SECTION 01 00 00 GENERAL REQUIREMENTS

View the file

Other files

File Type Posted
W911S6-17-B-0001-0001.pdf PDF
Revised_Technical_Exhibit_A_Through_E__21_March_2017.xlsx XLSX spreadsheet
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Site_visit_sign_in_roster_(2).pdf PDF
W911S6-1-B-0001_Site_Visit_Slides_DPG_Road_Maintenance_13_Mar_2017.pptx PPTX presentation
SECTION_01_74_13_Progress_Cleaning.docx DOCX document
Section_02_41_13.13_Pavement_Removal.docx DOCX document
Technical_Exhibit_A_Through_E__11NOV16.xlsx XLSX spreadsheet
Section_32_12_36.14_Chip_Seal_Coat.docx DOCX document
SECTION_31_37_00_Riprap_or_rock_lining.docx DOCX document
SECTION_01_71_16_Acceptance.docx DOCX document
Section_33_05_13.13_Utility_Grade_Adjustment.docx DOCX document
Section_32_12_36.15_Micro-Surface_Seal.docx DOCX document
SECTION_33_13_00_Disinfection.docx DOCX document
SECTION_33_11_00_Water_Distribution_and_Transmission.docx DOCX document
SECTION_33_08_00_Commissioning_of_Water_Utilities.docx DOCX document
Section_32_12_15_HMA_for_Airfields.docx DOCX document
Section_32_11_23_Untreated_Aggregate_Base_Course.docx DOCX document
Section_33_11_00.07_Polyvinyl_Chloride_Pipe.docx DOCX document
SECTION_32_01_16_Recycled_Asphalt_Paving.docx DOCX document
SECTION_05_05_10_Metal_Galvanizing.docx DOCX document
SECTION_32_13_73_Concrete_Paving_Joint_Sealants.docx DOCX document
Section_01_55_26_Traffic_Control.docx DOCX document
Section_01_78_39_Record_Documents.docx DOCX document
Section_01_71_23.16_Construction_Surveying.docx DOCX document
SECTION_05_12_00_Structural_Steel.docx DOCX document
SECTION_03_61_00_Cementitious_Grouting.docx DOCX document
SECTION_32_12_16.19_Cold_Mix_Asphalt.docx DOCX document
SECTION_33_31_00_Sanitary_Sewerage_Systems.docx DOCX document
Section_32_12_16_Hot_Mix_Asphalt_for_Roads.docx DOCX document
Section_32_17_23_Pavement_Markings.docx DOCX document
Section_32_31_13_Chain_Link_Fence.docx DOCX document
SECTION_03_39_00_Concrete_Curing.docx DOCX document
Section_01_77_00_Closeout_Procedures.docx DOCX document
SECTION_03_11_00_Concrete_Forming.docx DOCX document
SECTION_31_23_23.23_Compaction.docx DOCX document
Section_32_11_28_Cold_Recycled_Asphalt_Base.docx DOCX document
Section_31_05_19.13_Geotextiles.doc DOC document
SECTION_33_11_11_Relocate_Water_Meters_and_Fire_Hydrants.docx DOCX document
SECTION_03_20_00_Concrete_Reinforcing.docx DOCX document
Section_32_01_13.61_Slurry_Seal.docx DOCX document
SECTION_05_05_23_Bolts_Nuts_and_Accessories.docx DOCX document
SECTION_03_40_00_Precast_Concrete.docx DOCX document
Section_31_11_00_Clearing_and_Grubbing.docx DOCX document
Section_32_12_19.19_Open-Graded_Surface_Course.docx DOCX document
SECTION_31_05_19.19_Geogrids_Geocomposites.docx DOCX document
SECTION_05_56_00_Metal_Castings.docx DOCX document
SECTION_01_11_00_SUMMARY_of_WORK.docx DOCX document
Section_34_71_13_Vehicle_Barriers.docx DOCX document
SECTION_32_12_43_Porous_Paving.docx DOCX document
Show 40 more

Latest 50 of 87 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 01 00 00

SECTION 01 00 00

GENERAL REQUIREMENTS

PART 1 GENERAL

0. SECTION INCLUDES

A. This section is a general section, which applies to all sections. The work encompassed by this specification and noted on the drawings consists of furnishing all labor, equipment, and material unless otherwise stated, to accomplish the construction project.

0. SUMMARY

B. Refer to Statement of Work.

0. SITE VISIT

2. Bidders are responsible for site investigation in accordance with General Provision entitled Site Investigation and Conditions Affecting Their Work (FAR 52.236-3).

2. If this project involves work in an existing facility, the Contractor is cautioned that this project may present problems, which would not be encountered in new construction.

