A-601_Add02.pdf
PDF 206 KB Posted
- Attached to
- F-35 Alter Hangar 406 Federal contract opportunity
- Solicitation number
- W50S9F-21-B-0001
- Issued by
- Department of the Army National Guard
About this file
This solicitation package includes plans and specifications for alterations to an F-35 aircraft hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project scope involves demolishing approximately 20,000 square feet of existing hangar shop space and reconfiguring the area for F-35 aircraft maintenance operations, including lavatories, offices, break rooms, and repair shops for wheel and tire, welding, egress, and structural work. An additional 20,000 square feet of hangar space will be modified to accommodate F-35 aircraft, including HEF fire suppression system modifications, aircraft make-up power and air systems, and lightning protection. Mechanical, plumbing, electrical, and communications systems work is included. The solicitation will result in a single construction contract, with two optional items, and has a period of performance of 365 days from notice to proceed. The pre-bid conference is scheduled for February 16, 2021, and bids are due by March 8, 2021. The NAICS code is 236220 and size standard is $39.5 million. The project value is estimated between $10-25 million.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 Alter Hangar 406 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
F
SCHED.
SEE
S E
E S
C H
E D
DOOR TYPES
HG
S E
E S
C H
E D
SCHED.
SEE
8" 1'-8" 8"
N
SCHED.
SEE
S E
E S
C H
E D
4" 8"
RC
OVERHEAD
ROLLING COILING
F1
S E
E S
C H
E D
2"
SCHED.
SEE 2"
FRAME TYPES
2"
SCHED.
SEE
2"
1'-0" 2"
GL-3
S E
E S
C H
E D
F3F2
S E
E S
C H
E D
2"
SCHED.
SEE 2" 2"
SCHED.
SEE
2"
1'-0" 2"
GL-3
S E
E S
C H
E D
F4
FIRST FLOOR
100'-0"
First Floor 100'-0"
2"EQ2"EQ2"
W3
10'-6"
GL-1
FULL ASSEMBLY
GL-1
KALWALLKALWALL
FIRST FLOOR
100'-0"
First Floor 100'-0"
2" 5'-0" 2" 5'-4"
W4
GL-1
FULL ASSEMBLY
KALWALL
MASONRY WALL
DOOR (SEE SCHEDULE)
DOOR FRAME
(GROUT SOLID)
(SEE SCHEDULE)
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
D O
O R
O P
E N
IN
G
LINTEL (SEE STRUCTURAL)
EQ EQ
/4
DOOR (SEE SCHEDULE)
DOOR FRAME
(GROUT SOLID)
(SEE SCHEDULE)
CONTINUOUS SEALANT AND
BACKER ROD (BOTH SIDES)
CMU WALL
(PROVIDE BULLNOSE
AT EXPOSED CORNERS)
GROUT ADJACENT
CORE SOLID
(SEE STRUCTURAL)
JAMB ANCHORS
(3 PER JAMB)
DOOR OPENING
1/4"
E Q
E Q
5/8" 2" 5/8"
/8
DOOR FRAME
(SEE SCHEDULE)
GLAZING
(SEE SCHEDULE)
SILL OR FRAME
BELOW
DOOR
(SEE SCHEDULE)
FINISH AS SCHEDULED
MASONRY OR CONCRETE
LINTEL
(SEE STRUCTURAL)
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
DOOR FRAME (GROUT
SOLID)
(SEE SCHEDULE)DOOR (SEE SCHEDULE)
WALL
EQEQ
/4
WALL CORE
DOOR
(SEE SCHEDULE)
DOOR FRAME
(GROUT SOLID)
(SEE SCHEDULE)
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
CMU WALL
(PROVIDE BULLNOSE
AT EXPOSED CORNERS)
FURRING, INSULATION
AND GYPSUM BOARD (IF
SCHEDULED AND/OR
SHOWN ON PLAN)
GROUT ADJACENT
CORE SOLID
(SEE STRUCTURAL)
JAMB ANCHORS
(3 PER JAMB)
DOOR OPENING
W A
L L
1/4"
E Q
E Q
SEE PLAN FOR
PARTITION TYPE
CONTINUOUS SEALANT
(BOTH SIDES)
DOOR FRAME
(SEE SCHEDULE)
STEEL STUD DOUBLE
BOX HEADER
DOOR
(SEE SCHEDULE)
1/2" WALL 1/2"
JAMB
D O
O R
O P
E N
IN
G
O P
E N
IN
G
S
M
IN
/2
A T
F
IR
E R
A T
E D
/2
W
A L
L
/2
J A
M B
DOOR
(SEE SCHEDULE)
DOOR FRAME
(SEE SCHEDULE)
JAMB ANCHORS
(3 PER JAMB)
DOUBLE STUDS
SEE PLAN FOR
PARTITION TYPE
2" DOOR OPENING
CONTINUOUS SEALANT
OPENINGS
MIN. 1/2" AT
FIRE RATED
SLIDING DOOR
REF SCHEDULE
GWB RETURN
GWB CORNER BEAD
DOUBLE STEEL STUDS
GWB
1 1/2"
SLIDING DOOR
HARDWARE
SEE HARDWARE
SCHED.
