This federal solicitation seeks competitive bids for construction services to alter an F-35 aircraft hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project includes demolishing 19,913 square feet of hangar shop space and reconfiguring the area for F-35 aircraft maintenance operations, including lavatories, offices, break rooms, mechanical spaces, and repair shops. An additional 19,803 square feet of hangar space will be modified to accommodate F-35 aircraft, with modifications to fire suppression, aircraft power and air systems, and lightning protection. Mechanical, plumbing, electrical, and technology systems work is also required. The solicitation includes two options related to fire protection runoff storage and perimeter trench infill. Interested contractors must attend a pre-bid conference on February 16, 2021 and submit bids no later than March 8, 2021. The contract is valued between $10-25 million and has a one year period of performance. The award will be fixed-price and go to the responsive and responsible lowest bidder. The solicitation is designated unrestricted with a HubZone preference and requires small business subcontracting plans for large businesses.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 Alter Hangar 406 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRST FLOOR
100'-0"
TOP OF FOOTING
95'-0"
T.O. UPPER WALL
117'-4"
HANGAR EAVE
130'-11"
A-301
R0 R2 R4 R6 R8 10 L8 L6 L4 L2 L0 LDPR1 R3 R5 R7 R9 L9 L7 L5 L3 L1
A-301
A-301
A-311
A-311
COMPOSITE
MAINTENANCE
HANGAR
BAYHALLWAY
STORAGE
4.211
A-311
Sim
4.215
4.214
4.2014.201
A-501
A-501
METAL
TECH
WORKSHOP
4.114
FIRST FLOOR
100'-0"
T.O. LOWER WALL
114'-4"
TOP OF FOOTING
95'-0"
T.O. UPPER WALL
117'-4"
ABCDEFG
A-301
A-311
LOBBY
STORAGE
WOMEN'S
LOCKERWOMEN'S
CORRIDOR
MEN'S
MEN'S
LOCKER
RECEPTION/
OPEN
OFFICEA-311
Sim
A-502
4.2194.219
4.204
FIRST FLOOR
100'-0"
T.O. LOWER WALL
114'-4"
TOP OF FOOTING
95'-0"
ABCDEFG DP
A-301
COMPOSITE
MAINTENANCE
HANGAR
BAY
MECHANICAL
HEF
ROOM
A-502
A-502
5SIM. SIM.
A-311
Sim
4.211 4.211
4.201
A-501
A-501
4.114
FIRST FLOOR
100'-0"
T.O. LOWER WALL
114'-4"
TOP OF FOOTING
95'-0"
T.O. UPPER WALL
117'-4"
ABCDEFG DP
A-301
A-311
A-311
EGRESS
STORAGE
EGRESS
WORKSHOP
WELDING
METAL
TECH
WORKSHOP
STRUCTURES
WORKSHOP
A-311
Sim
A-311
Sim
4.204
4.204
4.1314.131
4.132
5 1/2"
4.133
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
/3
/2
:0
:5
P M
C R e v it L o c a l\
-1
.0
-A
-C e n tr a l-p jc
.r v t
T R
U A
X F
IE
L D
A N
G B
M A
D
IS
O N
W
I
F -3
A L T
E R
B U
IL
D
IN
G
A-301
BUILDING SECTIONS
XGFG182008ANG NO.:
3141300-190289.01
BAE
JJB
July 31, 2020
PJC
1/8" = 1'-0"1
BUILDING SECTION
1/8" = 1'-0"3
BUILDING SECTION
1/8" = 1'-0"2
BUILDING SECTION
1/8" = 1'-0"4
BUILDING SECTION
KEYED NOTES
4.114 REINSTALL BIRD NETTING UNDER TRUSSES,
4.131 EXISTING OVERHEAD BRIDGE CRANE. COORDINATE WITH GOVERNMENT
FOR INSTALLATION OF NEW LOW CLEARANCE HOOK CARRIAGE, PROVIDE
TRAVEL STOPS ON BRIDGE TO LIMIT TRAVEL AT NEW VESTIBULE WALL.
4.132 PARTIAL HEIGHT WALLS FOR NEW VESTIBULE, PROVIDE BRACING AS
REQUIRED, SEE DETAIL 19/A-501 FOR RATED LID OVER VESTIBULE.
4.133 PROVIDE HEAVY ANGLE TRAVEL STOP WELDED TO WEB, MATCH EXISTING
STOPS FOR THICKNESS AND DIMENSIONS. LOCATION NOTED IS
APPROXIMATE, CONTRACTOR TO VERIFY FINAL LOCATION, COORDINATE
WITH NEW HOIST CARRIAGE SELECTED TO ENSURE PROPER CLEARANCES.
4.201 NEW 1 1/2" METAL SIDING, FASTEN TO EXISTING SUPPORTS, SEE 15/ A-501
4.204 3" EIFS WALL SYSTEM
4.211 VERTICALLY ATTACHED METAL DECKING SMOKE DRAFT CURTAIN. SEE RCP
FOR LOCATIONS
4.214 EXISTING MEMBRANE ROOF
4.215 EXISTING STANDING SEAM ROOF
4.219 EXTEND EXISTING FURRING AND WALL BOARD ABOVE NEW CEILING ,
PROVIDE SEAMLESS PATCH AND PREPARE FOR SCHEDULED FINISHES.
07/31/20 TYPE B3 FINAL
2 03/03/21 ADDENDUM - 02
| Sheets |
| A-301 - BUILDING SECTIONS |
File details come from the government source that posted it. Updated .