E-101_Add02.pdf
PDF 503 KB Posted
- Attached to
- F-35 Alter Hangar 406 Federal contract opportunity
- Solicitation number
- W50S9F-21-B-0001
- Issued by
- Department of the Army National Guard
About this file
This solicitation package describes an invitation for bid for alteration and renovation services at an F-35 aircraft hangar. The project scope includes demolishing 19,913 square feet of existing hangar shop space and reconfiguring the area for F-35 maintenance operations, including mechanical, plumbing and electrical systems work. An additional 19,803 square feet of hangar space will be modified to accommodate F-35 aircraft, including fire suppression, aircraft power and lighting systems. There are two additive options involving a fire protection runoff storage trench and perimeter infill/slab work.
The solicitation number is W50S9F-21-B-0001 and was issued by the 115th Fighter Wing at Dane County Regional Airport-Truax Field, Madison WI. The pre-bid conference is scheduled for February 16, 2021 with bids due by March 8, 2021. The contract will be a firm-fixed price design-bid-build contract for one year. The NAICS code is 236220 and the size standard is $39.5M average annual revenue. The project magnitude is between $10-25M. The low bidder will be awarded the contract provided they are responsive, responsible and registered in SAM. Subcontracting plans are required for large businesses.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 Alter Hangar 406 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EE
R0 R1 R2 R3 R4 R5 R6 R7 R8 R9 10 L9 L8 L7 L6 L5 L4 L3 L2 L1 L0 LDP
DP
A
B
C
D
E
F
G
M
XFMR
'26JT2-E15'
ELECTRIC
JAY RELEASING
LEVER BYPASS
METER SOCKET
UTILITY METER
MSB/FIRE PUMP MAIN - 2000A BUSING
CT & MAIN BREAKER SECTION
9.301
E-401
ICE MELT PANEL
EAST HANGAR DOORWEST HANGAR DOOR
9.304 9.304
COILING DOOR
9.303
COILING DOOR
K,ERLD
9.303
GR GR
GR GR
GR GR
GR GR
GR GR
GR GR
GAS SHUTOFF VALVE
EF
EF
(ROOF)
(ROOF)
E
E
E
E
E E
E E
E E
E E
CONTROL PANELS
COMPOSITE
MAINTENANCE
HANGAR
BAY
VEST.
LOBBY
MECHANICAL
STORAGE
STORAGE
WOMEN'S
LOCKER
WOMEN'S
MOTHER'S
ROOM
JANITOR
CORRIDOR
HALLWAY
CHIEFS'
OFFICE
CMF
LEAD
EMF
LEAD
FIRST
SERGEANT
CHIEFS'
OFFICE
SQUADRON
COMMANDER
DEPUTY
COMMANDER
RECEPTION/
OPEN
OFFICE
CORRIDOR
123 BREAK
ROOM
TRAINING
ROOM
MECHANICAL
CORRIDOR
COMM
METALS
TECH
SUPERVISOR
METALS/
STRUCTURES
WORK
ROOM
STRUCTURES
WORKSHOP
METAL
TECH
WORKSHOP
WELDING
VESTIBULE
EGRESS
SUPERVISOR
EGRESS
WORKSHOP
EGRESS
STORAGE
HEF
ROOM
100A HANGAR
DOOR MAIN
SERVICE
DISCONNECT
GENERATOR PLUG
PANEL 1DNH1
PANEL 1PNL3
PANEL 1PNL2
PC
BSW
ACCUS
TF
46"
OCW
BMM
HCM
WSBS
BL
SML
BBC
46"
46" 46"
46" 46"
46"
46"
46"
46"
46"
46"
46"
46"
46"
46"46"46"
46"
46"
STRUCTURES
SUPERVISOR
46"
46"
46"
46"
46"
46"
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI
EWC
GFCI
46"
GFCI
GFCI
GFCI
GFCI
GFCI
GFCI46"
46"
46"
GFCI
46"
46"
46"
46"
46"
GR GRGR GR
46"
SHM
46"
DBPS
46"
TPG
46"
SPG
46"
EDP
46"
SW
46"
BSR
GR
GR
GR
GR
OHRD
OHRD
OHRD
MEN'S
MEN'S
LOCKER
STORAGE
GFCI
46"
46"
GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP
GFCI,WP
SECONDARY SERVICE
FEEDER INCLUDING
CONDUIT PROVIDED BY
MG&E.