0. CONTRACT DRAWINGS AND SPECIFICATIONS

A. The Contractor must comply with the general provisions entitled Specifications and Drawings for Construction (FAR 52.236-21) and Contract Drawings, Maps, and Specifications (DOD FAR SUP 252.236-7001).

0. SUBMITTALS

4. Refer to Specification Section 01 33 00 for additional submittal requirements.

4. All shop drawings/submittals as required under this section of this specification will be submitted in 5 copies to the Contracting Officer.

4. The submittals shall contain sufficient literature, catalog cuts, brochures, etc., to show compliance with the contract specifications and plans. Items of related equipment or materials shall be submitted at one time. Each copy shall be in a separate binder. Mark all submittals to show choices and applicable options.

4. Submittals shall be given to the COR as soon as possible, but in no case shall submittals exceed sixty (60) days after the date of the notice to proceed. No payments will be authorized for materials or work, which do not have approved required submittals.

4. The Government will within 14 calendar days return a submittal response to the Contractor. The Contractor shall make any corrections indicated. If the Contractor considers any correction to constitute a change to the contract drawings or specifications, written notice will be given to the Contracting Officer. Disapproved items will require resubmission for approval within 14 calendar days of Contractor's receipt. The Contractor will not be allowed to claim for time because of disapproved submittals.

4. Submit all items called for in the drawings and specifications.

4. Submittals approved by the Contracting Officer shall not relieve the Contractor from responsibility for complying with the requirements of this contract (See FAR 52.236-5). No substitutions for approved items, which meet contract requirements, will be allowed without approval of the Contracting Officer. If submittals show variations from the contract requirements, the Contractor shall describe such variations in writing at the time of submission.

0. PROPRIETARY NAMES

A. Names indicated for colors, textures, patterns and other characteristics of materials; or names identifying specific mechanical and electrical equipment are for selection only. Other manufacturers' materials and equipment are acceptable provided they closely resemble all specified salient characteristics and conform to all other requirements of those products mentioned by name.

0. STORAGE OF MATERIALS

6. Store materials so as to avoid hindering the work of other Contractors and to avoid damage or soiling of materials. All materials and equipment shall be stored and handled to preclude the inclusion of foreign matter and damage by water or breakage. Store packaged materials in original containers until ready for use. Materials showing evidence of water or other damage shall be rejected and removed from the post. All materials shall be stored as recommended by the manufacturer, unless specifically noted otherwise in the contract documents. Store in accordance with general provisions entitled Operations and Storage Areas (FAR 52.236-10).

6. When pipe and conduit are stored on the site, they shall be stored in racks or blocked to prevent rolling.

6. When combustible materials are stored on the site they shall be stored in an OSHA approved combustible materials locker at least 50 feet (15 meters) from all buildings unless otherwise specifically indicated by the Contracting Officer.

6. It is the responsibility of the Contractor to secure all property within the construction site. If government property is included, the Contractor must secure it also, and notify the Contracting Officer and the COR.

0. EXCAVATION PERMIT

7. No excavation shall be done prior to receiving an Excavation Permit. Permits may be obtained by contacting the COR. If excavation is started without obtaining a permit, the Contractor shall be held liable for repairs of any broken utility lines or other damage resulting from the broken lines.

7. The Contractor shall request a permit a minimum of 30 calendar days prior to scheduled start of digging.

7. Hand digging shall be required to locate utilities shown on the contract drawings, Excavation Permit, or 3 feet (1 meter) on either side of locations identified by Base Operations Contractor.

7. Protection of existing utilities shall be provided in accordance with general provisions entitled Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (FAR 52.236-9).

7. All newly installed underground utilities shall be surveyed before the utilities are buried. Provide at least 48 hours of advance notice to the COR that the utilities will be ready for surveying. If contractor fails to notify the COR and the utilities are buried, the contractor will be required to uncover the utilities. Uncovering and reburial of utilities will be at no additional cost to the Government.

0. TESTING

8. Where specific tests are required by this contract, the Contractor shall notify the COR 24 hours prior to testing, unless a different time period is specified herein.

8. The Contractor shall turn in a test report, if required, to the COR as soon as possible but no later than four days.

8. The Contractor shall not proceed with any work, which would cover up the work being tested until the work being tested has been approved by the COR.

0. WARRANTIES

A. This project shall be under warranty as set forth in the General Provision entitled Warranty of Construction (FAR 52.246-21).

0. WORK SCHEDULE

10. All work shall be accomplished during normal working hours (0700 to 1730 Hours) exclusive of Fridays, Saturdays and Sundays, and holidays unless other times are approved by the Contracting Officer, or as otherwise stated in the contract. Coordinate the work schedule with the COR.

