W50S9F21B00010005.pdf

PDF 139 KB Posted

Attached to
F-35 Alter Hangar 406 Federal contract opportunity
Solicitation number
W50S9F-21-B-0001
Issued by
Department of the Army National Guard

About this file

This amendment to a solicitation modifies the specifications, drawings, and response date for an invitation for bid seeking construction services to alter an F-35 aircraft hangar. Key details include:

  • The project scope involves demolishing 19,913 square feet of hangar shop space and modifying 19,803 square feet of hangar space to accommodate F-35 aircraft, including fire suppression, aircraft power and air systems, and lightning protection. Mechanical, plumbing, electrical, and communications systems work is required.

  • Specification sections and drawings were revised. The response date was changed from March 15 to March 17, 2021.

  • Options include a perimeter trench infill and slab.

  • Brand name products specified include security, HVAC control, lock, and radio systems.

  • The contract is valued between $10-25 million. The NAICS code is 236220. The period of performance is 365 days.

  • The solicitation is open to all responsible bidders but includes preferences. A subcontracting plan is required for large businesses.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
Abstract of Offers with Hubzone Preference.pdf PDF
W50S9F21B00010006.pdf PDF
406 Questions and Answers_113-141.pdf PDF
F-102_Add03.pdf PDF
T-001 Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
C-121_Add03.pdf PDF
C-504_Add03.pdf PDF
34 71 13.19_Add03.pdf PDF
01 45 00.00 10_Add03.pdf PDF
22 31 00_Add03.pdf PDF
T-121 Add03.pdf PDF
W50S9F21B00010004.pdf PDF
C-141_Add02.pdf PDF
G-011_Add02.pdf PDF
AD101_Add02.pdf PDF
C-101_Add02.pdf PDF
E-501_Add02.pdf PDF
SD111_Add02.pdf PDF
A-201_Add02.pdf PDF
10 28 13_Add02.pdf PDF
A-311_Add02.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
04 20 00_Add02.pdf PDF
A-501_Add02.pdf PDF
A-601_Add02.pdf PDF
02 83 00_Add02.pdf PDF
01 14 00_Add02.pdf PDF
01 11 00_Add02.pdf PDF
W50S9F21B00010003.pdf PDF
10 22 39_Add01.R1.pdf PDF
07 27 26_Add01.R1.pdf PDF
A-131_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 22Feb21.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
W50S9F21B00010001.pdf PDF
W50S9F-21-B-0001.pdf PDF
ATTACHMENT 6-Justification and Approval Monaco.pdf PDF
ATTACHMENT 8-406 Submittal Log.xlsx XLSX spreadsheet
ATTACHMENT 9-SFS Form 12.xls XLS spreadsheet
ATTACHMENT 10-PRE-BID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
ATTACHMENT 4-Justification and Approval Advantor.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

XGFG182008

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this Amendment is to replace Specification Table of Contents (TOC) w ith revised Specification TOC, revise Section 01 45

00.00 10, revise Section 01 50 00, revise Section 21 13 18.00 10, revise Section 22 31 00, revise Section 32 01 18.71, revise Section 32 13 14.13, revise Section 34 71 13.19, revise Submittal Register, revise Sheet C-101, revise Sheet C-102, revise Sheet C-121, revise Sheet C-504, revise Sheet F-001, revise Sheet F-102, and revise Sheet E-101.

The due date has changed from 15 March 2021 to 17 March 2021. Additional questions as a result of this amendment must be submitted by 12 March 2021 at 12:00pm.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 10-Mar-2021

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W50S9F21B0001

X 9B. DATED (SEE ITEM 11)

04-Feb-2021

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

10-Mar-2021

CODE

USPFO WI 115 MISSION SUPPORT CONTRACTING

3110 MITCHELL ST BLDG 500

MADISON WI 53704-2591

W50S9F 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W50S9F21B0001

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

AMENDMENT 0005

Amendment 0005 consists of changes to the specifications and drawings listed below. Revised specifications and drawings are also provided with this amendment.

Changes to specifications:

A. Specification TOC

1. Added Section 34 71 13.19 and deleted Section 32 01 18.71.

B. Section 01 45 00.00 10

1. Revised Part 3.3.3 Experience Matrix Table to deleted reference to Occupied Family Housing.

C. Section 01 50 00

1. Revised Part 2.3.1 to add the following to the end of the paragraph; “This fencing is not allowed to be used as the project boundary fencing.”

D. Section 21 13 18.00 10

1. Revise the second to last sentence in Part 1.2.d to add “and the contracting officer.” to the end of the sentence and to remove the last sentence of the paragraph.

E. Section 22 31 00

1. New completely revised Section 22 31 00 issued.

F. Section 32 01 18.71

1. Removed section for Grooving of Airfield Pavement. The pavement grooving will not be required on this project.

G. Section 32 13 14.13

1. Revised section 32 13 14.13. Removed Part 1 references to unit rate pricing by removing Parts 1.1.1 Measurements, 1.1.2.1 Unit Price, 1.1.3 Payment of Lots.

2. Added to Part 1.4.5 “Preinstallation Meeting” and requirements.

3. All Part 1 renumbered for above changes.

4. Added text to Part 3.6.5 Texturing to clarify “Texture surface of pavement by raking to match adjacent concrete”.

5. Removed Part 3.6.5.2 Surface Grooving for Concrete Paving for Airfields and Other Heavy Duty Pavements.

H. Section 34 71 13.19

1. Add as new section for Crash Rated Active Vehicle Barriers and Controls.

I. Submittal Register

1. Added Section 34 71 13.19 to Submittal Register.

W50S9F21B0001

Changes to plans:

A. Drawing C-101:

1. Revised C-101 to include five (5) bollards between the vehicle barrier drop arm and building 420.

B. Drawing C-102:

1. Revised C-102 to clarify joint Type C joint and introduce joint Type D.

C. Drawing C-121:

1. Revised C-121 with the chain link fence removed and added five (5) bollards between the vehicle barrier drop arm and building 420.

D. Drawing C-504:

1. Revised C-504 to clarify Type C joint and introduce Type D joint. For dowel size/spacing, a third note was added to Detail 12 of the Welded Wire Reinforcement section: “11” P.C.C.

use 1” diameter x 18” epoxy coated dowels @ 12” C-C Spacking.”

E. Drawing F-001:

1. Revised sheet F-001 removed former Fire Protection General Note 4.

F. Drawing F-102:

1. Revised sheet F-102 removes the last three sentences from General Note D: “SPRINKLER

CONTRACTOR SHALL VERIFY THE EXISTING PREACTION SYSTEM IS NOT CORRODED.

REPLACE SPRINKLERS AND PIPING IN THE HANGAR BAY IF THE SYSTEM IS

CORRODED. REPLACE SPRINKLERS IN HANGAR BAY WITH K-5.6 SPRINKLERS IF K-

FACTORS EXCEED K-5.6.”

G. Drawing E-101:

1. Revise keyed note 9.313 detail sheet reference from sheet E-501 to sheet E-502 as shown clouded on attached sheet.

SECTION 00010 - SOLICITATION CONTRACT FORM

The required response date/time has changed from 15-Mar-2021 03:00 PM to 17-Mar-2021 03:00 PM.

(End of Summary of Changes)