This solicitation seeks proposals for alteration services to an F-35 aircraft hangar. Work includes demolishing 19,913 square feet of hangar shop space to configure areas for F-35 maintenance like wheel and tire repair, welding, egress, and structural shops. An additional 19,803 square feet of hangar space will be modified to accommodate F-35 aircraft, including fire suppression, aircraft power and air systems, and lightning protection. Mechanical, plumbing, electrical, and technology system work is required. Deviations must be approved by the Air Force and Lockheed Martin. Asbestos removal may also be required. Communications and security system installation is included.

The solicitation will result in a single contract for demolition and new construction. There are two options for a stormwater storage trench and slab. The pre-bid conference is February 16, 2021 with site visit. Bids are due March 8, 2021. The contract duration is 365 days. The estimated value is between $10-25 million. The solicitation and documents are available at beta.SAM.gov. Award will be to the responsive and responsible lowest bidder.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
SF1419 Abstract of Offers - No Hubzone Preference.pdf PDF
Abstract of Offers with Hubzone Preference.pdf PDF
W50S9F21B00010007.pdf PDF
406 Questions and Answers_142-143.pdf PDF
23 07 00_Add04.pdf PDF
W50S9F21B00010006.pdf PDF
F-001_Add03.pdf PDF
406 Questions and Answers_113-141.pdf PDF
F-102_Add03.pdf PDF
T-001 Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
406 Questions and Answers_26-112.pdf PDF
G-001_Add02.pdf PDF
E-101_Add02.pdf PDF
01 50 00_Add02.pdf PDF
12 21 00_Add02.pdf PDF
10 14 00.20_Add02.pdf PDF
05 40 00_Add02.pdf PDF
01 78 00_Add02.pdf PDF
W50S9F21B00010004.pdf PDF
C-141_Add02.pdf PDF
G-011_Add02.pdf PDF
AD101_Add02.pdf PDF
C-101_Add02.pdf PDF
E-501_Add02.pdf PDF
SD111_Add02.pdf PDF
A-201_Add02.pdf PDF
10 28 13_Add02.pdf PDF
A-311_Add02.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
A-131_Add01.R1.pdf PDF
C-121_Add01.R1.pdf PDF
W50S9F21B00010003.pdf PDF
10 22 39_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 22Feb21.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
W50S9F21B00010001.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
W50S9F-21-B-0001.pdf PDF
ATTACHMENT 6-Justification and Approval Monaco.pdf PDF
ATTACHMENT 8-406 Submittal Log.xlsx XLSX spreadsheet
ATTACHMENT 9-SFS Form 12.xls XLS spreadsheet
ATTACHMENT 10-PRE-BID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F.E. F.E.F.E.

F .E

F .E

F.E.

F.E.

F.E.

F.E.

F.E.

F.E.

F.E.

F.E.

F.E.

F.E.

UPUP

UPUP

W O

R K

B E

N C

H

T

IR

E R

A C

K

PARTS

CLEANER

H A

Z

L o c k e r

S T

O R

A G

E

CAGE

T o o l

B o x

T o o l

B o x

BEAD

BREAK

SOLVENT

TANK

NITROGEN

TRAILER

CANOPY STAND

WORK AREA

SEAT

WORK

AREA

CANOPY

STORAGEEXPLOSIVE

STORAGE

T O

O L S

T O

R A

G E

Tungsten Pedestal Grinder

Tube Bender

Slip Roller

Weld Table

Miller Tig Welder

Lincoln Mig Welder (large)

Miller Plasma Cutter

L u c if e r

H e a t

T re a ti n g

O v e n

S c o tc h m a

Ir

W rk e r

Miller Mig Welder (small)

