A-601_Add02.pdf

PDF 206 KB Posted

Attached to
F-35 Alter Hangar 406 Federal contract opportunity
Solicitation number
W50S9F-21-B-0001
Issued by
Department of the Army National Guard

About this file

This solicitation package includes plans and specifications for alterations to an F-35 aircraft hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project scope involves demolishing approximately 20,000 square feet of existing hangar shop space and reconfiguring the area for F-35 aircraft maintenance operations, including lavatories, offices, break rooms, and repair shops for wheel and tire, welding, egress, and structural work. An additional 20,000 square feet of hangar space will be modified to accommodate F-35 aircraft, including HEF fire suppression system modifications, aircraft make-up power and air systems, and lightning protection. Mechanical, plumbing, electrical, and communications systems work is included. The solicitation will result in a single construction contract, with two optional items, and has a period of performance of 365 days from notice to proceed. The pre-bid conference is scheduled for February 16, 2021, and bids are due by March 8, 2021. The NAICS code is 236220 and size standard is $39.5 million. The project value is estimated between $10-25 million.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
Abstract of Offers with Hubzone Preference.pdf PDF
SF1419 Abstract of Offers - No Hubzone Preference.pdf PDF
W50S9F21B00010007.pdf PDF
W50S9F21B00010006.pdf PDF
406 Questions and Answers_142-143.pdf PDF
23 07 00_Add04.pdf PDF
406 Questions and Answers_113-141.pdf PDF
F-102_Add03.pdf PDF
T-001 Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
F-001_Add03.pdf PDF
W50S9F21B00010004.pdf PDF
C-141_Add02.pdf PDF
G-011_Add02.pdf PDF
AD101_Add02.pdf PDF
C-101_Add02.pdf PDF
E-501_Add02.pdf PDF
SD111_Add02.pdf PDF
A-201_Add02.pdf PDF
10 28 13_Add02.pdf PDF
A-311_Add02.pdf PDF
406 Questions and Answers_26-112.pdf PDF
G-001_Add02.pdf PDF
E-101_Add02.pdf PDF
01 50 00_Add02.pdf PDF
12 21 00_Add02.pdf PDF
10 14 00.20_Add02.pdf PDF
05 40 00_Add02.pdf PDF
01 78 00_Add02.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
W50S9F21B00010003.pdf PDF
10 22 39_Add01.R1.pdf PDF
A-131_Add01.R1.pdf PDF
C-121_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 22Feb21.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
W50S9F21B00010001.pdf PDF
W50S9F-21-B-0001.pdf PDF
ATTACHMENT 6-Justification and Approval Monaco.pdf PDF
ATTACHMENT 8-406 Submittal Log.xlsx XLSX spreadsheet
ATTACHMENT 9-SFS Form 12.xls XLS spreadsheet
ATTACHMENT 10-PRE-BID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F

SCHED.

SEE

S E

E S

C H

E D

DOOR TYPES

HG

S E

E S

C H

E D

SCHED.

SEE

8" 1'-8" 8"

N

SCHED.

SEE

S E

E S

C H

E D

4" 8"

RC

OVERHEAD

ROLLING COILING

F1

S E

E S

C H

E D

2"

SCHED.

SEE 2"

FRAME TYPES

2"

SCHED.

SEE

2"

1'-0" 2"

GL-3

S E

E S

C H

E D

F3F2

S E

E S

C H

E D

2"

SCHED.

SEE 2" 2"

SCHED.

SEE

2"

1'-0" 2"

GL-3

S E

E S

C H

E D

F4

FIRST FLOOR

100'-0"

First Floor 100'-0"

2"EQ2"EQ2"

W3

10'-6"

GL-1

FULL ASSEMBLY

GL-1

KALWALLKALWALL

FIRST FLOOR

100'-0"

First Floor 100'-0"

2" 5'-0" 2" 5'-4"

W4

GL-1

FULL ASSEMBLY

KALWALL

MASONRY WALL

DOOR (SEE SCHEDULE)

DOOR FRAME

(GROUT SOLID)

(SEE SCHEDULE)

CONTINUOUS SEALANT

AND BACKER ROD

(BOTH SIDES)

D O

O R

O P

E N

IN

G

LINTEL (SEE STRUCTURAL)

EQ EQ

/4

DOOR (SEE SCHEDULE)

DOOR FRAME

(GROUT SOLID)