SLIDING DOOR
SEE SCHED.
5/8" GWB
3 5/8" MTL STUDS
STEEL STUD DOUBLE
BOX HEADER
GWB CORNER BEAD
1" CLR
COILING DOOR
(SEE SCHEDULE)
COILING DOOR JAMB
AND MOUNT
WALL AS SCHEDULED
T.O. OPENING
AS SCHEDULED
OVERHEAD COILING
DOOR METAL HOOD
ENCLOSURE
ANCHOR OVERHEAD
COILING DOOR UNIT
TO CMU WALL PER
MANUFACTURER'S
REQUIREMENTS
OVERHEAD
COILING DOOR
(SEE SCHEDULE)
3/16" STEEL PLATE (PAINTED)
(SEE STRUCTURAL)
CONTINUOUS SEALANT
WALL AS
SCHEDULED
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
/3
/2
:1
:1
P M
C R e v it L o c a l\
-1
.0
-A
-C e n tr a l-p jc
.r v t
T R
U A
X F
IE
L D
A N
G B
M A
D
IS
O N
W
I
F -3
A L T
E R
B U
IL
D
IN
G
A-601
ROOM FINISH
SCHEDULE, DOOR
AND HARDWARE
SCHEDULE, WINDOW
ELEVATIONS
XGFG182008ANG NO.:
3141300-190289.01
BAE
SZK
July 31, 2020
PJC
DOOR AND HARDWARE SCHEDULE
DOOR
NUMBER
DOOR FRAME MISCELLANEOUS
REMARKS
LEAF SIZE
TYPE MAT'L
GLAZING
TYPE FINISH TYPE MAT'L
DETAILS
FINISH LABEL
HDWR
SETQTY. WIDTH HEIGHT HEAD JAMB OTHER
100 - 160'-0" 25'-0" SC - Existing door - to receive new paint finishes to match
101A (1) 3'-0" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 2.0
101B (1) 4'-0" 8'-0" HG HM GL-2 PT F1 HM 6/A-601 7/A-601 PT 7.0
102A (1) 3'-0" 7'-0" HG HM GL-2 PT F2 HM 8/A-501 9/A-501 PT 1.0
102B (1) 4'-0" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 4.0
103 (1) 3'-0" 7'-0" N HM - PT F2 HM 6/A-601 7/A-601 - PT 6.0
104 (1) 3'-0" 7'-0" N HM - PT F2 HM 6/A-601 7/A-601 - PT 6.0
105 (2) 3'-8" 7'-0" F EX PT F2 HM 8/A-501 9/A-501 PT 2.1
106 (1) 3'-0" 7'-0" F WD - ST F2 HM 3/A-601 4/A-601 - PT 45 MIN 9.0
108 (1) 3'-0" 7'-0" F WD - ST F2 HM 3/A-601 4/A-601 - PT 60 MIN 6.1
109 (1) 3'-0" 7'-0" F HM - PT F2 HM 3/A-601 4/A-601 - PT 45 MIN 8.1
110A (1) 3'-4" 7'-0" HG HM GL-2 PT F2 HM 8/A-501 9/A-501 PT 1.0
110B (1) 3'-4" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 4.0
111 (1) 3'-0" 7'-0" F WD - ST F2 HM 3/A-601 4/A-601 - PT 45 MIN 9.0
112 (1) 3'-0" 7'-0" F HM PT F2 HM 8/A-501 9/A-501 PT 1.1
113A (1) 3'-0" 7'-0" HG HM GL-4 PT F1 6/A-601 7/A-601 7.0
113B (1) 3'-0" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 6.1
114 (1) 3'-0" 7'-0" SL WD ST - - 13/A-601 14/A-601 - - 12.0 Sliding Door at Storage Room
115 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0
116 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0
117 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0
118 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0
119 (1) 3'-0" 7'-0" HG WD GL-3 ST F4 HM 6/A-601 7/A-601 PT 45 MIN 6.1
120 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0
121A (1) 3'-0" 7'-0" F WD - ST F1 HM 8/A-601 9/A-601 PT 6.0