0. UTILITY OUTAGES AND TRAFFIC CLOSURES

A. All utility outages; and traffic closures including streets, parking lots, and pedestrian closures shall be scheduled during off duty hours and weekends unless otherwise approved by the COR. All outages and closures shall be scheduled as far in advance as possible with the COR and in no case less than 14 calendar days before the outage or closure. The Contractor shall obtain in writing from the COR a statement or schedule giving the permissible times for the outage or closure for particular installations and the maximum time allowed for such outage or closure. The Contractor shall strictly observe such schedules and will be held responsible for any violations.

0. SAFETY REQUIREMENTS

12. GENERAL SAFETY REQUIREMENTS: The contractor shall comply with occupational safety and health regulations. These applicable regulations include the US Army Corps of Engineers EM 385-1-1 Safety and Health Requirements Manual, (see Contract Clauses ACCIDENT PREVENTION); 29 Code of Federal Regulations (CFR) 1910, Occupational Safety and Health, General Industry Standards; and 29 CFR 1926, Occupational Safety and Health, Safety and Health Regulations for Construction. In case of conflict the most stringent requirements of the standards is applicable. If recurring violations and/or gross violation indicate that the safety performance is unsatisfactory, corrective action shall be taken as directed by the Contracting Officer or the COR.

B. ELECTRICAL SAFETY REQUIREMENTS: Contractor shall comply with applicable electrical safety requirements contained in the Unified Facilities Criteria (UFC) 3-560-02. This document also references ANSI C2, National Electrical Safety Code (NESC); NFPA 70, National Electrical Code (NEC); NFPA 70B, Electrical Equipment Maintenance; NFPA 70E, Electrical Safety in the Workplace. All assigned personnel are required to wear the appropriate PPE according to the conditions and task at hand. Guidelines set forth in NFPA 70E, Unified Facilities Criteria, and the NEC shall be adhered to at all times. Proper use of appropriate PPE protects you from the devastating effect of arc flash/blast. The level of PPE required for each instance may be different and is dependent on voltage and approach distance. Some general guidelines are as follows:

0. 0-240 Volts: Work on energized parts including testing, removal/installation of circuit breakers or fused switches or removal of bolted covers exposing live parts, or work in an energized light fixture. This work is classified as Category 1: FR lightweight coveralls or heavyweight pants and long sleeved shirt, safety glasses, and low voltage gloves are required.

0. 277-480 Volts: Turning circuit breakers or fused switches on and off with covers off, or opening hinged covers to expose live parts is classified as (Category 1 see above). Removing bolted covers to expose bare and energized parts and testing or working on energized equipment is classified as Category 2: FR coveralls over cotton pants and shirt, sock hood, face shield, safety glasses, and low voltage gloves are required.

0. Over 1000 volts without hot stick: Category 2: FR coveralls over cotton pant and long sleeve shirt, sock hood, face shield, safety glasses, and high voltage gloves are required for: Work on 120 volt control circuits while exposed to over 1000 volts, inspection of insulated cable in open area, operation of S&C type switch, circuit breaker with doors closed, or air switch operation.

0. Over 1000 volts without hot stick: Category 4: FR Carhartts, sock hood, face shield, safety glasses, and high voltage gloves are required for: Switch operation with doors open, opening high voltage side of transformer, removing bolted parts to expose live parts, testing, insulated cable examination in a manhole or confined area, and all substation work including breaker operations and racking in/out breakers with doors open or closed.

0. 7200/12470 volts at greater than 8 feet hot stick distance: Category 2: FR lightweight coveralls, high voltage gloves, hardhat, safety glasses (or face shield hardhat combo), arc flash rated safety harness are required for: Phasing/testing of lines, ground set installation, fused cutout operation, saddle/tap installation on overhead lines.

0. 7200/12470 volts at less than 8 feet hot stick distance: Category 4: FR Carhartts, sock hood, face shield, safety glasses, high voltage gloves, and arc flash rated safety harness are required for: All operations at less than 8 feet hot stick distance.

C. HOTWORK SAFETY: Any cutting, welding, brazing, or other hot work shall comply with DPG Regulation 420-8. A Welding, Cutting and Brazing permit is required daily for all hot work and can be obtained from the Dugway Fire Department.

0. COLD WEATHER PRECAUTIONS

13. Contractor shall be responsible for proper application of weather sensitive materials and shall not apply any such materials when weather conditions fall below the minimums recommended by the material manufacturer.

13. Contractor shall cover all concrete installed in weather below 32 0F (O 0C) with approved insulating blankets.

13. Contractor is responsible in weather below 40 0F (4 0C) that water lines, including fire protection systems, do not freeze.

13. Contractor shall maintain unoccupied interior portions of building under construction above 50 0F (10 0C). Contractor shall maintain occupied portions of the building under construction above 65 0F (18 0C). This requirement shall also apply in the event that available heating supplied by the building system is rendered inadequate by the Contractor during the course of construction to maintain the above temperature.