(SEE SCHEDULE)

CONTINUOUS SEALANT AND

BACKER ROD (BOTH SIDES)

CMU WALL

(PROVIDE BULLNOSE

AT EXPOSED CORNERS)

GROUT ADJACENT

CORE SOLID

(SEE STRUCTURAL)

JAMB ANCHORS

(3 PER JAMB)

DOOR OPENING

1/4"

E Q

E Q

5/8" 2" 5/8"

/8

DOOR FRAME

(SEE SCHEDULE)

GLAZING

(SEE SCHEDULE)

SILL OR FRAME

BELOW

DOOR

(SEE SCHEDULE)

FINISH AS SCHEDULED

MASONRY OR CONCRETE

LINTEL

(SEE STRUCTURAL)

CONTINUOUS SEALANT

AND BACKER ROD

(BOTH SIDES)

DOOR FRAME (GROUT

SOLID)

(SEE SCHEDULE)DOOR (SEE SCHEDULE)

WALL

EQEQ

/4

WALL CORE

DOOR

(SEE SCHEDULE)

DOOR FRAME

(GROUT SOLID)

(SEE SCHEDULE)

CONTINUOUS SEALANT

AND BACKER ROD

(BOTH SIDES)

CMU WALL

(PROVIDE BULLNOSE

AT EXPOSED CORNERS)

FURRING, INSULATION

AND GYPSUM BOARD (IF

SCHEDULED AND/OR

SHOWN ON PLAN)

GROUT ADJACENT

CORE SOLID

(SEE STRUCTURAL)

JAMB ANCHORS

(3 PER JAMB)

DOOR OPENING

W A

L L

1/4"

E Q

E Q

SEE PLAN FOR

PARTITION TYPE

CONTINUOUS SEALANT

(BOTH SIDES)

DOOR FRAME

(SEE SCHEDULE)

STEEL STUD DOUBLE

BOX HEADER

DOOR

(SEE SCHEDULE)

1/2" WALL 1/2"

JAMB

D O

O R

O P

E N

IN

G

O P

E N

IN

G

S

M

IN

/2

A T

F

IR

E R

A T

E D

/2

W

A L

L

/2

J A

M B

DOOR

(SEE SCHEDULE)

DOOR FRAME

(SEE SCHEDULE)

JAMB ANCHORS

(3 PER JAMB)

DOUBLE STUDS

SEE PLAN FOR

PARTITION TYPE

2" DOOR OPENING

CONTINUOUS SEALANT

OPENINGS

MIN. 1/2" AT

FIRE RATED

SLIDING DOOR

REF SCHEDULE

GWB RETURN

GWB CORNER BEAD

DOUBLE STEEL STUDS

GWB

1 1/2"

SLIDING DOOR

HARDWARE

SEE HARDWARE

SCHED.

SLIDING DOOR

SEE SCHED.

5/8" GWB

3 5/8" MTL STUDS

STEEL STUD DOUBLE

BOX HEADER

GWB CORNER BEAD

1" CLR

COILING DOOR

(SEE SCHEDULE)

COILING DOOR JAMB

AND MOUNT

WALL AS SCHEDULED

T.O. OPENING

AS SCHEDULED

OVERHEAD COILING

DOOR METAL HOOD

ENCLOSURE

ANCHOR OVERHEAD

COILING DOOR UNIT

TO CMU WALL PER

MANUFACTURER'S

REQUIREMENTS

OVERHEAD

COILING DOOR

(SEE SCHEDULE)

3/16" STEEL PLATE (PAINTED)

(SEE STRUCTURAL)

CONTINUOUS SEALANT

WALL AS

SCHEDULED

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

M&H NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.

Mead & Hunt, Inc.

2440 Deming Way

Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

/3

/2

:1

:1

P M

C R e v it L o c a l\

-1

.0

-A

-C e n tr a l-p jc

.r v t

T R

U A

X F

IE

L D

A N

G B

M A

D

IS

O N

W

I

F -3

A L T

E R

B U

IL

D

IN

G

A-601

ROOM FINISH

SCHEDULE, DOOR

AND HARDWARE

SCHEDULE, WINDOW

ELEVATIONS

XGFG182008ANG NO.:

