406 Questions and Answers_142-143.pdf
PDF 89 KB Posted
- Attached to
- F-35 Alter Hangar 406 Federal contract opportunity
- Solicitation number
- W50S9F-21-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document contains details regarding a federal solicitation for alteration services to an F-35 aircraft hangar. The solicitation seeks fixed-price bids to demolish approximately 20,000 square feet of hangar space and reconfigure it for F-35 aircraft maintenance at Dane County Regional Airport in Madison, Wisconsin. Scope of work includes mechanical, plumbing, electrical, and communications systems installation. Two option items relate to a fire protection runoff storage trench and infill slab. Brand name justification is required for several security and control systems. The pre-bid conference is scheduled for February 16, 2021 with bids due by March 8, 2021. The contract is for one year with a total estimated value between $10-25 million. The solicitation will be posted on beta.SAM.gov and amendments issued through this site. Interested parties must register in the System for Award Management to be eligible to bid.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 Alter Hangar 406 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers (142-143) Date: March 12, 2021
Solicitation Number W50S9F-21-B-0001 F-35 Hangar 406, Madison, Wisconsin
142. Question: The mechanical insulation pages of the specification book (230700/220719) do not match with the insulation schedule tables on drawing pages M-603 and M-612. Can we get clarification of which specification to use?
Answer: Section 23 07 00 has been updated in Amendment 0005 to align with the schedules on the drawings.
143. Question: It is shown in the plans that a fence is placed on the ramp outside the hangar. Typically, on a project like this, Low Profile Airport Barricades are placed 10 feet outside the fence line for additional visibility and delineation. This is not shown on the plans even though the fence extends into the AOA. Based on the plans, there should be 485 linear feet of barricades but is not shown.
Should this be added or is it not required?
Answer: Low profile barriers are not required in front of the temporary project boundary fence line around the hangar.