T-121 Add03.pdf

PDF 359 KB Posted

Attached to
F-35 Alter Hangar 406
Solicitation number
W50S9F-21-B-0001
Issued by

About this file

This solicitation is for construction services to alter an F-35 aircraft hangar at Truax Field Air National Guard Base in Madison, Wisconsin. The project involves demolishing 19,913 square feet of hangar space to reconfigure it for F-35 maintenance operations, including shops for wheel and tire, welding, egress, and structural work. An additional 19,803 square feet of hangar space will be modified to accommodate F-35 aircraft, including modifications to the high expansion foam fire suppression system, aircraft make-up power and air systems, and lightning protection. The work will be performed in accordance with provided design requirements, specifications and drawings. There are also two options related to fire protection runoff storage and perimeter trench infill/slab. The acquisition requires Advantor security systems, Andover direct digital controls, Marshall Best security corporation premium YB series keys and cores, and Monaco Enterprises radio transceivers. The solicitation will be unrestricted with a HubZone preference and small business subcontracting plan required for large businesses. The response due date is March 8, 2021, with the contract duration of 365 days from notice to proceed.

View the file

Other files

File Type Posted
SF1419 Abstract of Offers - No Hubzone Preference.pdf PDF
Abstract of Offers with Hubzone Preference.pdf PDF
W50S9F21B00010007.pdf PDF
W50S9F21B00010006.pdf PDF
23 07 00_Add04.pdf PDF
406 Questions and Answers_142-143.pdf PDF
406 Questions and Answers_113-141.pdf PDF
22 31 00_Add03.pdf PDF
F-102_Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
F-001_Add03.pdf PDF
C-101_Add03.pdf PDF
01 50 00_Add03.pdf PDF
Specs TOC_Add03.pdf PDF
C-102_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
T-001 Add03.pdf PDF
W50S9F21B00010005.pdf PDF
01 45 00.00 10_Add03.pdf PDF
C-504_Add03.pdf PDF
34 71 13.19_Add03.pdf PDF
C-121_Add03.pdf PDF
AD101_Add02.pdf PDF
A-311_Add02.pdf PDF
G-001_Add02.pdf PDF
12 21 00_Add02.pdf PDF
C-101_Add02.pdf PDF
10 14 00.20_Add02.pdf PDF
G-011_Add02.pdf PDF
A-301_Add02.pdf PDF
A-801_Add02.pdf PDF
406 Questions and Answers_26-112.pdf PDF
01 78 00_Add02.pdf PDF
01 50 00_Add02.pdf PDF
A-901_Add02.pdf PDF
A-201_Add02.pdf PDF
C-141_Add02.pdf PDF
Specs TOC_ Add02.pdf PDF
01 45 00.00 10_Add02.pdf PDF
10 28 13_Add02.pdf PDF
W50S9F21B00010004.pdf PDF
SD111_Add02.pdf PDF
E-501_Add02.pdf PDF
E-101_Add02.pdf PDF
A-101_Add02.pdf PDF
05 40 00_Add02.pdf PDF
02 83 00_Add02.pdf PDF
01 14 00_Add02.pdf PDF
01 11 00_Add02.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

F F

F F

F F

F

M M M

M M

M

M M

M

S

S

SSS

KP

K P

A

IDS

ID

S

ID

S

S

NN

N

N

N

N N

R E

X R

E X

REX

REXREX

R E

XS

E

E E EE

E

A

E

R E

XS

E

N

S E R E

X

N

S

N

REX

E

N

REX

E S

R0 R1 R2 R3 R4 R5 R6 R7 R8 R9 10 L9 L8 L7 L6 L5 L4 L3 L2 L1 L0 LDP

DP

A

B

C

D

E

F

G

WELDING

EGRESS

WORKSHOP

141EGRESS

SUPERVISOR

VESTIBULE

STRUCTURES

WORKSHOP

COMM

ELECTRIC

STRUCTURES

SUPERVISOR

METALS

TECH

SUPERVISOR

METALS/

STRUCTURES

WORK

ROOM

CORRIDOR

W&T

SUPERVISOR

MECHANICAL

WHEEL

& TIRE

WORKSHOP

FIRST

SERGEANT

RECEPTION/

OPEN

OFFICE

SQUADRON

COMMANDER

TRAINING

ROOM

BREAK

ROOM

CORRIDOR

STORAGE

CHIEFS'

OFFICE

EMF

LEAD

CMF

LEAD

115CHIEFS'

OFFICE

JANITOR

MOTHER'S

ROOM

MECHANICAL

LOBBY

STORAGE

STORAGE

WOMEN'S

WOMEN'S

LOCKER

CORRIDOR

DEPUTY

COMMANDER

COMPOSITE

MAINTENANCE

HANGAR

BAY

VEST.

HALLWAY

HEF

ROOM

METAL

TECH

WORKSHOP

EGRESS

STORAGE

MEN'S

MEN'S

LOCKER

MAIN

PEDESTAL

CARD-READER

SEE CIVIL

DETAIL 8/C-503 FOR

PEDESTAL DETAIL.

9.802

T-401

9.803

TYPICAL

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

M&H NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.

Mead & Hunt, Inc.

2440 Deming Way

Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

/1

/2

:1

:4

P

M C

R e v it L o c a l\

-1

.0

-E

-C e n tr a l-ry a n .k e n n y A

C

L

.r v t

T R

U A

X F

IE

L D

A N

G B

M A

D

IS

O N

W

I

F -3

A L T

E R

B U

IL

D

IN

G

T-121

FIRST FLOOR

SECURITY PLAN

XGFG182008ANG NO.:

3141300-190289.01

RKK

JRM

July 31, 2020

MJR

PLAN

NORTH

TRUE

NORTH

1/8" = 1'-0"1

FIRST FLOOR SECURITY PLAN

07/31/20 TYPE B3 FINAL

3 03/08/21 ADDENDUM - 03

KEYED NOTES

9.802 PROVIDE 1 CATEGORY 6 CABLE FROM ACCESS CONTROL SYSTEM IN TR TO

DRY CONTACT TO BARRIER CONTROL PANEL.

9.803 SEE DETAIL 8/T-501 FOR MOUNTING OF SURVEILLANCE CAMERA.

Sheets
T-121 - FIRST FLOOR SECURITY PLAN

File details come from the government source that posted it. Updated .