3141300-190289.01

BAE

SZK

July 31, 2020

PJC

DOOR AND HARDWARE SCHEDULE

DOOR

NUMBER

DOOR FRAME MISCELLANEOUS

REMARKS

LEAF SIZE

TYPE MAT'L

GLAZING

TYPE FINISH TYPE MAT'L

DETAILS

FINISH LABEL

HDWR

SETQTY. WIDTH HEIGHT HEAD JAMB OTHER

100 - 160'-0" 25'-0" SC - Existing door - to receive new paint finishes to match

101A (1) 3'-0" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 2.0

101B (1) 4'-0" 8'-0" HG HM GL-2 PT F1 HM 6/A-601 7/A-601 PT 7.0

102A (1) 3'-0" 7'-0" HG HM GL-2 PT F2 HM 8/A-501 9/A-501 PT 1.0

102B (1) 4'-0" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 4.0

103 (1) 3'-0" 7'-0" N HM - PT F2 HM 6/A-601 7/A-601 - PT 6.0

104 (1) 3'-0" 7'-0" N HM - PT F2 HM 6/A-601 7/A-601 - PT 6.0

105 (2) 3'-8" 7'-0" F EX PT F2 HM 8/A-501 9/A-501 PT 2.1

106 (1) 3'-0" 7'-0" F WD - ST F2 HM 3/A-601 4/A-601 - PT 45 MIN 9.0

108 (1) 3'-0" 7'-0" F WD - ST F2 HM 3/A-601 4/A-601 - PT 60 MIN 6.1

109 (1) 3'-0" 7'-0" F HM - PT F2 HM 3/A-601 4/A-601 - PT 45 MIN 8.1

110A (1) 3'-4" 7'-0" HG HM GL-2 PT F2 HM 8/A-501 9/A-501 PT 1.0

110B (1) 3'-4" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 4.0

111 (1) 3'-0" 7'-0" F WD - ST F2 HM 3/A-601 4/A-601 - PT 45 MIN 9.0

112 (1) 3'-0" 7'-0" F HM PT F2 HM 8/A-501 9/A-501 PT 1.1

113A (1) 3'-0" 7'-0" HG HM GL-4 PT F1 6/A-601 7/A-601 7.0

113B (1) 3'-0" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 6.1

114 (1) 3'-0" 7'-0" SL WD ST - - 13/A-601 14/A-601 - - 12.0 Sliding Door at Storage Room

115 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0

116 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0

117 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0

118 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0

119 (1) 3'-0" 7'-0" HG WD GL-3 ST F4 HM 6/A-601 7/A-601 PT 45 MIN 6.1

120 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0

121A (1) 3'-0" 7'-0" F WD - ST F1 HM 8/A-601 9/A-601 PT 6.0

121B (1) 3'-0" 7'-0" F WD - ST F1 HM 6/A-601 7/A-601 PT 45 MIN 6.1

122 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0

123A (1) 3'-0" 7'-0" HG HM GL-2 PT F4 HM 8/A-501 9/A-501 PT 1.0

123B (1) 3'-0" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 4.0

124A (1) 3'-4" 7'-0" HG WD GL-2 ST F1 HM 6/A-601 7/A-601 PT 45 MIN 5.0

124B - 30'-4" 10'-0" - - - - - HM 1/A-502 - - PT 10.0

124C (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 1.0

126 (2) 3'-0" 7'-0" F EX PT EX PT - Existing door - to receive new paint finishes to match

127 (1) 3'-4" 7'-0" F WD GL-2 ST F1 HM 3/A-601 4/A-601 PT 60 MIN 8.1

128A (1) 3'-4" 7'-0" HG HM GL-4 PT F1 HM 3/A-601 4/A-601 PT 60 MIN 6.1

128B - 8'-0" 10'-0" RC - - - - HM 11A-601 12/A-601 PT 60 MIN 11.0

128C (2) 3'-4" 7'-0" F HM - PT F2 HM 8/A-501 9/A-501 PT 2.1

129 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 6.0

130A (1) 3'-0" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 1.0

130B (1) 3'-0" 7'-0" HG HM GL-4 PT F1 HM 3/A-601 4/A-601 PT 60 MIN 4.0

132 (1) 3'-4" 7'-0" F HM - PT F1 HM 8/A-501 9/A-501 PT 3.0

133 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 6.0

134 (1) 3'-4" 7'-0" F HM - PT F1 HM 8/A-501 9/A-501 PT 3.0

135 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 6.0

136 (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 3/A-601 4/A-601 PT 45 MIN 6.1

