About this file
This document provides questions and answers related to solicitation number W50S9F-21-B-0001 for alteration work at F-35 Hangar 406 at Dane County Regional Airport - Truax Field in Madison, Wisconsin. Key details include the scope of work such as demolishing 19,913 square feet of hangar shop space and modifying 19,803 square feet of hangar space to accommodate F-35 aircraft. Mechanical, plumbing, electrical, and technology systems work are required along with communications, security, and fire suppression system modifications. The pre-bid conference is scheduled for February 16, 2021 with bids due by March 8, 2021. The contract is valued between $10-25 million and has a one year period of performance. Brand name justification is required for certain sole-sourced products and systems.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 Alter Hangar 406 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers (113-141) Date: March 10, 2021
Solicitation Number W50S9F-21-B-0001 F-35 Hangar 406, Madison, Wisconsin
113. Question: With regard to which panel is monitoring which suppression devices, please confirm that the functional matrixes on drawings F-602 and F-604 take precedence over conflicting requirements in section 21 13 18.
Answer: The Government is unclear which requirements in the specification conflict with the functional matrices on F-602 and F-604. Please provide specific notations.
114. Question: Spec section 21 13 18.00 10 Pre-Action Sprinkler System, drawing sheet F-001 FP Note
#4 states sections of existing piping shall be submitted for analysis for corrosion and wall thickness. Should corrosion be present the system shall be replaced. Where is the cost of replacement if required be presented in the bid breakout, or will this be priced after award once analysis have been completed?
Answer: See Amendment 0005 for revised F-102 to remove Fire Protection General Notes number 4, revised sheet F-002 General Note D and revised Section 21 13 18.00 10 Part 1.2.d.
115. Question: Please confirm that Bid Item NO 0002 Communications Cabling & Equipment is to include all work associated with Division 27 Complete.
Answer: Amendment 0005 has revised Sheet T-001 to provide a breakout of items included in each Contract Line Item Number (CLIN).
116. Question: Please confirm that Bid Item NO 00003 Security Cabling & Equipment is to include all work associated with Division 28 Complete.
Answer: Amendment 0005 has revised Sheet T-001 to provide a breakout of items included in each Contract Line Item Number (CLIN).
117. Question: Division 32 contains specifications for Grooving of Airfield Paving specification section
32 01 18.71 and Concrete Paving for Airfields and Other Heavy Pavements specification section 32 13 14.13. I do not see any of this work detailed on sheet C-101. Is there any grooving or heavy pavement required?
Answer: See Amendment 0005 where Section 32 01 18.71 has been removed. Amendment 0005 also modified Section 32 13 14.13 to remove unit rate price structure with lump sum price structure to remain, insert new Part 1.4.5 Preinstallation Meeting requirements and clarify Part
3.6.5 Texturing.
118. Question: Per Section 01 45 35 paragraph 1.3.9 Contractor's Quality Control (QC) Manager, the contractor is to retain a Quality Control Manager. Is this individual required to be on site at all times that construction activities are taking place?
Answer: The responsibilities of the Quality Control Manager are identified in Part 3.1.1 of Section 01 45 35.
119. Question: Is there a specification for the Traffic Barrier such as UFGS 34 11 13.19? What is the crash rating requirement? Example: M30 6,800 kg (15,000 lbs.) @ 30 mph (50 km/h)?
Answer: See specification 34 71 13.19, Crash Rated Active Vehicle Barriers and Controls.
120. Question: Who is responsible for furnishing and installing the drop arm cross control equipment and battery backup panel?
Answer: See Amendment 0005 for new Section 34 71 13.19 Crash Rated Active Vehicle Barriers and Controls. See Amendment 0005 revised electrical drawing E-101 that changed Keyed Note
9.313 reference from E-501 to E-502. Refer to E-101, Keyed Note 9.313, and E-502 for additional information on vehicle barrier.
121. Question: Regarding the drop arm cross control equipment, if contractor is responsible for furnishing, please provide a specification or basis of design for the system.
Answer: See specification 34 71 13.19 Crash Rated Active Vehicle Barriers and Controls.
122. Question: Are we providing the wireless access point equipment?
Answer: Wireless access point equipment will be Government Furnished, Government Installed.
123. Question: It looks like the fence scope is limited to the drop arm gate and the 160 LF of fence on sheet C121. The fence note on C121 references a detail, but there is none. Is there a detail or spec we need to bid off of for the fence? Also, that fence stops short of the building? Is that correct? Is there any more information regarding the drop arm gate on C503 and C101?
Answer: See Amendment 0005 revised C-121. The 169 LF permanent chain link fence has been removed from C-121. There is no chain link fence by the drop arm.
See Amendment 0005 revised C-101 and C-121 where five (5) bollards were added between vehicle barrier gate arm and Bldg. 402.
See Amendment 0005 revised Section 01 50 00 Part 2.3.1 to exclude polyethylene mesh from being used as temporary fence around construction boundary. As now specified, temporary fence meeting Section 01 50 00 Paragraph 2.3.2 will be required around the perimeter of the construction boundary. That construction boundary was defined in Addendum 2 sheet G-011.
See Amendment 0005 for new Section 34 71 13.19 Crash Rated Active Vehicle Barriers and Controls. See Amendment 0005 revised electrical drawing E-101 that changed Keyed Note 9.313 reference from E-501 to E-502. Refer to E-101, Keyed Note 9.313, and E-502 for additional information on vehicle barrier.
124. Question: Is it the intent that Monaco is sole sourced for the fire alarm/mass notification as well as the transmission to the fire department.
