This solicitation is for alteration and modification services to an existing F-35 aircraft hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project scope includes demolishing existing shop spaces and reconfiguring the area for F-35 maintenance operations, including lavatories, offices, break rooms, and repair shops. Modifications will also be made to the hangar space to accommodate F-35 aircraft, including HEF fire suppression system updates and aircraft ground support systems. Work will be conducted in accordance with project plans, specifications and design requirements.
The solicitation will result in a single firm fixed-price construction contract awarded to the responsive and responsible lowest bidder. A pre-bid conference is scheduled for February 16th, with bids due by March 8th and award expected shortly after. The contract duration is 365 days from notice to proceed. Interested contractors must register in SAM and monitor the beta.SAM.GOV website for solicitation documents and any amendments. The project is set aside for small businesses and has a NAICS code of 236220 with a size standard of $39.5M average annual revenue.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 Alter Hangar 406 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A
B
C
D
E
F
G
DP
R0 R2 R4 R6 R8 10 L8 L6 L4 L2 L0 LDPR1 R3 R5 R7 R9 L9 L7 L5 L3 L1
WELDING
EGRESS
WORKSHOP
EGRESS
SUPERVISOR
VESTIBULE
STRUCTURES
WORKSHOP
COMM
ELECTRIC
STRUCTURES
SUPERVISOR
METALS TECH
SUPERVISOR
METALS/
STRUCTURES
WORK ROOM
CORRIDOR
W&T
SUPERVISOR
MECHANICAL
WHEEL &
TIRE
WORKSHOP
FIRST
SERGEANT
RECEPTION/
OPEN OFFICE
SQUADRON
COMMANDER
TRAINING
ROOM124
BREAK ROOM123
CORRIDOR
STORAGE
CHIEFS'
OFFICE
EMF LEAD
CMF LEAD
CHIEFS'
OFFICE
JANITOR
MOTHER'S
ROOM
MECHANICAL
LOBBY
STORAGE
STORAGE
WOMEN'S
WOMEN'S
LOCKER
CORRIDOR
DEPUTY
COMMANDER
COMPOSITE
MAINTENANCE
HANGAR BAY
VEST.
HALLWAY
HEF ROOM
METAL TECH
WORKSHOP
EGRESS
STORAGE
MEN'S
LOCKER
MEN'S
CONNECT TO EXISTING
PREACTION SYSTEM
CONNECT TO EXISTING
PREACTION SYSTEM
6"ø (SP)6"ø (SP)
6"ø (SP)
6"ø (SP)
4" ø
S
P
6" ø
S
P
6" ø
S
P
6" ø
S
P
8" ø
S
P
6" ø
P
A -2
6" ø
P
A -1
6" ø
P
A -1
6"ø (PA-1)
6" ø
P
A -2
6" ø
S
P
6" ø
S
P
6"ø (SP) 6"ø (SP)
6" ø
H
E F
-1
6" ø
H
E F
-2
REFER TO F-103
FOR CONTINUATION
METALS/
STRUCTURES
WORK ROOM
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
07/31/20 TYPE B3 FINAL
/9
/2
:0
:1
A
M B
IM
/T ru a x F ie ld
A N
G B
F -3
A lt e r B u ild in g
/3
-1
.0
-F -C e n tr a l-
.r v t
T R
U A
X F
IE
L D
A N
G B
M A
D
IS
O N
W
I
F -3
A L T
E R
B U
IL
D
IN
G
F-102
FIRE PROTECTION
PLAN
XGFG182008ANG NO.:
3141300-190289.01
MAL
KF
July 31, 2020
RAB
1/8" = 1'-0"1
FIRE PROTECTION PLAN
GENERAL NOTES
A. FOR FIRE PROTECTION GENERAL NOTES, LEGEND, &
ABBREVIATIONS, SEE SHEET F-001.
B. THE BUILDING SHALL BE PROVIDED WITH AN
AUTOMATIC SPRINKLER SYSTEM THROUGHOUT IN
ACCORDANCE WITH NFPA 13, UFC 3-600-01, & UFC
4-211-01. SPRINLKER CONTRACTOR SHALL BE
RESPONSIBLE FOR SPRINKLER AND PIPING LAYOUTS.
C. EQUIPMENT IN THE HANGAR BAY AND ROOMS WITH
DOORS TO THE HANGAR BAY SHALL BE RATED FOR
CLASS I DIV II OR LOCATED 18" ABOVE FINISHED
FLOOR.
D. DEMOLISH EXISTING PIPING, SPRINKLERS, VALVES,
HANGER/SUPPORTS AND ASSOCIATED EQUIPMENT
THROUGHOUT UNLESS OTHERWISE INDICATED.
EXISTING SPRINKLERS AND PIPING IN THE HANGAR
BAY SHALL REMAIN. MODIFY SYSTEM AS NECESSARY
TO CONNECT TO THE NEW PREACTION RISERS.
REFER TO F-401 FOR DETAILS
PLAN KEY NOTES
PROVIDE AUTOMATIC AIR VENT AT THE HIGHEST
POINT IN THE SYSTEM
SPRINKLER CONTRACTOR TO MODIFY SPRINKLER
LAYOUT TO ACCOMMODATE NEW DRAFT CURTAIN.
REFER TO A-301 FOR DRAFT CURTAIN DETAILS.
3 03/08/21 ADDENDUM - 03
| Sheets |
| F-001 - FIRE PROTECTION LEGEND AND SYMBOLS |
| F-102 - FIRE PROTECTION PLAN |
File details come from the government source that posted it. Updated .