137A (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 2.0

137B - 12'-0" 10'-0" RC - - - - HM 11A-601 12/A-601 PT 10.0

137C (2) 4'-0" 7'-0" HG HM GL-4 - F2 HM 3/A-601 4/A-601 PT 60 MIN 6.2

137D (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 3/A-601 - PT 45 MIN 6.1

138B - 16'-0" 10'-0" RC - - - HM 17A-501 18/A-501 PT 10.0

138C (1) 3'-0" 7'-0" HG HM GL-2 PT F2 HM 8/A-501 9/A-501 PT 2.0

139A - 12'-0" 10'-0" RC - - - - HM 17A-501 18/A-501 PT 10.0

139B - 6'-0" 10'-0" RC - - HM 11A-601 12/A-601 PT 60 MIN 11.0

139C (2) 3'-0" 7'-0" F HM - PT F2 HM 3/A-601 4/A-601 PT 60 MIN 6.2

140A (1) 3'-0" 7'-0" HG HM GL-2 PT - HM 8/A-501 9/A-501 PT 1.0

140B (1) 3'-0" 7'-0" HG 60 MIN 4.0

141A (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 1.0

141B (1) 3'-6" 7'-0" HG HM GL-4 PT F1 HM 3/A-601 4/A-601 PT 120 MIN 6.1

142 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 120 MIN 6.0

143A - 10'-0" 10'-0" RC - - - - HM 11A-601 12/A-601 PT 10.0

143B - 8'-0" 11'-6" RC - - - - HM 11A-601 12/A-601 PT 120 MIN 11.0

143C (1) 3'-0" 7'-0" F HM - PT F2 HM 6/A-601 7/A-601 PT 120 MIN 4.0

143D - 12'-4" 10'-0" RC - - - - HM 17A-501 18/A-501 PT 10.0

DOOR AND HARDWARE SCHEDULE ABBREVIATIONS

DOOR/FRAME MATERIALS

EX = EXISTING

HM = HOLLOW METAL

WD = WOOD

FINISH

PT = PAINT

ST = STAIN

1/4" = 1'-0"2

WINDOW TYPE - W3

1/4" = 1'-0"1

WINDOW TYPE - W4

ROOM FINISH SCHEDULE

ROOM

NO. ROOM NAME FLOOR BASE

WALLS CEILING

REMARKSNORTH EAST SOUTH WEST MTL HEIGHT

100 COMPOSITE MAINTENANCE HANGAR BAY EM-1 - PT-1 PT-1 PT-1 PT-1 EX

101 VEST. EM-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

102 LOBBY SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"

103 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

104 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

105 MECHANICAL EX EX EX EX PT-1 EX EX -

106 WOMEN'S CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 9'-0"

107 WOMEN'S LOCKER CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 9'-0"

108 MOTHER'S ROOM RFT-1 RB-1 PT-1 PT-2 CT-2/PT-2 PT-1 ACT-1 9'-0"

109 JANITOR CT-1 CTB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

110 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

111 MEN'S CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 8'-10"

112 MEN'S LOCKER CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 9'-0"

113 HALLWAY CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

114 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

115 CMF LEAD CPT-1 RB-1 PT-2 PT-2 PT-1 PT-1 ACT-1 9'-0"

116 CHIEFS' OFFICE CPT-1 RB-1 PT-2 PT-1 PT-1 PT-2 ACT-1 11'-8"

117 EMF LEAD CPT-1 RB-1 PT-1 PT-2 PT-2 PT-1 ACT-1 9'-0"

118 CHIEFS' OFFICE CPT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 11'-8"

119 RECEPTION/ OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"/11'-8"

120 SQUADRON COMMANDER CPT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 11'-8"

121 FIRST SERGEANT CPT-1 RB-1 PT-2 PT-2 PT-1 PT-1 ACT-1 9'-0"

122 DEPUTY COMMANDER CPT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 11'-8"

123 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

124 BREAK ROOM RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"