Ellis Drill Press

Brilliant Cut Off Saw

B a r

S to c k

M e ta l R a c k

Drill Bit Pedestal Sharpener

Belt Sander

Blaster Booth Cabinet

H y d ra u lic

P re s s

Band Saw

H A

A S

C N

C

IL

L

Sunnen Hone Machine

B ri d g e p rt n u a l M ill

S ta n d rd d e rn th e

B ri d g e p rt th e

Well saw Band Saw

O m a x C

N C

W a te rj e t

ACCU Shear

Large Work Bench

Tube Flare

Stanley Pedestal Grinder

P u n c h c h in e

Small Shear

Brake

B e n c h T o p B re a k

P re s s B a r

F o ld e r

Spot Weld, Hand Shear, Shrink/Stretch Machine

H c k e r

CANOPY

STORAGE

S T

O R

A G

E

HAZ

LKR

Quench Tank

Work Bench

Work Bench

AC Torch

T O

O L S

T O

R A

G E

H c k e r

T o o l

B o x

T o o l

B o x

T o o l

B o x

T o o l

B o x

Tool Box

T o o l

B o x

T o o l

B o x

T o o l

B o x

Scrap

Scrap

T O

O L S

T O

R A

G E

WELDING

EGRESS

WORKSHOP

EGRESS

SUPERVISOR

VESTIBULE

STRUCTURES

WORKSHOP

COMM ELECTRIC

STRUCTURES

SUPERVISOR

METALS

TECH

SUPERVISOR

METALS/

STRUCTURES

WORK

ROOM

CORRIDOR

W&T

SUPERVISOR

MECHANICAL

WHEEL & TIRE

WORKSHOP

FIRST

SERGEANT

RECEPTION/

OPEN

OFFICE

SQUADRON

COMMANDER

TRAINING

ROOM

BREAK

ROOM

CORRIDOR

MEN'S

LOCKER

MEN'S

CHIEFS'

OFFICE

EMF

LEAD

CMF

LEAD

CHIEFS'

OFFICE

JANITOR

MOTHER'S

ROOM

MECHANICAL

LOBBY

STORAGESTORAGE

WOMEN'S

WOMEN'S

LOCKER

CORRIDOR

DEPUTY

COMMANDER

COMPOSITE

MAINTENANCE

HANGAR

BAY

VEST.

HALLWAY

HEF

ROOM

METAL

TECH

WORKSHOP

EGRESS

STORAGE

C1 C1 C1C1

C1C1C1

C1

C1

C1

C1

C1

C1 C1

C1

C1

C2

C2

C2

C2

C1

C1

C1

C2C2

C1

C1

C2

C2C3

C2

C2

C1C1

C1

C1

C1C1C1

C2C2

C3

C3

C2 C2

C2C2

C1

C2

C2

C1

D3 D3

D3

D3D3

D3

D3 D3

D3D3

D3 D3

T1

D3

D3

D3

D3 D3

D3

D3

D2 D2

D1

D1

D1

D1

D5

D6

D5

D4

D4

D4

C2

C2

C2

C2

T1

C2

C2

T1

C2

C2

T1

C2

C2

T1

C2

C2

T1

C2

C2

T1

C2

C2

T1

F1

F1

F1

F1 F1 F1

D3 D3 D3

C2 C2

C2

C2

C2 T2

C2 C2

C2

C2

C2 T2

C2 C2

C2

C2

C2 T2

C2 C2

C2

C2

C2 T2

C2 C2

C2

C2

C2 T2

T3

D4

C2 C2

C1

T o o l

B o x

FURNITURE PLAN GENERAL NOTES:

1. ALL FURNITURE AND EQUIPMENT BY THE GOVERNMENT.

2. CONTRACTOR SHALL COORDINATE WITH GOVERNMENT TO RELOCATE AND INSTALL

EXISTING GOVERNMENT EQUIPMENT FROM CURRENT LOCATIONS IN BUILDINGS 400

AND 409 TO FINAL LOCATIONS AS NOTED ON THE PLANS, SEE EQUIPMENT SCHEDULE

AND LOCATION MAPS THIS SHEET. AT EXISTING EQUIPMENT LOCATIONS, ALL

CONDUIT AND WIRING SHALL BE REMOVED BACK TO NEAREST DISCONNECT,

ACCESSIBLE JUNCTION BOX OR PANEL SOURCE.

3. CONTRACTOR SHALL INSTALL ALL OF THE

APPLIANCES AND GOVERNMENT SUPPLIED EQUIPMENT.

4. SYSTEMS FURNITURE SHALL BE INSTALLED AND COORDINATED BY

GOVERNMENT.

5. INSTALL WOOD BLOCKING REINFORCEMENT AT ALL WALL MOUNTED

CASEWORK AND GOVERNMENT SUPPLIED EQUIPMENT.

METALS TECH WELDING

SHOP

SAND BLAST

TIRE SHOP

STRUCTURAL

SHOP

BLDG. 400

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

M&H NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.

Mead & Hunt, Inc.