13. The only type of temporary heating devices permitted are UL approved electric heaters. The Contractor shall physically monitor all temporary heating devices at least every four hours. Exception to this requires written approval from the Fire Department.

0. PROTECTION OF GOVERNMENT PROPERTY AND PERSONNEL

14. Work areas for this work shall include the following:

0. Actual Construction Site: Area or areas in which the work of the contract is accomplished or performed.

0. Storage Areas: Area or areas used for the storage of materials, devices, appliances, and equipment to be used in the work.

0. Office and Shed Areas: Area or areas for placing or setting of temporary field office, tool sheds or storage sheds.

0. Transportation Areas: Paved, treated or unpaved area or areas that are used for transportation or parking purposes.

0. The entire project shall be fenced with temporary construction fencing at the direction of the COR.

14. The Contractor shall conduct the Work so the Government property and personnel, other personnel, and work areas, shall be protected at all times from inconvenience, damage of any nature, or injury caused by this work until completion of the contract.

14. The Contractor shall furnish and spread drop cloths in the work areas as required to protect surfaces, etc.

14. In the event of damages of any nature caused by this work due to improper protection, precaution of safety measures, such damages shall be repaired or such property shall be replaced by the Contractor at no expense, cost, or charge to the government. In the event the Contractor does not satisfactorily repair or replace such damage caused by the work of this contract, the government reserves the right to make the necessary corrections and deduct from the contract price the cost to the government for inconveniences, labor, materials, etc. involved. Reference General Provisions Protection of Existing Vegetation, Structures, Equipment, Utilities and Improvements (FAR 52.236-9). Landscaped areas disturbed by construction activities shall be restored to the original condition or better. Grass, cobble and other landscaping features shall be restored in kind.

14. The Contractor shall furnish, place, and maintain all required barricades as directed by the Safety Office and the COR, and access drives and doors will remain clear at all times.

14. It shall be the responsibility of the Contractor to prevent any damage to existing pavements beyond the limits of indicated pavement removal. Existing pavements that are to remain and are damaged by the Contractor shall be replaced in kind or repair as directed by the Contracting Officer at no expense to the government. Road/lane closures-traffic interruption. The Contractor will submit for approval 15 days prior to commencing work a barricade and sign plan clearly showing work area, location, and type of sign to be placed for rerouting traffic. Part VI, The Manual on Uniform Traffic Control Devices will be used for traffic signing and barricades.

14. The Contractor shall conduct his operations to offer the least possible obstruction and inconvenience to public traffic, and all traffic shall be permitted to pass through work with as little delay as possible. Where the nature of construction operations in progress and the equipment and machinery in use are of such character as to endanger passing traffic, the Contractor shall provide such lights and signs, erect such fences or barriers, and station such guards as may be necessary to give adequate warning and to avoid damage or injury to passing traffic. Signs, flags, lights and other warning and safety devices shall conform to applicable city, county, and state requirements

0. HOUSEKEEPING AND DAILY CLEANUP

A. The Contractor shall keep the total construction site, structures, and access ways free of debris and obstructions at all times. Work will not be allowed in those areas that, in the opinion of the COR, have unsatisfactory cleanup and housekeeping at the end of the preceding days' normal work shift. At least once each day all areas shall be cleaned by the Contractor.

0. COVERING OF DEBRIS

A. The Contractor and Subcontractor shall be responsible to cover all loads of debris before hauling them off post. The Contractor and Contractor’s Subcontractor(s) shall provide a covering to keep the debris on the truck; however, in the event debris does fall out of the truck while hauling Contractor/Subcontractor shall immediately clean up all debris.

0. REMOVALS AND SALVAGE

17. Contractor shall be responsible for the removal and/or dismantling of items, which are required for proper completion of work as applicable to each section.

17. All materials and equipment resulting from this work not designated for reuse in new work nor designated to be salvaged for the government, become property of the Contractor, and shall be removed from site as the materials and equipment are accumulated and disposed off post. All excavated material (dirt, asphalt, concrete, etc.) and construction/demolition debris shall be managed in accordance with paragraph ENVIRONMENTAL PROTECTION.

0. FINAL CLEANING

18. Execute prior to final inspection.

18. Clean surfaces exposed to view. Remove temporary labels, stains, and foreign substances: polish transparent and glossy surfaces, wet mop tile or sealed concrete floors, vacuum carpeted floors, broom clean other floors. Clean equipment and fixtures to a sanitary condition, clean or replace filters of mechanical equipment. Any additional final cleaning as specified in other sections.