121B (1) 3'-0" 7'-0" F WD - ST F1 HM 6/A-601 7/A-601 PT 45 MIN 6.1
122 (1) 3'-0" 7'-0" F WD GL-3 ST F3 HM 8/A-601 9/A-601 10/A-601 PT 6.0
123A (1) 3'-0" 7'-0" HG HM GL-2 PT F4 HM 8/A-501 9/A-501 PT 1.0
123B (1) 3'-0" 7'-0" HG HM GL-4 PT F2 HM 6/A-601 7/A-601 PT 60 MIN 4.0
124A (1) 3'-4" 7'-0" HG WD GL-2 ST F1 HM 6/A-601 7/A-601 PT 45 MIN 5.0
124B - 30'-4" 10'-0" - - - - - HM 1/A-502 - - PT 10.0
124C (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 1.0
126 (2) 3'-0" 7'-0" F EX PT EX PT - Existing door - to receive new paint finishes to match
127 (1) 3'-4" 7'-0" F WD GL-2 ST F1 HM 3/A-601 4/A-601 PT 60 MIN 8.1
128A (1) 3'-4" 7'-0" HG HM GL-4 PT F1 HM 3/A-601 4/A-601 PT 60 MIN 6.1
128B - 8'-0" 10'-0" RC - - - - HM 11A-601 12/A-601 PT 60 MIN 11.0
128C (2) 3'-4" 7'-0" F HM - PT F2 HM 8/A-501 9/A-501 PT 2.1
129 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 6.0
130A (1) 3'-0" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 1.0
130B (1) 3'-0" 7'-0" HG HM GL-4 PT F1 HM 3/A-601 4/A-601 PT 60 MIN 4.0
132 (1) 3'-4" 7'-0" F HM - PT F1 HM 8/A-501 9/A-501 PT 3.0
133 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 6.0
134 (1) 3'-4" 7'-0" F HM - PT F1 HM 8/A-501 9/A-501 PT 3.0
135 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 6.0
136 (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 3/A-601 4/A-601 PT 45 MIN 6.1
137A (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 2.0
137B - 12'-0" 10'-0" RC - - - - HM 11A-601 12/A-601 PT 10.0
137C (2) 4'-0" 7'-0" HG HM GL-4 - F2 HM 3/A-601 4/A-601 PT 60 MIN 6.2
137D (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 3/A-601 - PT 45 MIN 6.1
138B - 16'-0" 10'-0" RC - - - HM 17A-501 18/A-501 PT 10.0
138C (1) 3'-0" 7'-0" HG HM GL-2 PT F2 HM 8/A-501 9/A-501 PT 2.0
139A - 12'-0" 10'-0" RC - - - - HM 17A-501 18/A-501 PT 10.0
139B - 6'-0" 10'-0" RC - - HM 11A-601 12/A-601 PT 60 MIN 11.0
139C (2) 3'-0" 7'-0" F HM - PT F2 HM 3/A-601 4/A-601 PT 60 MIN 6.2
140A (1) 3'-0" 7'-0" HG HM GL-2 PT - HM 8/A-501 9/A-501 PT 1.0
140B (1) 3'-0" 7'-0" HG 60 MIN 4.0
141A (1) 3'-4" 7'-0" HG HM GL-2 PT F1 HM 8/A-501 9/A-501 PT 1.0
141B (1) 3'-6" 7'-0" HG HM GL-4 PT F1 HM 3/A-601 4/A-601 PT 120 MIN 6.1
142 (1) 3'-0" 7'-0" N HM GL-3 PT F4 HM 3/A-601 4/A-601 10/A-601 PT 120 MIN 6.0
143A - 10'-0" 10'-0" RC - - - - HM 11A-601 12/A-601 PT 10.0
143B - 8'-0" 11'-6" RC - - - - HM 11A-601 12/A-601 PT 120 MIN 11.0
143C (1) 3'-0" 7'-0" F HM - PT F2 HM 6/A-601 7/A-601 PT 120 MIN 4.0
143D - 12'-4" 10'-0" RC - - - - HM 17A-501 18/A-501 PT 10.0
DOOR AND HARDWARE SCHEDULE ABBREVIATIONS
DOOR/FRAME MATERIALS
EX = EXISTING
HM = HOLLOW METAL
WD = WOOD
FINISH
PT = PAINT
ST = STAIN