125 TRAINING ROOM RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"

126 HEF ROOM SC-1 EX EX EX EX EX EX

127 MECHANICAL EX EX EX EX PT-1 EX EX -

128 WHEEL & TIRE WORKSHOP RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

129 W&T SUPERVISOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

130 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

131 HALL SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"

132 COMM SC-1 - PT-1 PT-1 PT-1 PT-1 EX

133 STRUCTURES SUPERVISOR SC-1 RB-1 PT-2 PT-1 PT-1 PT-2 ACT-1 9'-0"

134 ELECTRIC SC-1 - PT-1 PT-1 PT-1 PT-1 EX

135 METALS TECH SUPERVISOR SC-1 RB-1 PT-2 PT-2 PT-1 PT-1 ACT-1 9'-0"

136 METALS/ STRUCTURES WORK ROOM SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

137 STRUCTURES WORKSHOP SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

138 METAL TECH WORKSHOP SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

139 WELDING SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

140 VESTIBULE RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

141 EGRESS WORKSHOP RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

142 EGRESS SUPERVISOR RFT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 9'-0"

143 EGRESS STORAGE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX

144 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"

145 Room

ARCHITECTURAL FINISHES SCHEDULE

FINISH

NUMBER FINISH DESCRIPTION

PRODUCT DESCRIPTION

REMARKSMANUFACTURER MODEL NUMBER STYLE COLOR SIZE

ACT-1 ACOUSTIC CEILING PANEL - TYPE 1 - - BEVELED TEGULAR WHITE 24x24

ACT-2 ACOUSTIC CEILING PANEL - TYPE 2 - - WATERPROOF WHITE 24x24

CPT-1 CARPET - TYPE 1 - - TBD TBD 24x24

CPT-2 CARPET - TYPE 2 - - TBD TBD ENTRY CARPET

CT-1 CERAMIC TILE - TYPE 1 - - TBD DARK GRAY-TBD 12x12 USE GROUT 2 (GR-2)

CT-2 CERAMIC TILE - TYPE 2 - - TBD LIGHT GRAY-TBD 12x12 USE GROUT 1 (GR-1)

CT-3 CERAMIC TILE - TYPE 3 - - TBD LIGHT GRAY-TBD 6x12 USE GROUT 1 (GR-1)

CTB-1 CERAMIC TILE BASE - TYPE 1 - - TBD DARK GRAY-TBD 6x12 USE GROUT 2 (GR-2)

EF-1 EXISTING FLOORING - - - - - -

EM-1 EPOXY FLOORING - TYPE 1 - - - - - SEE SPECIFICATIONS

GR-1 GROUT COLOR - TYPE 1 - - - GRAY -

GR-2 GROUT COLOR - TYPE 2 - - - PEWTER -

PT-1 PAINT COLOR - TYPE 1 - - - OFF WHITE -

PT-2 PAINT COLOR - TYPE 2 - - - GREY -

PT-3 PAINT COLOR - TYPE 3 - - - DARK GREY -

PT-4 PAINT COLOR - TYPE 4 - - - DARK BRONZE - TO MATCH EXTERIOR METALS

RB-1 RUBBER WALL BASE - TYPE 1 - - TBD TBD 4"

RFT-1 RUBBER FLOOR TILE - TYPE 1 - - TBD TBD -

SC-1 SEALED CONCRETE - - - - SEE SPECIFICATIONS

SCS-1 SOLID SURFACE - TYPE 1 - - - TBD -

1 1/2" = 1'-0"3

INTERIOR DOOR HEAD

1 1/2" = 1'-0"4

INTERIOR DOOR JAMB

1 1/2" = 1'-0"10

INT SIDELIGHT JAMB

1 1/2" = 1'-0"6

HOLLOW METAL DOOR HEAD DETAIL

1 1/2" = 1'-0"7

HOLLOW METAL DOOR JAMB DETAIL

3" = 1'-0"8

INTERIOR DOOR HEAD DETAIL

3" = 1'-0"9

INTERIOR DOOR JAMB DETAIL

1 1/2" = 1'-0"14

SLIDING DOOR JAMB

1 1/2" = 1'-0"13

SLIDING DOOR HEAD

1 1/2" = 1'-0"12

COILING DOOR JAMB

1 1/2" = 1'-0"11

INTERIOR COILING DOOR HEAD

DOOR AND HARDWARE SCHEDULE GENERAL NOTES

1. SEE SPECIFICATION SECTION 087100 DOOR HARDWARE FOR COMPLETE

LIST OF HARDWARE TO BE PROVIDED FOR DOOR.