2440 Deming Way

Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

/3

/2

:1

:2

P M

C R e v it L o c a l\

-1

.0

-A

-C e n tr a l-p jc

.r v t

T R

U A

X F

IE

L D

A N

G B

M A

D

IS

O N

W

I

F -3

A L T

E R

B U

IL

D

IN

G

A-901

FIRST FLOOR

FURNITURE PLAN

FOR REFERENCE

ONLY

XGFG182008ANG NO.:

3141300-190289.01

BAE

JJB

July 31, 2020

PJC

PLAN

NORTH

TRUE

NORTH

1/8" = 1'-0"1

FINISHED FLOOR PLANS

NO SCALE

BUILDING 400 REFERENCE Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Air Exhaust (installed on ceiling)

Welder exhaust unit, meet

UFC requirements Bldg 400

Metal Rack 144 18 36 front (long side) Bldg 400

Ellis Drill Press 35 36 Under 72 36 sides and front Bldg 400

Brilliant Cut Off Saw 31 45 Under 72 36 sides and front Bldg 400

Bench Grinder (Brown) 18 18 Under 72 Bench mount Bldg 400

Stanley Pedestal Grinder 21 16 Under 72 Bench mount Bldg 400

Tungsten Pedestal Grinder 16 9 Under 72 Bench mount Bldg 400

Drill Bit Pedestal

Sharpener 37 17 Under 72 Bench mount Bldg 400

Miller Plasma Cutter 16 26 Under 72 Bldg 400

Miller Mig Welder (small) 22 31 Under 72 Bldg 400

Lincoln Mig Welder (large) 22 50 Under 72 Bldg 400

Miller Tig Welder 38 23 Under 72 Bldg 400

Weld Table 52.5 52.5 Under 72 36 all around Bldg 400

Scotchman Iron Worker 39 69 Under 72 36 all around Bldg 400

Sunnen Hone Machine 51 46 Under 72 36 front Bldg 400

Blaster Booth Separator 26 32 129 Bldg 400

Blaster Booth Cabinet 70 58 90

8ft. x 8ft. foot print for combined unit

Bldg 400

Hydraulic Press 70 36 82 36 front/back, 24 ends Bldg 400

Quench Tank 38 26 30 On wheels Bldg 400

Lucifer Heat Treating

Oven 56 69 122 54 front, 18 sides/back Bldg 400

Standard Modern Lathe 70 35 76 24 front/sides, 12 back Bldg 400

Bridgeport Lathe 100 63 83 36 all around Bldg 400

HAAS CNC Mill 148 120 123 36 front, 24 sides/back Bldg 400

Well saw Band Saw 88 44 20 ft. clear aft Bldg 400

Bridgeport Manual Mill 93 78 94 36 front/sides, 12 back Bldg 400

Omax CNC Waterjet 155 94 ? N/A

Machine Length Width Height Clearance Current Bldg Location

Metals Tech Machines

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Spot Weld, Hand Shear, Shrink/Stretch Machine 132 48 78

36 front Bench mount

Power for Spot welder only

Bldg 400

Bench Top; Break, Press, Bar Folder 144 36 84 36 front Bench mount Bldg 400

HAZ Locker 18 42 66 36 front Bldg 400

HAZ Locker 18 42 66 36 front/back, 36 sides Bldg 400

Sander 30 30 60 Power for light only Bldg 400

Punch Machine 48 24 80 48 front / 48 sides Bldg 400

Tube Flare 48 36 60 36 front / 24 left side, 12 right side Bldg 400

Large Work bench 180 60 40 36 all sides Bldg 400

Slip Roller 60 30 72 36 front / 24 sides Bldg 400

Brake 120 66 72 36 front / 24 sides Bldg 400

Small Shear 66 48 48 36 front Bldg 400

Band Saw 60 48 84 36 front/back, 24 sides Bldg 400

Metal Rack 96 60 96 72 front Bldg 400

ACCU Shear 126 114 96 72 front / 24 back Bldg 400

Tube Bender 186 72 54 Future purchase N/A

Machine Length Width Height Clearance Current Bldg Location

Structures Machines

HAZ Locker 18 42 66 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Tool Box 24 36 38 36 front Bldg 400

Solvent Tank 37 24 Under 72 36 front/sides Bldg 400

Inflation Cage 42 20 Under 72 36 front/sides Bldg 400

Bead Breaker 44 21 Under 72 36 front/sides Bldg 400

Wheel Washer 74 84 86 36 front/sides Bldg 409

Machine Length Width Height Clearance Current Bldg Location

Wheel and Tire Machines

07/31/20 TYPE B3 FINAL

2 03/03/21 ADDENDUM - 02

Sheets
A-901 - FIRST FLOOR FURNITURE PLAN FOR REFERENCE ONLY

File details come from the government source that posted it. Updated .