F-102_Add03.pdf

PDF 432 KB Posted

Attached to
F-35 Alter Hangar 406 Federal contract opportunity
Solicitation number
W50S9F-21-B-0001
Issued by
Department of the Army National Guard

About this file

This solicitation is for alteration and modification services to an existing F-35 aircraft hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project scope includes demolishing existing shop spaces and reconfiguring the area for F-35 maintenance operations, including lavatories, offices, break rooms, and repair shops. Modifications will also be made to the hangar space to accommodate F-35 aircraft, including HEF fire suppression system updates and aircraft ground support systems. Work will be conducted in accordance with project plans, specifications and design requirements.

The solicitation will result in a single firm fixed-price construction contract awarded to the responsive and responsible lowest bidder. A pre-bid conference is scheduled for February 16th, with bids due by March 8th and award expected shortly after. The contract duration is 365 days from notice to proceed. Interested contractors must register in SAM and monitor the beta.SAM.GOV website for solicitation documents and any amendments. The project is set aside for small businesses and has a NAICS code of 236220 with a size standard of $39.5M average annual revenue.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
SF1419 Abstract of Offers - No Hubzone Preference.pdf PDF
Abstract of Offers with Hubzone Preference.pdf PDF
W50S9F21B00010007.pdf PDF
406 Questions and Answers_142-143.pdf PDF
23 07 00_Add04.pdf PDF
W50S9F21B00010006.pdf PDF
F-001_Add03.pdf PDF
406 Questions and Answers_113-141.pdf PDF
T-001 Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
406 Questions and Answers_26-112.pdf PDF
G-001_Add02.pdf PDF
E-101_Add02.pdf PDF
01 50 00_Add02.pdf PDF
12 21 00_Add02.pdf PDF
10 14 00.20_Add02.pdf PDF
05 40 00_Add02.pdf PDF
01 78 00_Add02.pdf PDF
W50S9F21B00010004.pdf PDF
C-141_Add02.pdf PDF
G-011_Add02.pdf PDF
AD101_Add02.pdf PDF
C-101_Add02.pdf PDF
E-501_Add02.pdf PDF
SD111_Add02.pdf PDF
A-201_Add02.pdf PDF
10 28 13_Add02.pdf PDF
A-311_Add02.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
04 20 00_Add02.pdf PDF
A-131_Add01.R1.pdf PDF
C-121_Add01.R1.pdf PDF
W50S9F21B00010003.pdf PDF
10 22 39_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 22Feb21.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
W50S9F21B00010001.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
W50S9F-21-B-0001.pdf PDF
ATTACHMENT 6-Justification and Approval Monaco.pdf PDF
ATTACHMENT 8-406 Submittal Log.xlsx XLSX spreadsheet
ATTACHMENT 9-SFS Form 12.xls XLS spreadsheet
ATTACHMENT 10-PRE-BID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

F

G

DP

R0 R2 R4 R6 R8 10 L8 L6 L4 L2 L0 LDPR1 R3 R5 R7 R9 L9 L7 L5 L3 L1

WELDING

EGRESS

WORKSHOP

EGRESS

SUPERVISOR

VESTIBULE

STRUCTURES

WORKSHOP

COMM

ELECTRIC

STRUCTURES

SUPERVISOR

METALS TECH

SUPERVISOR

METALS/

STRUCTURES

WORK ROOM

CORRIDOR

W&T

SUPERVISOR

MECHANICAL

WHEEL &

TIRE

WORKSHOP

FIRST

SERGEANT

RECEPTION/

OPEN OFFICE

SQUADRON

COMMANDER

TRAINING

ROOM124

BREAK ROOM123

CORRIDOR

STORAGE

CHIEFS'

OFFICE

EMF LEAD

CMF LEAD

CHIEFS'

OFFICE

JANITOR

MOTHER'S

ROOM

MECHANICAL

LOBBY

STORAGE

STORAGE

WOMEN'S

WOMEN'S

LOCKER

CORRIDOR

DEPUTY

COMMANDER

COMPOSITE

MAINTENANCE

HANGAR BAY

VEST.

HALLWAY

HEF ROOM

METAL TECH

WORKSHOP

EGRESS

STORAGE

MEN'S

LOCKER

MEN'S

CONNECT TO EXISTING

PREACTION SYSTEM

CONNECT TO EXISTING

PREACTION SYSTEM

6"ø (SP)6"ø (SP)

6"ø (SP)

6"ø (SP)

4" ø

S

P

6" ø

S

P

6" ø

S

P

6" ø

S

P

8" ø

S

P

6" ø

P

A -2

6" ø

P

A -1

6" ø

P

A -1

6"ø (PA-1)

6" ø

P

A -2

6" ø

S

P

6" ø

S

P

6"ø (SP) 6"ø (SP)

6" ø

H

E F

-1

6" ø

H

E F

-2

REFER TO F-103

FOR CONTINUATION

METALS/

STRUCTURES

WORK ROOM

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

M&H NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.

Mead & Hunt, Inc.

2440 Deming Way

Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

07/31/20 TYPE B3 FINAL

/9

/2

:0

:1

A

M B

IM

/T ru a x F ie ld

A N

G B

F -3

A lt e r B u ild in g

/3

-1

.0

-F -C e n tr a l-

.r v t

T R

U A

X F

IE

L D

A N

G B

M A

D

IS

O N

W

I

F -3

A L T

E R

B U

IL

D

IN

G

F-102

FIRE PROTECTION

PLAN

XGFG182008ANG NO.:

3141300-190289.01

MAL

KF

July 31, 2020

RAB

1/8" = 1'-0"1

FIRE PROTECTION PLAN

GENERAL NOTES

A. FOR FIRE PROTECTION GENERAL NOTES, LEGEND, &

ABBREVIATIONS, SEE SHEET F-001.

B. THE BUILDING SHALL BE PROVIDED WITH AN

AUTOMATIC SPRINKLER SYSTEM THROUGHOUT IN

ACCORDANCE WITH NFPA 13, UFC 3-600-01, & UFC

4-211-01. SPRINLKER CONTRACTOR SHALL BE

RESPONSIBLE FOR SPRINKLER AND PIPING LAYOUTS.

C. EQUIPMENT IN THE HANGAR BAY AND ROOMS WITH

DOORS TO THE HANGAR BAY SHALL BE RATED FOR

CLASS I DIV II OR LOCATED 18" ABOVE FINISHED

FLOOR.

D. DEMOLISH EXISTING PIPING, SPRINKLERS, VALVES,

HANGER/SUPPORTS AND ASSOCIATED EQUIPMENT

THROUGHOUT UNLESS OTHERWISE INDICATED.

EXISTING SPRINKLERS AND PIPING IN THE HANGAR

BAY SHALL REMAIN. MODIFY SYSTEM AS NECESSARY

TO CONNECT TO THE NEW PREACTION RISERS.

REFER TO F-401 FOR DETAILS

PLAN KEY NOTES

PROVIDE AUTOMATIC AIR VENT AT THE HIGHEST

POINT IN THE SYSTEM

SPRINKLER CONTRACTOR TO MODIFY SPRINKLER

LAYOUT TO ACCOMMODATE NEW DRAFT CURTAIN.

REFER TO A-301 FOR DRAFT CURTAIN DETAILS.

3 03/08/21 ADDENDUM - 03

Sheets
F-001 - FIRE PROTECTION LEGEND AND SYMBOLS
F-102 - FIRE PROTECTION PLAN

File details come from the government source that posted it. Updated .