1/4" = 1'-0"2
WINDOW TYPE - W3
1/4" = 1'-0"1
WINDOW TYPE - W4
ROOM FINISH SCHEDULE
ROOM
NO. ROOM NAME FLOOR BASE
WALLS CEILING
REMARKSNORTH EAST SOUTH WEST MTL HEIGHT
100 COMPOSITE MAINTENANCE HANGAR BAY EM-1 - PT-1 PT-1 PT-1 PT-1 EX
101 VEST. EM-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
102 LOBBY SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"
103 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
104 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
105 MECHANICAL EX EX EX EX PT-1 EX EX -
106 WOMEN'S CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 9'-0"
107 WOMEN'S LOCKER CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 9'-0"
108 MOTHER'S ROOM RFT-1 RB-1 PT-1 PT-2 CT-2/PT-2 PT-1 ACT-1 9'-0"
109 JANITOR CT-1 CTB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
110 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
111 MEN'S CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 8'-10"
112 MEN'S LOCKER CT-1 CTB-1 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 CT-2/CT-3 ACT2/GWB 9'-0"
113 HALLWAY CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
114 STORAGE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
115 CMF LEAD CPT-1 RB-1 PT-2 PT-2 PT-1 PT-1 ACT-1 9'-0"
116 CHIEFS' OFFICE CPT-1 RB-1 PT-2 PT-1 PT-1 PT-2 ACT-1 11'-8"
117 EMF LEAD CPT-1 RB-1 PT-1 PT-2 PT-2 PT-1 ACT-1 9'-0"
118 CHIEFS' OFFICE CPT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 11'-8"
119 RECEPTION/ OPEN OFFICE CPT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"/11'-8"
120 SQUADRON COMMANDER CPT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 11'-8"
121 FIRST SERGEANT CPT-1 RB-1 PT-2 PT-2 PT-1 PT-1 ACT-1 9'-0"
122 DEPUTY COMMANDER CPT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 11'-8"
123 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
124 BREAK ROOM RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"
125 TRAINING ROOM RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"
126 HEF ROOM SC-1 EX EX EX EX EX EX
127 MECHANICAL EX EX EX EX PT-1 EX EX -
128 WHEEL & TIRE WORKSHOP RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
129 W&T SUPERVISOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
130 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
131 HALL SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 11'-8"
132 COMM SC-1 - PT-1 PT-1 PT-1 PT-1 EX
133 STRUCTURES SUPERVISOR SC-1 RB-1 PT-2 PT-1 PT-1 PT-2 ACT-1 9'-0"
134 ELECTRIC SC-1 - PT-1 PT-1 PT-1 PT-1 EX
135 METALS TECH SUPERVISOR SC-1 RB-1 PT-2 PT-2 PT-1 PT-1 ACT-1 9'-0"
136 METALS/ STRUCTURES WORK ROOM SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
