01 14 00_Add02.pdf

PDF 20 KB Posted

Attached to
F-35 Alter Hangar 406 Federal contract opportunity
Solicitation number
W50S9F-21-B-0001
Issued by
Department of the Army National Guard

About this file

This solicitation and related documents outline requirements for an alteration project at Truax Field Air National Guard Base in Madison, Wisconsin. The project seeks to demolish and reconfigure existing hangar space to accommodate F-35 aircraft maintenance operations. Work includes mechanical, electrical, and communications systems upgrades, as well as fire suppression and aircraft support systems modifications. The solicitation will result in a single fixed-price construction contract, with options for additional work. Interested parties must attend a mandatory pre-bid conference on February 16, 2021 and site visit. Bids are due by March 8, 2021 and award will be made to the responsive, responsible lowest bidder. The contract duration is 365 days with a magnitude between $10-25 million. The solicitation is available through the SAM.gov website and amendments will be posted there. The North American Industry Classification code is 236220.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
Abstract of Offers with Hubzone Preference.pdf PDF
W50S9F21B00010006.pdf PDF
406 Questions and Answers_113-141.pdf PDF
F-102_Add03.pdf PDF
T-001 Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
W50S9F21B00010005.pdf PDF
C-121_Add03.pdf PDF
C-504_Add03.pdf PDF
34 71 13.19_Add03.pdf PDF
01 45 00.00 10_Add03.pdf PDF
22 31 00_Add03.pdf PDF
T-121 Add03.pdf PDF
W50S9F21B00010004.pdf PDF
C-141_Add02.pdf PDF
G-011_Add02.pdf PDF
AD101_Add02.pdf PDF
C-101_Add02.pdf PDF
E-501_Add02.pdf PDF
SD111_Add02.pdf PDF
A-201_Add02.pdf PDF
10 28 13_Add02.pdf PDF
A-311_Add02.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
04 20 00_Add02.pdf PDF
A-501_Add02.pdf PDF
A-601_Add02.pdf PDF
02 83 00_Add02.pdf PDF
01 11 00_Add02.pdf PDF
W50S9F21B00010003.pdf PDF
10 22 39_Add01.R1.pdf PDF
07 27 26_Add01.R1.pdf PDF
A-131_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 22Feb21.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
W50S9F21B00010001.pdf PDF
W50S9F-21-B-0001.pdf PDF
ATTACHMENT 6-Justification and Approval Monaco.pdf PDF
ATTACHMENT 8-406 Submittal Log.xlsx XLSX spreadsheet
ATTACHMENT 9-SFS Form 12.xls XLS spreadsheet
ATTACHMENT 10-PRE-BID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
ATTACHMENT 4-Justification and Approval Advantor.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRUAX FIELD ANGB - F-35: ALTER BLDG 406 Addendum 2

XGFG182008 03 MAR 2021

SECTION 01 14 00

WORK RESTRICTIONS

11/11

PART 1 GENERAL

1.1 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance with Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES:

SD-01 Preconstruction Submittals

List of Contact Personnel; G

1.2 CONTRACTOR ACCESS AND USE OF PREMISES

1.2.1 Activity Regulations

Ensure that Contractor personnel employed on the Activity become familiar with and obey Activity regulations including safety, fire, traffic and security regulations. Keep within the limits of the work and avenues of ingress and egress. Wear hard hats in designated areas. Do not enter any restricted areas unless required to do so and until cleared for such entry. Mark Contractor equipment for identification.

1.2.1.1 Subcontractors and Personnel Contacts

Provide a list of contact personnel of the Contractor and subcontractors including addresses and telephone numbers for use in the event of an emergency. As changes occur and additional information becomes available, correct and change the information contained in previous lists.

1.2.1.2 No Smoking Policy

Smoking is prohibited within and outside of all buildings on installation, except in designated smoking areas. This applies to existing buildings, buildings under construction and buildings under renovation. Discarding tobacco materials other than into designated tobacco receptacles is considered littering and is subject to fines. The Contracting Officer will identify designated smoking areas.

1.2.2 Working Hours

Regular working hours must consist of an period agreed to by the Contracting Officer, between 7 a.m. and 4:30 p.m., Monday through Friday, , excluding Government holidays.

1.2.3 Work Outside Regular Hours

Work outside regular working hours requires Contracting Officer's Representative approval. Make application 5 calendar days prior to such work to allow arrangements to be made by the Government for inspecting the

SECTION 01 14 00 Page 1 work in progress, giving the specific dates, hours, location, type of work to be performed, contract number and project title. Based on the justification provided, the Contracting Officer's Representative may approve work outside regular hours. During periods of darkness, the different parts of the work must be lighted in a manner approved by the Contracting Officer's Represesntative.

1.2.4 Occupied Buildings

Building 406 will not be occupied during construction.

The Contractor shall be working around existing buildings which are occupied. Do not enter the buildings without prior approval of the Contracting Officer.

The existing buildings and their contents must be kept secure at all times. Provide temporary closures as required to maintain security as directed by the Contracting Officer.

Leave attached equipment in place, and protect it against damage, or temporarily disconnect, relocate, protect, and reinstall it at the completion of the work.

The Government will remove and relocate other Government property in the areas of the buildings scheduled to receive work.

1.2.5 Utility Cutovers and Interruptions

a. Make utility cutovers and interruptions after normal working hours or on Saturdays, Sundays, and Government holidays. Conform to procedures required in paragraph WORK OUTSIDE REGULAR HOURS.

b. Ensure that new utility lines are complete, except for the connection, before interrupting existing service.

c. Interruption to water, sanitary sewer, storm sewer, telephone service, electric service, air conditioning, heating, fire alarm, compressed air, and are considered utility cutovers pursuant to the paragraph

WORK OUTSIDE REGULAR HOURS.

1.2.6 Airfield Safety

a. The project is located adjacent to the Dane County Regional Airport and requires a special permit from the local Federal Aviation Authority (FAA) for tall vertical construction equipment (cranes) and construction.

1. The contractor shall obtain an FAA 7460 Permit to allow for the use of any tall vertical equipment such as cranes, adjacent to the airfield. This is a Federal Aviation Administration Form 7460 and this process shall be coordinated with the COR. These restrictions include both the height of vertical construction equipment and airfield visibility. Vertical construction equipment such as cranes cannot be used during periods of weather with low visibility. Refer to the Federal Aviation Administration's guidelines (CFR Title 14 Part 77.13). The FAA 7460 Permit can be found and submitted at the following FAA website:

https://oeaaa.faa.gov/oeaaa/external/portal.jsp.

SECTION 01 14 00 Page 2

Kent Falligant Highlight Building 406 will not be occupied during construction.

Kent Falligant Highlight

1.2.6 Airfield Safety

a. The project is located adjacent to the Dane County Regional Airport and requires a special permit from the local Federal Aviation Authority (FAA) for tall vertical construction equipment (cranes) and construction.

1. The contractor shall obtain an FAA 7460 Permit to allow for the use of any tall vertical equipment such as cranes, adjacent to the airfield. This is a Federal Aviation Administration Form 7460 and this process shall be coordinated with the COR. These restrictions include both the height of vertical construction equipment and airfield visibility. Vertical construction equipment such as cranes cannot be used during periods of weather with low visibility. Refer to the Federal Aviation Administration's guidelines (CFR Title 14 Part 77.13). The FAA 7460 Permit can be found and submitted at the following FAA website:

https://oeaaa.faa.gov/oeaaa/external/portal.jsp.

PART 2 PRODUCTS

Not Used

PART 3 EXECUTION

Not Used

-- End of Section --