18. Clean site of all construction related and project related debris.

18. Remove waste and surplus materials, rubbish, and construction facilities from the work areas and the site.

0. OPERATION & MAINTENANCE (O&M) MANUALS AND TRAINING

19. Provide O&M Manuals as required by other sections of this specification. O&M Manuals to be submitted and approved.

19. Provide O&M Training as required by other sections of this specification.

0. CLOSEOUT PROCEDURES

20. Refer to related Section 01 78 50 Closeout Procedures.

20. The Contractor shall include but not be limited to the following items as a “Contract Close out” line item on both the Contract Progress Schedule (AF-3064) and Contract Progress Report (AF-3065): O&M Manuals, Training, , Warranty Information, DD From 1354 and Complete Record Documents.

20. The contract cannot be closed out nor final payment made until these items have been received from the Contractor.

20. The Contractor shall have turned in all Test Reports and shall have completed all training prior to the prefinal inspection.

20. The contract cannot be closed out nor final payment made until these items have been received from the Contractor.

20. The Contractor shall notify the Contracting Officer 7 working days in advance that his contract is substantially complete and is ready for a prefinal inspection. Contractor shall submit in writing a list of items to be completed or corrected.

20. Upon completion of final inspection, the Contractor shall have five working days to submit warranty information, DD Form 1354 (attach IBE and EIP lists in accordance with UFC 1-300-8, 4-4) and provide complete record documents. The Contracting Officer will notify the Contractor in writing of additional items to be completed or corrected.

20. Contractor shall remedy deficiencies and notify the Contracting Officer a minimum of 5 working days in advance of the date the contract will be completed and ready for a final inspection. Contractor shall send a second notice of substantial completion and the work will be re-inspected.

20. Upon completion of the final inspection, the Contracting Officer will notify the Contractor in writing of any deficiencies remaining on the project.

0. TRANSFER AND ACCEPTANCE OF MILITARY REAL PROPERTY

21. At the completion of the project the contractor shall finalize the DD Form 1354 including UFC 1-300-08 Appendix D which were provided by the government. Instructions to complete the DD Form 1354 are contained in Unified Facilities Criteria (UFC) 1-300-08.

0. RECORD DRAWINGS

22. Maintain a complete set of full-size prints of the contract drawings and shop drawings for record mark-up purposes throughout the contract period. Contractors that receive the solicitation via the web site shall produce one set of full-size prints to meet this requirement. Whenever changes occur the contractor shall immediately mark-up these drawings in red, to show both changes and the actual installation in sufficient detail to form a complete record of work accomplished. Sign and date each mark-up redline as it occurs. The marked-up drawings shall be complete, legible, precise and understandable to a CAD operator person who is not familiar with the project. Whenever a revision is made the contractor shall ensure related section and elevation views, details, legend, plans, profiles, schedules and notes are marked accordingly to avoid conflicting data on all other sheets. Comments shall be complete without reference to change orders, letters, memos, etc. The marked-up drawings will be bound in manageable sets covered with durable paper and labeled to show project title and number.

22. B. Particular attention should be given to work, which will be concealed and difficult to measure and record after construction, and work which may require servicing or replacement during the life of the facility, Section 01 78 39 Record Documents.

22. Upon completing the work under this contract, the contractor shall furnish a complete set of as built structural steel shop drawings in mylar reproducible and electronic format. These drawings shall show all changes and revisions made on the job.

22. The Government will review the contractor’s marked-up drawings when verifying the performance shown by progress reports. If the drawings are not current, the progress report will be adjusted downward by the COR to reflect the contractor’s non-compliance. Marked-up drawings will be submitted within five working days after substantial completion. Final payment will not be authorized until complete and accurate red-lined drawings are accepted by the COR.

0. UTILITY LINE MARKING

23. Contractor shall provide and install a trace wire, Section 33 05 20 Backfilling Trenches.

0. B.The Contractor shall provide a detectable warning tape for all underground utilities, Section 33 05 20 Backfilling Trenches.
C.Contractor shall provide a 14-day notice to the COR to allow the Base Operations Contractor to map all new utility lines. Contractor shall not backfill utility trenches until the lines have been mapped and approval given.

0. ENVIRONMENTAL PROTECTION

A.The Contractor is required to comply with all applicable local, state, federal, and Department of Defense laws and regulations dealing with environmental and workplace management and protection. In the event of a conflict between any laws or regulations, the most stringent shall apply. These items include, but are not limited to, the following:
BVehicles and other powered equipment will meet local (Tooele County) air quality regulations for emissions. They will be mechanically sound and have all seals, grease rings, and other containment systems in place to ensure against leakage. Drip pans will be maintained such that overflow and spills do not occur. There will be no activities for equipment maintenance including oil changes, filter replacements, or hydraulic equipment repair performed on post.
C.All solid waste shall be collected and disposed of on a daily basis. There will be no accumulation of solid waste unless properly containerized or put within a fenced area to prevent material being blown about by the wind. No liquids will be put into post dumpsters. This includes paints, oils, chemicals, compressed gas, or pesticides.