137 STRUCTURES WORKSHOP SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
138 METAL TECH WORKSHOP SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
139 WELDING SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
140 VESTIBULE RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
141 EGRESS WORKSHOP RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
142 EGRESS SUPERVISOR RFT-1 RB-1 PT-1 PT-1 PT-2 PT-2 ACT-1 9'-0"
143 EGRESS STORAGE SC-1 RB-1 PT-1 PT-1 PT-1 PT-1 EX
144 CORRIDOR RFT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACT-1 9'-0"
145 Room
ARCHITECTURAL FINISHES SCHEDULE
FINISH
NUMBER FINISH DESCRIPTION
PRODUCT DESCRIPTION
REMARKSMANUFACTURER MODEL NUMBER STYLE COLOR SIZE
ACT-1 ACOUSTIC CEILING PANEL - TYPE 1 - - BEVELED TEGULAR WHITE 24x24
ACT-2 ACOUSTIC CEILING PANEL - TYPE 2 - - WATERPROOF WHITE 24x24
CPT-1 CARPET - TYPE 1 - - TBD TBD 24x24
CPT-2 CARPET - TYPE 2 - - TBD TBD ENTRY CARPET
CT-1 CERAMIC TILE - TYPE 1 - - TBD DARK GRAY-TBD 12x12 USE GROUT 2 (GR-2)
CT-2 CERAMIC TILE - TYPE 2 - - TBD LIGHT GRAY-TBD 12x12 USE GROUT 1 (GR-1)
CT-3 CERAMIC TILE - TYPE 3 - - TBD LIGHT GRAY-TBD 6x12 USE GROUT 1 (GR-1)
CTB-1 CERAMIC TILE BASE - TYPE 1 - - TBD DARK GRAY-TBD 6x12 USE GROUT 2 (GR-2)
EF-1 EXISTING FLOORING - - - - - -
EM-1 EPOXY FLOORING - TYPE 1 - - - - - SEE SPECIFICATIONS
GR-1 GROUT COLOR - TYPE 1 - - - GRAY -
GR-2 GROUT COLOR - TYPE 2 - - - PEWTER -
PT-1 PAINT COLOR - TYPE 1 - - - OFF WHITE -
PT-2 PAINT COLOR - TYPE 2 - - - GREY -
PT-3 PAINT COLOR - TYPE 3 - - - DARK GREY -
PT-4 PAINT COLOR - TYPE 4 - - - DARK BRONZE - TO MATCH EXTERIOR METALS
RB-1 RUBBER WALL BASE - TYPE 1 - - TBD TBD 4"
RFT-1 RUBBER FLOOR TILE - TYPE 1 - - TBD TBD -
SC-1 SEALED CONCRETE - - - - SEE SPECIFICATIONS
SCS-1 SOLID SURFACE - TYPE 1 - - - TBD -
1 1/2" = 1'-0"3
INTERIOR DOOR HEAD
1 1/2" = 1'-0"4
INTERIOR DOOR JAMB
1 1/2" = 1'-0"10
INT SIDELIGHT JAMB
1 1/2" = 1'-0"6
HOLLOW METAL DOOR HEAD DETAIL
1 1/2" = 1'-0"7
HOLLOW METAL DOOR JAMB DETAIL
3" = 1'-0"8
INTERIOR DOOR HEAD DETAIL
3" = 1'-0"9
INTERIOR DOOR JAMB DETAIL
1 1/2" = 1'-0"14
SLIDING DOOR JAMB
1 1/2" = 1'-0"13
SLIDING DOOR HEAD
1 1/2" = 1'-0"12
COILING DOOR JAMB
1 1/2" = 1'-0"11
INTERIOR COILING DOOR HEAD
DOOR AND HARDWARE SCHEDULE GENERAL NOTES
1. SEE SPECIFICATION SECTION 087100 DOOR HARDWARE FOR COMPLETE
LIST OF HARDWARE TO BE PROVIDED FOR DOOR.
2. EXTERIOR DOORS AND FRAMES RECEIVING PAINT TO HAVE PT-4 FINISH ON
THE EXTERIOR AND PT-3 ON THE INTERIOR
3. INTERIOR DOORS AND FRAMES RECEIVING PAINT TO HAVE PT-3 FINISH
GENERAL NOTE: REFER TO FINISH PLAN, FINISHES SCHEDULE AND NOTES FOR PAINTS AND STAINS.