M
STORAGE
MW
60"
GPU CR
GPU CR
46"
46"
1PNL2-2
9.309
46"
RTU-2
RTU-1
(ROOF)
(ROOF)
EF-1
(ROOF)
PCA-1
(ROOF)
EF
(ROOF)
DF-1 DF-2 DF-3
DF-4DF-5DF-6
DF CONTROLLER
IR CONTROLLER
IR-1 IR-2 IR-3 IR-4
IR-8
IR-7 IR-6 IR-5
MAU-1
MAU-2
E-401
IF
CUH-5
CUH-4
UH-4
UH-5
UH-7
CUH-9
CUH-3
CUH-2
UH-1
CUH-1
CP-1
MS
GWH-1
SOFT-1
SK-1
MX
9.311
9.311
RTU-3
(ROOF)
(ROOF)
(ROOF)
E-401
HRW-2
(ROOF)
EF-4 EF-5 EF-6
EF-7
(ROOF)
DOOR OPERATOR
DISCONNECT FEED
DF-7
DF CONTROLLER
DF-8
DF-9
DF-10
DF CONTROLLER
DF CONTROLLER
HUM-1
ESEW-1
ESEW-1
ESEW-1
SK-1
MX
46"
46"
9.307
GPU
9.309
46"
46"
1PNL1-67
46"
46"
9.307
46"
46"46"46"46"
(TYP. OF 3)
(TYP. OF 3)
(TYP. OF 4)
9.307
E-401
FIRE
PUMP
CONTROLLER/VFD
FP
1PXH1-1,3,5 1PXH1-2,4,6
GPU
1DNH1-1
1DNH1-2
1DNH1-3
1DNH1-4
1DNH1-6
1DNH1-5 1DNH1-17
1DNH1-18
1DNH1-13
1DNH1-14
1DNH1-15
1DNH1-16
MSB-10
MSB-12
1DNH1-7
MSB-5
1DNH1-8
1DNH1-9
NGCPS
1DNH1-10
NGPS
1DNL2-2
1DNL2-3
1DNL2-4
1DNL1-4
23,25,27
9,11
5,7 1,3
15 15
171717
15 15
21 21
2119 75
1DNL1-5
2,4,6
8,10,12
8,10,12
14 14
28,30,32
28,30,32
36 36 36
42,44,46
62 60
48,50,52
54,56,58
1PNL3-64
1PNL3-65
1PNL3-65
1PNL3-65
1PNL3-65
MSB-1
1PNL3-65
1,3,5
1PNL1-6,8
1PNL1-9,11 1PNL1-13,15 1PNL1-17,19
1PNL1-10,12
PANEL 1PNL1
ALL 208/120V POWER EQUIPMENT AND
DEVICES SHALL BE FED FROM PANEL
1PNL3 UNLESS NOTED OTHERWISE.
ALL 208/120V POWER EQUIPMENT AND
DEVICES SHALL BE FED FROM PANEL
1PNL3 UNLESS NOTED OTHERWISE.
ALL 208/120V POWER EQUIPMENT AND
DEVICES SHALL BE FED FROM PANEL
1PNL1 UNLESS NOTED OTHERWISE.
ALL 208/120V POWER EQUIPMENT AND
DEVICES SHALL BE FED FROM PANEL
1PNL1 UNLESS NOTED OTHERWISE.
ALL 208/120V POWER EQUIPMENT AND
DEVICES SHALL BE FED FROM PANEL
1PNL2 UNLESS NOTED OTHERWISE.
ALL 208/120V POWER EQUIPMENT AND
DEVICES SHALL BE FED FROM PANEL
1PNL2 UNLESS NOTED OTHERWISE.
MX
1PNL1-14 1PNL1-14 1PNL1-14
1PNL1-141PNL1-141PNL1-14
1PNL1-16 1PNL1-16 1PNL1-16 1PNL1-16
1PNL1-161PNL1-161PNL1-16
1PNL1-16
1PNL1-33
35 35
1PNL1-39
41 41
46"
46"
46"
1PNL1-59
91111
27 27
23 23
19 19
1PNL2-10
1PNL2-14
1PNL2-10
32 1PNL2-32
EF-10
(ROOF)
EF-9
(ROOF)
82,84
82,84
(ROOF)
1PNL2-33,35,37
AC-1
MSB-11
ACD-1
1DNH1-11
AV AV
AP
AV
E E E
E E E E E E E E E E E E E E E E E E E E E E E E
E
E E E E E
E
E E
E E
E
E E
AVCP
APCP
(3)#12 & (1)#12
GND IN 3/4" C.
(2)#14 IN 3/4" C.
(2)#12 & (1)#12
GND IN 3/4" C.
(8)#14 IN 3/4" C.
(16)#14 IN 3/4" C.
(2)#12 & (1)#12
GND IN 3/4" C.
(8)#14 IN 3/4" C.
(2)#12 & (1)#12
GND IN 3/4" C.
1DNH1-12
1PNL3-69 1PNL3-69
1PNL3-71
1PNL3-73
1PNL3-73
E E
E E
E E
E E
PULL SECTION
9.312
MSB/BUILDING MAIN - 2000A BUSING
CT & MAIN BREAKER SECTION
PULL SECTION
9.312
M
(ROOF)
48"
GFCI,WP
(ROOF)
48"
GFCI,WP
(ROOF)
48"
GFCI,WP
(ROOF)
48"
GFCI,WP
(ROOF)
48"
GFCI,WP
TCP
1PNL2-34
TCP
1PNL2-34
TCP
1PNL2-36
TCP
1PNL2-36
TCP
1PNL1-58
TCP
1PNL3-72
TCP
1PNL3-74
TCP
1PNL3-74
E
E
E
E
E
INV-FP
1LNL1-61
84"
60FT OF GOVERNMENT PROVIDED
SUPPORT EQUIPMENT CABLING.