0. Paint Cans. Only empty paint cans shall be allowed in dumpsters. Empty containers have to comply with the “RCRA empty rule” before they become a non-hazardous solid waste. For cans of spray paint, if the nozzle breaks and the contents cannot be sprayed, the can may be turned in to the Hazardous Waste Control Facility.

0. Asphalt debris shall be managed by disposing in a Class I, II, III, or V permitted landfill.

0. Concrete and Excavated soils that have been determined by the pre-contract laboratory analysis to be “clean” shall be managed by disposing in an off-post Class I, II, III, IV or V permitted landfill.

0. Wood that is recyclable shall be managed by disposing in an Class I, II, III, IV or V permitted landfill.

0. All solid waste other than clean concrete, asphalt, excavated soil, and wood shall be sent to permitted facilities.

24. All hazardous wastes such as sandblast media, chlorinated solvents, paints and paint thinners, and fuels will be labeled and an inventory management system initiated to ensure timely removal and proper disposal. There shall be no on-post disposal allowed, including use of drains (sanitary, storm, or industrial) or the ground. The contractor is responsible for properly collecting and disposing contractor generated hazardous waste. Contractor shall include waste handling and disposal costs in their budget because exceptions are not guaranteed.

1. All drums/containers must be labeled with a hazardous waste label. The proper DOT shipping name, UN numbers, EPA waste number, generator information, and accumulation start date on the label must be filled out. The label must be placed in the upper third of the drum/container. Drums/containers shall be kept closed except when adding waste. Hazardous waste drums must be stored in an area authorized by the COR.

1. All drums used to store hazardous waste must be non-leaking and safe to handle. Drums that are rusty, dented, or leaking should be over-packed. Drums and/or over-packs must be purchased by the Contractor. All drums purchased by the Contractor must be DOT approved for containing Hazardous Waste which may include the following specification numbers 5B, 17E or 17H. The specification numbers are stamped on the bottom of the drum. The contractor shall be responsible to see that proper containers are used. All hazardous waste sites upon the date of receiving hazardous waste must be inspected weekly. Hazardous waste containers can only be stored for 90 days after the accumulation start date

24. Storage of oils, greases, chemicals, or other liquids will require a fully contained facility for spill prevention and security. A minimum of 40 pounds (18 kg) of absorbent material per 44 gallons (167 liters) of chemical/oil/grease will be on hand for spill control. POL storage larger than 55 gallons requires secondary containment. This may be accomplished by a double-walled container or by a catch basin. Siting of this will be approved by the COR.

24. All spills shall be reported by dialing 911 and giving information as to spill location, type of material and estimated quantity, and if the spill is contained. The Contractor will ensure appropriate personnel protective equipment (PPE) is available to take care of spill cleanup and handling of residue.

24. Spray painting shall utilize high-transfer efficiency equipment with low-volatile organic compound (low-VOC) paints or water base paints. The VOC content of low-VOC paint shall be 3.5 pounds per gallon or less for primers, topcoats, and specialty coatings--for clear coats, 4.3 pounds or less. If a low-VOC paint is not available for the application, a paint waiver shall be obtained from the COR. Uncontrolled spray painting with high-VOC paints shall not be performed.

24. Contractor sites will be maintained at all times. Damage due to erosion and control of fugitive dust will be the responsibility of the Contractor. An on-site review will be conducted by the Contracting Officer and the COR prior to use of any location for contractor setup. A follow-up program for site overview will be maintained by all parties. Release of the site by the Contractor will be accompanied by a final site review, at which time site deficiencies will be noted. The Contractor will have 14 calendar days to correct deficiencies. Final contract payment will be withheld pending completion of the deficiency list.

24. Universal and toxic wastes: Universal wastes include batteries, fluorescent tubes, other mercury containing bulbs, and mercury containing thermostats. Some of these items may be left in a building before demolition or remodeling. Toxic wastes include asbestos, lead based paint and PCBs. Asbestos and lead based paint will be abated before demolition or remodeling; however, older light fixtures may have ballasts which contain dielectric fluid with PCBs. All batteries (usually lead acid), fluorescent tubes, mercury containing bulbs, mercury containing thermostats, and older light ballasts with PCBs will be carefully collected in labeled containers in accordance with all applicable laws. Ideally these items will be recycled; however, disposal may be used when recycling costs are not reasonable. All recycling and disposal will be done in accordance with applicable laws.