1. PREP ALL EXISTING AND/OR NEW WORK AREAS AS
REQUIRED TO ACCOMMODATE SCHEDULED FINISHES.
2. ALL INSTALLATION BASED ON MANUFACTURER'S
GUIDELINES, TYP.
3. FLOOR PREP BY INSTALLER FOR FLUSH
TRANSITIONS.
4. ALL GROUT TO BE EPOXY TYPE.
5. FLOOR LEVELING SHALL BE 1/8" TOLERANCE FOR
GENERAL FLOORING, GRINDING AND FILL.
6. GWB CONTROL JOINTS TO BE LOCATED A MAXIMUM
OF 30 FT. COORDINATE LOCATIONS WITH
GOVERNMENT
7. CONTRACTOR TO CAULK AROUND ALL WINDOW
FRAMES. CAULK TO MATCH DK BRONZE ALUMINUM
FRAME COLOR.
8. ALL WALLS PAINTED PT-1, U.N.O.
9. ALL PAINTED WALLS/CEILINGS SHALL BE PAINTED IN
EGGSHELL SHEEN, U.N.O. GYPSUM BOARD SUBSTRATE
SHALL HAVE LIGHT ORANGE PEEL TEXTURE.
10. ALL INTERIOR HM DOOR FRAMES AND HM DOORS
FINISH TO BE PAINTED PT-3.
11. ALL EXTERIOR HM DOORS AND FRAMES FINISH TO
BE PAINTED PT-4 DARK BRONZE TO MATCH EXTERIOR
FASCIA AND ALUMINUM WINDOW SYSTEMS. PAINT
SHALL BE CARRIED TO FRAME STOP, WHERE IT SHALL
MEET THE INTERIOR PAINT COLOR.
12. WOOD DOOR FINISH SHALL BE PLAIN SLICED RED
OAK, BOOK GRAIN W/ ALGOMA TOAST OR EQUAL.
13. ALL METAL LINEAR DIFFUSERS, SHOP PRIMED
ACCESS PANELS, ELECTRICAL PANELS, EXPOSED
CONDUIT, MECH PIPING, AND SPRINKLER PIPING SHALL
BE PAINTED TO MATCH ADJACENT SURFACE, TYPICAL
U.N.O.
14. ALL EXPOSED MECHANICAL DUCTS SHALL BE
GALVANIZED METAL, TYPICAL.
15. ALL EXPOSED CONCRETE AND CMU NOT
SCHEDULED TO RECEIVE A FINISH SHALL BE SEALED,
U.N.O.
16. ALL COLUMNS SHALL RECEIVE PAINT, WITH COLOR
SIMILAR TO TYPICAL ROOM COLOR, AND RB-1, U.N.O.
17. ALL FLOORING TRANSITIONS SHALL BE CENTERED
UNDER DOOR IN CLOSED POSITION U.N.O.
18. VERIFY THAT ALL TRANSITION STRIP AND METAL
EDGE PRODUCTS COORDINATE WITH FLOOR FINISH
HEIGHTS PRIOR TO PROCUREMENT.
19. ALL PAINT TRANSITIONS ARE INTENDED TO MEET
INSIDE CORNERS, TYP. COORDINATE ANY
DISCREPANCIES WITH GOVERNMENT.
20. ALL EXPOSED CMU OUTSIDE CORNERS SHALL BE
BULLNOSE.
21. WHERE TILE TURNS CORNERS, ALIGN GROUT
LINES.
22. REFERENCE INTERIOR ELEVATIONS FOR
MOUNTING HEIGHTS.
23. REFERENCE A-121 FOR CEILING FINISH
COORDINATION.
24. WHERE WALLS REQUIRE PATCHING AND REPAIR,
REPAINT ENTIRE WALL SURFACE FROM CORNER TO
CORNER.
FINISHES GENERAL NOTES:
07/31/20 TYPE B3 FINAL
2 03/03/21 ADDENDUM - 02
| Sheets |
| A-601 - ROOM FINISH SCHEDULE, DOOR AND HARDWARE SCHEDULE, WINDOW ELEVATIONS |
File details come from the government source that posted it. Updated .