60FT OF GOVERNMENT PROVIDED
SUPPORT EQUIPMENT CABLING.
60FT OF GOVERNMENT PROVIDED
SUPPORT EQUIPMENT CABLING.
OHRD
77,79,81
LHH
76,78,80
CUH-6
84"
84"
84"
84"
84"
84"
DOOR OPERATOR
DISCONNECT FEED
DRAIN ISOLATION VALVE
ERLD
ERLD
DROP CROSS ARM
9.313
1PNL1-60,62
ALL WORK ASSOCIATED WITH THE FOAM
TANK, SHOWN WITHIN DASHED LINE,
SHALL BE PART OF ADDITIVE BID ITEM 2A
SLS
1DNH1-24
SLSCP
1PNL3-68
E
E E
E
E
ALL WORK ASSOCIATED WITH THE
SANITARY LIFT STATION, SHOWN
WITHIN DASHED LINE, SHALL BE
PART OF ADDITIVE BID ITEM 2B.
E
E
UH-8
1LNH1-9
INV
EF-12
(ROOF)
1LNH1-13,15,17
2 2 2 2
POWER GENERAL NOTES:
1.
2.
3.
SEE SHEE E-001 FOR NOTES, SYMBOLS AND
ABBREVIATIONS.
SEE SHEET E-601 FOR EQUIPMENT WIRING SCHEDULE.
SEE SHEET E-602 FOR PANEL SCHEDULES.
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
/2
/2
:1
:1
A M
C R e v it L o c a l\
-1
.0
-E -C e n tr a l-m a tt .f ir k u s m e a d h u n t.
c o m
.r v t
T R
U A
X F
IE
L D
A N
G B
M A
D
IS
O N
W
I
F -3
A L T
E R
B U
IL
D
IN
G
E-101
FIRST FLOOR PLAN -
POWER
XGFG182008ANG NO.:
3141300-190289.01
MRF
ARG
July 31, 2020
MRF
PLAN
NORTH
TRUE
NORTH
1/8" = 1'-0"1
FIRST FLOOR PLAN - POWER
KEYED NOTES
9.301 EXISTING SERVICE LATERAL SHALL BE TERMINATED TO
NEW SERVICE SWITCHBOARD AS REQUIRED.
COORDINATE WITH UTILITY.
9.303 EC SHALL INTERCEPT EXISTING CONDUIT AND WIRING AT
EXISTING ACCESSIBLE JUNCTION BOX AND EXTEND AS
REQUIRED TO NEW PANEL AND CIRCUIT AS SHOWN ON
PLAN.
9.304 EC SHALL INTERCEPT EXISTING CONDUIT AND WIRING AT
EXISTING DOOR OPERATOR DISCONNECT AND EXTEND
AS REQUIRED TO NEW PANEL AND CIRCUIT AS SHOWN ON
PLAN.
9.307 PROVIDE 480V, 3-PHASE, 100A RECEPTACLE.
RECEPTACLE CONFIGURATION SHALL MATCH THAT OF
EXISTING REMOVED 100A, 480V RECEPTACLE.
9.309 PROVIDE UNISTRUT ASSEMBLY AS REQUIRED FOR
MOUNTING (3) 480V RECEPTACLES DEFINED IN KEYED
NOTE 9.307 AND (1) 20A, 120V DUPLEX RECEPTACLE.
UNISTRUT ASSEMBLY SHALL BE HIGH ENOUGH TO
SUPPORT INCOMING CONDUITS FROM ABOVE.
COORDINATE EXACT LOCATION IN FIELD WITH OTHER
TRADES.
9.311 PROVIDE A 1/4" X 2" GROUND BUS 18" ABOVE FINISHED
FLOOR WITH INSULATED STANDOFFS 36" ON CENTER,
COMPLETELY AROUND THE PERIMETER OF THIS ROOM.
ROUTE BUS OVER DOORS IN A CONTINUOUS LOOP.
9.312 PROVIDE CONCRETE EQUIPMENT PAD BELOW
EQUIPMENT. SEE DETAIL 16/E-501 FOR MORE
INFORMATION.
9.313 PROVIDE (3)#10, #10 GND IN 1" C TO VEHICLE BARRIER
BEAM BATTERY BACKUP PANEL. REFER TO ALL DETAILS
ON SHEET E-501 FOR ADDITIONAL INFORMATION.
07/31/20 TYPE B3 FINAL
2 03/03/21 ADDENDUM - 02
| Sheets |
| E-101 - FIRST FLOOR PLAN - POWER |
File details come from the government source that posted it. Updated .