Answer: Radio Transmitter - As indicated in specification 28 31 76, 2.21.1 the proprietary supervising station receiving equipment is Monaco and the transceiver shall be fully compatible with this equipment. Therefore, the radio transmitter only shall be sole sourced from Monaco.
Fire Alarm/Notification System - No, the fire alarm control panel is NOT required to be sole source by Monaco as indicated in specification 28 31 76, 2.15.
125. Question: Would you like one or two brine tanks? If 2, we would have BOTH of them serve as a combined salt saturator & brine tank for their respective water softener tanks. Is that ok?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.2.3.
126. Question: Our brine tanks will not have an underdrain system & will not have a layer of gravel or a screen for filtering the brine. Is that ok?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.3.1.
127. Question: Our brine tanks will not have a solenoid operated inlet valve; but they will have a backup safety float. Is that ok?
Answer: See Amendment 0005 revised Section 22 31 00. (Reference Section 22 31 00, Part 2.3.1).
128. Question: The H125 control valve is not a multi-port valve. Is that ok?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.4.1.
129. Question: The softeners will regenerate based on water use via internal meters on the H125 control valves; regeneration will not be initiated via a hardness tester. Is that ok?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.4.1.
130. Question: The spec is calling for a "hardness tester" to be installed in the soft water line leading from each softener unit. Our system does not include a 'hardness tester". Is that ok?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.6.1.
131. Question: Can we use our standard Inlet/Outlet pressure gauges and sample cocks?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.6.3.
132. Question: We do not provide a sample cock on the brine tank. Is that ok?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.6.3.
133. Question: Will you accept our standard Hach 5B test kit for testing the water hardness?
Answer: See Amendment 0005 revised Section 22 31 00. Reference Section 22 31 00, Part 2.6.4.
134. Question: We do not provide testing kits for testing saturated brine. Is that ok?
135. Question: Is our standard softener startup procedure acceptable or does sampling of the respective water need to be done and logged every 2.5 minutes - per Section 22 31 00-3.4.1-a/b/c?
136. Question: My question is regarding the inlet gas pressure coming into the building. On drawing number M-131 it shows a note: Estimated new load of 4465 CFH @ 5 psi. My question is will this system exceed the 5 psi design pressure? Per NFPA 54 the maximum design pressure for the piping systems located inside a building shall not exceed 5 psi unless some conditions are met.
Answer: Gas pressure would not exceed 5 psi within the building. 5 psi is the pressure on the downstream side of the pressure regulator which is located outside the building. You will then have pressure drop thru the gas meter and the distribution piping. As such, the gas pressure will be less than 5 psi throughout the building. It will then be stepped down again at each piece of equipment. This allows small piping to be used for the gas pipe distribution system within the building.
137. Question: Per Spec Section 01 45 00.00 10 Quality Control that was added in Amendment 04, Part
3.3.3 CQC Personnel calls out for quality control specialists that are required be physically present at the construction site during work on the specialized personnel’s areas of responsibility. Listed in this section is Occupied Family Housing. It is our assumption that this was inadvertently added to this section. Can the government please confirm that this is the case or clarify when this individual would be required to be onsite?
Answer: See Amendment 0005 revised Section 01 45 00.00 10, Part 3.3.3 to remove reference to Occupied Family Housing from Experience Matrix table.
138. Question: Advantor Systems (Sole Sourced provider) has notified us that they’re not bidding unless they receive the following answers to these questions:
Sheet TY121 of the drawing package displays to Audible alarm at the top of the Hangar. Advantor is not familiar with this type of device. Can the Government provide advisement on what type of device they are looking?
Sheet TY121 of the drawing package has a note pointing to a card reader that states “PEDESTAL CARD-READER SEE CIVIL DETAIL 3/C504 FOR PEDESTAL DETAIL”. When reviewing the referenced Civil Detail, it does not provide any pedestal related information. If the Government could provide clarification on the need for the card reader, it would be greatly appreciated. With it being sole sourced, I can’t get bids from other contractors. Is there anything you can do to help?
Answer: The audible alarm is not connected to the ADVANTOR system.
See Amendment 5 revised T-121 where note at pedestal reader has been changed to reflect correct detail reference 8/C-503. The pedestal card-reader is tied into the Schneider Electric (Andover) System for Access Control (See Note 9.802). It is not connected to the ADVANTOR system.
139. Question: Sheet C-102 shows Type C joint as a longitudinal construction joint. The details on sheet C-504 shows that as a Dowel Basket, that cant be constructed in that manner. I think you meant the type C joint to be drilled and grouted as a loose dowel. It is likely the contractor will pour this job in 10-0 0r 20-0 lanes.
Answer: See Amendment 0005 revised sheets C-102 and C-504 for clarification Type C joint and introduction of Type D joint.
140. Question: Sheet 504 also needs a detail for dowel bar diameter and dowel bar on center spacing, ex: 12” o.c. 18”o.c.?
Answer: See Amendment 0005 revised sheet C-504 for clarification on dowel bar size & spacing. A third note was added to detail 12 of the Welded Wire Reinforcement section: “11" P.C.C. use 1" diameter x 18" epoxy coated dowels @ 12" C-C Spacing”.
141. Question: Please confirm the fan weight of the destratification fans. Can you please provide the diameter for the high velocity fans listed on the Destratification Fan Schedule?
Answer: Weights of destratification fans as scheduled in M-602 are confirmed for basis of design units. There may be variation depending on manufacturer selected. The basis of design velocity fan is 15" diameter.