24. Asbestos and Lead-Based Paint: The Contractor is cautioned that materials in and around this project may contain asbestos or be coated with Lead-Based Paint (LBP). The government will make every effort to locate and identify all Asbestos Containing Materials (ACM) and LBP prior to bidding; however, this is not always possible. These materials are often hidden and cannot be discovered until after demolition has begun. The failure of the government to identify all ACM and LBP in no way relieves the Contractor from Contractor’s legal obligation to comply with state and federal regulations regarding the handling of asbestos, lead, or LBP. If suspected asbestos containing materials or LBP surfaces are encountered, immediately cease work and notify the Contracting Officer and the project manager immediately. Do not conduct or continue with any work that will violate any DoD, local, state or federal regulations regarding asbestos, lead, or LBP. If suspected materials or surfaces have not been disturbed, secure and post signs in the area where the materials are located to ensure that they are not disturbed. If the suspected materials have already been disturbed, secure and post signs in the area where the material was originally located, any areas to which materials have been moved, and any containers that suspect materials may have been placed in. Take all necessary steps to ensure that materials are not further disturbed, moved, or disposed of until directed to do so by the Contracting Officer. Failure to notify the government promptly or failure to comply with state and federal regulations will be grounds for termination of their contract and may result in other appropriate civil and/or criminal actions. "The Contractor will be fully responsible for any and all fines or other penalties resulting from his acts and /or omissions pursuant to law and regulation. At the Pre-Construction Conference, the contractor will be required to sign the "Contractor's Notification of Hazardous Materials Requirements" at the end of this Section. The government will perform asbestos and lead-based paint surveys for every renovation and demolition project. These surveys shall be posted on site prior to starting any work and must be maintained on site until the project has been completed.

24. Standards for Demolition and Renovation: For demolition and renovation the contractor shall comply with 40 CFR 61.145 and the Utah Administrative Code R307-801. The contractor shall complete the applicable Utah Division of Air Quality notification form with the assistance of the COR. The contractor shall submit the applicable form to the State with a copy sent to the COR. Forms are available at the web site www.eq.state.ut.us/eqair/haps/asbestos/forms.htm.

24. All tanks used for fuel storage must have spill containment for 110% of stored fuel. Any tanks needed for chemicals, oils, and other liquids must have spill containment for 110% of stored product.

24. If at anytime, an authorized inspector for the COR feels that regulatory requirements listed above are not being followed, the COR reserves the right to notify the Contracting Officer and recommend corrective action.

24. Banned Ozone Depleting Substances (ODS): Heating, Ventilating and Air Conditioning equipment which use chlorofluorocarbon (CFC) refrigerants are strictly prohibited. This includes but is not limited to R-11, R-12, R-13, R111, R-112, R-113, R-114, R-115, R-211, R-212, R-213, R-214, R-215, R-216 and R-217. Fire protection systems using Halon 1211, 1301 or 2402 are also prohibited. Other substances banned from use on the work site include carbon tetrachloride, methyl chloroform and methyl bromide.

24. Storm Water Permitting:

1. Contractors shall obtain a Utah Pollutant Discharge Elimination System (UPDES) stormwater permit for all projects that disturb one (1) acre or larger of soil surface area. Construction projects which disturb less than one (1) acre but are part of a larger common plan of development greater than one acre must obtain coverage under the permit. To obtain the permit the contractor must submit a Notice of Intent (NOI), and the required fee to the State of Utah, Department of Environmental Quality, Division of Water Quality. (Application may be made on-line at https://secure.utah.gov/stormwater/main.html). Contractor shall submit and receive approval of the UPDES permit before starting construction.

24. All items of geological or archeological interest such as fossils, articles of value or antiquity and structures or other remains or relics discovered during excavation or surface work are and will remain the property of the Army. Upon discovery of an artifact (historic or pre-historic in nature) or human remains, all work shall cease and the cultural resource officer in the Environmental Management Division shall be notified through the COR. Work will only continue when the Contractor is given the go ahead by the cultural resources officer through the COR. The Contractor shall take all reasonable precautions to prevent unauthorized removal of or damage to any such discovery.

24. Fugitive Dust Control: The contractor shall comply with all applicable local, state, and federal regulations pertaining to environmental and workplace management and protection. In the event of a conflict between any laws or regulations, the most stringent shall apply. These items include, but are not limited, to the following:

1.All contractors engaged in construction and demolition projects located at U.S. Army Dugway Proving Ground shall document all measures used to control fugitive dust from construction and demolition activities.
2.All contractors shall submit a project submittal transferring all records documenting measures to control fugitive dust control from construction and demolition activities. These records will be maintained on file at the facility for a period of five years.
QSanitary and Industrial Waste Water:

0. Some types of waste are prohibited from entering any drain. Contractor shall get permission before dumping any waste down a drain. Permission must be obtained from the government project manager in all cases and from post waste water managers when appropriate.

0. All drains (storm, sanitary and industrial) shall be protected from accepting spilled materials during the entire project.

