excavations for structures, Section 31 23 23.
D.Pavements:
1.Portland Cement Concrete
a.Remove concrete to the nearest expansion joint or vertical saw cut.
b.Make concrete cuts straight, vertical to the surface, true, full depth.
c.DO NOT use machine mounted impact hammers.
2.Asphalt Concrete
a.Saw cut full depth and remove Pavement.
b.When asphalt concrete overlays Portland cement concrete Pavements do not use a machine mounted impact hammer.
3.Provide neat saw cuts at limits of pavement removal as indicated.
4.Pavement and slabs designated to be recycled shall be moved, ground and stored as directed by the COR.
E.Chain Link Fencing
1.Remove chain link fencing, gates and other related salvaged items scheduled for removal and transport to designated areas.
2.Remove gates as whole units.
3.Unless otherwise approved by the COR, cut chain link fabric to 25 foot lengths and store at designated location in rolls off the ground.
3.3DISPOSITION OF MATERIAL
A.Title to material and equipment to be demolished, except any Government salvage and historical items, is vested in the Contractor upon receipt of notice to proceed. The Government will not be responsible for the condition, loss or damage to such property after notice to proceed.
B.Concrete, asphalt and other noncombustible material, except concrete and asphalt permitted to remain in place, shall be disposed outside of the Government property.
C.Remove and dispose of all material promptly using methods acceptable to the Engineer and in accordance with all applicable rules and regulations.
D.Obtain all required permits and dispose in an environmentally safe manner.

3.4 CLEAN UP

A. Remove all debris and concrete dust. Clean surrounding rails, sidewalks, Driveways, landscaping and other objects in vicinity of work.

END OF SECTION

DEMOLITION Page 1