2. EXTERIOR DOORS AND FRAMES RECEIVING PAINT TO HAVE PT-4 FINISH ON

THE EXTERIOR AND PT-3 ON THE INTERIOR

3. INTERIOR DOORS AND FRAMES RECEIVING PAINT TO HAVE PT-3 FINISH

GENERAL NOTE: REFER TO FINISH PLAN, FINISHES SCHEDULE AND NOTES FOR PAINTS AND STAINS.

1. PREP ALL EXISTING AND/OR NEW WORK AREAS AS

REQUIRED TO ACCOMMODATE SCHEDULED FINISHES.

2. ALL INSTALLATION BASED ON MANUFACTURER'S

GUIDELINES, TYP.

3. FLOOR PREP BY INSTALLER FOR FLUSH

TRANSITIONS.

4. ALL GROUT TO BE EPOXY TYPE.

5. FLOOR LEVELING SHALL BE 1/8" TOLERANCE FOR

GENERAL FLOORING, GRINDING AND FILL.

6. GWB CONTROL JOINTS TO BE LOCATED A MAXIMUM

OF 30 FT. COORDINATE LOCATIONS WITH

GOVERNMENT

7. CONTRACTOR TO CAULK AROUND ALL WINDOW

FRAMES. CAULK TO MATCH DK BRONZE ALUMINUM

FRAME COLOR.

8. ALL WALLS PAINTED PT-1, U.N.O.

9. ALL PAINTED WALLS/CEILINGS SHALL BE PAINTED IN

EGGSHELL SHEEN, U.N.O. GYPSUM BOARD SUBSTRATE

SHALL HAVE LIGHT ORANGE PEEL TEXTURE.

10. ALL INTERIOR HM DOOR FRAMES AND HM DOORS

FINISH TO BE PAINTED PT-3.

11. ALL EXTERIOR HM DOORS AND FRAMES FINISH TO

BE PAINTED PT-4 DARK BRONZE TO MATCH EXTERIOR

FASCIA AND ALUMINUM WINDOW SYSTEMS. PAINT

SHALL BE CARRIED TO FRAME STOP, WHERE IT SHALL

MEET THE INTERIOR PAINT COLOR.

12. WOOD DOOR FINISH SHALL BE PLAIN SLICED RED

OAK, BOOK GRAIN W/ ALGOMA TOAST OR EQUAL.

13. ALL METAL LINEAR DIFFUSERS, SHOP PRIMED

ACCESS PANELS, ELECTRICAL PANELS, EXPOSED

CONDUIT, MECH PIPING, AND SPRINKLER PIPING SHALL

BE PAINTED TO MATCH ADJACENT SURFACE, TYPICAL

U.N.O.

14. ALL EXPOSED MECHANICAL DUCTS SHALL BE

GALVANIZED METAL, TYPICAL.

15. ALL EXPOSED CONCRETE AND CMU NOT

SCHEDULED TO RECEIVE A FINISH SHALL BE SEALED,

U.N.O.

16. ALL COLUMNS SHALL RECEIVE PAINT, WITH COLOR

SIMILAR TO TYPICAL ROOM COLOR, AND RB-1, U.N.O.

17. ALL FLOORING TRANSITIONS SHALL BE CENTERED

UNDER DOOR IN CLOSED POSITION U.N.O.

18. VERIFY THAT ALL TRANSITION STRIP AND METAL

EDGE PRODUCTS COORDINATE WITH FLOOR FINISH

HEIGHTS PRIOR TO PROCUREMENT.

19. ALL PAINT TRANSITIONS ARE INTENDED TO MEET

INSIDE CORNERS, TYP. COORDINATE ANY

DISCREPANCIES WITH GOVERNMENT.

20. ALL EXPOSED CMU OUTSIDE CORNERS SHALL BE

BULLNOSE.

21. WHERE TILE TURNS CORNERS, ALIGN GROUT

LINES.

22. REFERENCE INTERIOR ELEVATIONS FOR

MOUNTING HEIGHTS.

23. REFERENCE A-121 FOR CEILING FINISH

COORDINATION.

24. WHERE WALLS REQUIRE PATCHING AND REPAIR,

REPAINT ENTIRE WALL SURFACE FROM CORNER TO

CORNER.

FINISHES GENERAL NOTES:

07/31/20 TYPE B3 FINAL

2 03/03/21 ADDENDUM - 02

Sheets
A-601 - ROOM FINISH SCHEDULE, DOOR AND HARDWARE SCHEDULE, WINDOW ELEVATIONS

File details come from the government source that posted it. Updated .