3. Floors shall be cleaned by sweeping, not washing.

0. CONTRACTOR POST IDENTIFICATION CREDENTIALS

A. The procedure for obtaining post identification passes for contractor personnel to work on any U.S. Army Post shall be as follows:

0. The Contractor shall submit a written request on company letterhead stationary, if available, to the Contracting Officer specifying:

0. Contract number.

0. Location of work site:

0. Date entry to the post must begin and contemplated termination date of entry.

0. Names of contractor and subcontractor employee requiring access to the post. Names shall be as listed on valid photo identification (i.e., driver’s license).

0. The name of the individual who will submit the Request of Identification Credentials for each employee for whom identification credentials are needed.

0. The Contracting Officer will:

1. Endorse the request.

1. Attach a copy of the contract cover page and any other pages that provide performance information, such as the need for and duration of access to the work site.

1. Forward this request to the Security Forces, Pass and Registration Office of the installation where the work is to be performed.

1. Provide blank Application For Identification Card

0. The Prime Contractor shall be required to complete and submit forms, for each of the firm's employees and for each subcontractor employee who must have access to the installation.

0. The Prime Contractor shall also obtain vehicle decals. To obtain the vehicle decal from the Security Forces, Pass and Registration Office, the Contractor shall produce:

3. A valid drivers license.

3. Proof of financial responsibility or insurance, which meets the minimum requirements of the contract clause, entitled "Required Insurance."

3. Current vehicle registration.

3. Proof of Tooele County emissions certification if the vehicle is not registered in a county within the State of Utah, which requires emissions testing.

0. U.S. Government contracts will be allowed to hire non U.S. citizens to work or visit Dugway Proving Ground during the duration of the contract under the following condition:

a.A list of foreign national employees must be provided to the Contracting Office at least thirty (30) working days prior to arrival on post. The list will contain name, nationality, green card "A" numbers, social security number, date of birth, place of birth, drivers license number and state where issued.
b.The Contractor will also list the date(s) foreign nationals will be on post.
c.If a sensitive test or visit is scheduled during the dates provided, the Contracting Office will inform the Contractor whether the work/visit may take place.
d.Contracting Office will forward the list to the Counterintelligence and Law Enforcement and Security Offices for verification.
e.Employees will not be allowed on Post until verification process is complete.
f.Once verification has been received, the Contractor is responsible to provide the Protocol Office the following information for badge preparation:
1)Name,
2)Company and
3)Point of Contact (POC).
g.The Contractor is responsible to pick-up the badges and holders, issue them to the visitor and return them at the end of the visit. .

1. Contractor employees, at all times while on a military installation, shall wear visible contractor-provided identification either as a part of, or attached to, their outer clothing. The identification shall clearly identify the individual as being a contractor employee. The Contractor’s personnel shall present a neat appearance and be easily recognized as Contractor employees. All Contractor employees shall be easily identified as a Contractor while performing work for the Government under the scope of this contract. The Contractor’s identification shall include the Contractor’s company name and the employee’s name and be easily visible at all times. Contractor workspace (office, laboratory, and desk) shall be clearly identified. Contractor employees shall initially identify themselves by name and company affiliation when answering the telephone, presenting briefings, conducting or attending meetings/seminars. All contractor correspondence (written, facsimile, and email display) shall include the company name

1. Contractor personnel requiring access to controlled areas may be required to:

a.Report to the Health Clinic to establish a cholinesterase baseline (periodic blood tests may be required),
b.Clear through the Security Office for badges and the Safety Office for a briefing,
c.Be issued and have access to a protective mask during work in those areas.

1. The Contractor shall comply with OPSEC requirements and perform in such a manner to insure the protection of classified and unclassified sensitive information. OPSEC defines requirements in the handling of unclassified sensitive information, and provides clarification on the definition of unclassified sensitive information and provides definitive inter-working relationship in the execution of information security. The Contractor will be provided a listing of the critical information during the post-award conference.

1. During performance of the contract, the Contractor shall be responsible for obtaining required identification for newly assigned personnel, and for prompt return of credentials and vehicle registration decals to the Security Forces, Pass and Registration Office, for any employee who no longer requires access to the work site.

1. At the termination or completion of the contract, or upon the expiration of credentials (if any such expirations are specified), the Contractor must be sure that all post identification credentials and vehicle registration decals for all contractor and subcontractor employees are returned to the Security Forces, Pass and Registration Office. The Prime Contractor shall obtain a clearance certification from the issuing Pass and Registration Office which states that all post identification credentials and vehicle decals have been returned or "accounted for." This certification shall be provided to the Contracting Officer.

PART 2PRODUCTSNot Used
PART 3EXECUTIONNot Used

END OF SECTION

GENERAL REQUIREMENTS Page 17