This document provides details for an invitation for bid for alteration services at an F-35 aircraft hangar. Work includes demolishing 19,913 square feet of hangar shop space and modifying 19,803 square feet of hangar space to accommodate F-35 aircraft. Demolition and new construction services are required, along with mechanical, plumbing, electrical, technology, communications, and security systems installation. Strict adherence to construction plans and specifications is necessary to ensure F-35 requirements are met. Asbestos removal and options for additional work are also included. Interested contractors must register in SAM and attend a mandatory pre-bid conference on February 16, 2021. Bids are due on March 8, 2021 and award will be made to the responsive and responsible lowest bidder. The contract duration is 365 days with a budget between $10-25 million. The solicitation and specifications are available at beta.SAM.gov.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
C-102_Add03.pdf PDF
C-101_Add03.pdf PDF
Specs TOC_Add03.pdf PDF
01 50 00_Add03.pdf PDF
W50S9F21B00010005.pdf PDF
C-121_Add03.pdf PDF
C-504_Add03.pdf PDF
34 71 13.19_Add03.pdf PDF
01 45 00.00 10_Add03.pdf PDF
22 31 00_Add03.pdf PDF
T-121 Add03.pdf PDF
Specs TOC_ Add02.pdf PDF
A-301_Add02.pdf PDF
A-901_Add02.pdf PDF
A-801_Add02.pdf PDF
A-101_Add02.pdf PDF
01 45 00.00 10_Add02.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
04 20 00_Add02.pdf PDF
A-501_Add02.pdf PDF
A-601_Add02.pdf PDF
02 83 00_Add02.pdf PDF
01 14 00_Add02.pdf PDF
01 11 00_Add02.pdf PDF
406 Questions and Answers_26-112.pdf PDF
G-001_Add02.pdf PDF
406 Questions and Answers_1-25.pdf PDF
Specs TOC_Add01.R1.pdf PDF
07 24 00_Add01.R1.pdf PDF
09 67 23.13_Add01.R1.pdf PDF
32 92 19_Add01.R1.pdf PDF
A-201_Add01.R1.pdf PDF
C-101_Add01.R1.pdf PDF
Geotechnical Report_Add01.R1.pdf PDF
07 27 26_Add01.R1.pdf PDF
A-131_Add01.R1.pdf PDF
C-121_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
406 Site Visit Sign In.pdf PDF
W50S9F21B00010001.pdf PDF
ATTACHMENT 2-Truax F-35 B406 XGFG182008 Specs Vol 2 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 3-Truax F35 B406 XGFG182008 Plans Dated 31 July 2020.pdf PDF
ATTACHMENT 7-Justification and Approval Best Lock.pdf PDF
ATTACHMENT 4-Justification and Approval Advantor.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REF. REF.

UP

DEMOLITION PLAN GENERAL NOTES:

1. THE GENERAL CONTRACTOR SHALL VERIFY ALL BUILDING AND SITE

CONDITIONS AND REPORT ANY DISCREPANCIES TO THE COR

BEFORE PROCEEDING WITH ANY SCHEDULED DEMOLITION WORK.

2. THE GENERAL CONTRACTOR SHALL COORDINATE ARCHITECTURAL,

STRUCTURAL, CIVIL, MECHANICAL, ELECTRICAL, TECHNOLOGY, AND

PLUMBING WORK AND ALL SUBCONTRACTORS FOR DEMOLITION AND

REPAIR WORK.

3. IT IS THE INTENT OF THESE DRAWINGS TO INDICATE THE REMOVAL OF ALL

ITEMS WHICH INTERFERE WITH THE FINAL CONSTRUCTION AS SHOWN ON

THE FLOOR PLANS, ELEVATIONS, DETAILS, AND SCHEDULES. ALL FLOOR

FINISHES, BASE, ACOUSTICAL CEILINGS, ABANDONED FURNITURE, WINDOW

TREATMENTS,SHELVING, SIGNAGE, AND ROOFING MATERIALS SHALL BE

DEMOLISHED IN THEIR ENTIRETY.

4. REMOVE ALL ITEMS OF DEMOLITION WORK FROM THE PROJECT DAILY AND

DISPOSE OF PROPERLY.

5. EXISTING CONCRETE AND STEEL STRUCTURE TO REMAIN, TYP. PROTECT

COLUMNS, PILASTERS, BEAMS, AND SLABS.

6. THE EXISTING MECHANICAL, ELECTRICAL,TECHNOLOGY, AND PLUMBING

ITEMS AND/OR SYSTEMS, AND GAS, WATER AND ELECTRICAL METERS ARE

GENERALLY INTENDED TO REMAIN. WHERE WORK CONFLICTS WITH NEW

WORK, DEMOLITION OR REROUTING OF EXISTING INFRASTRUCTURE SHALL

BE REQUIRED. REF: MEP FOR ALL ITEMS TO BE REUSED TYP. ALL ITEMS TO

BE DEMOLISHED SHALL BE REMOVED IN THEIR ENTIRETY, BACK TO THE

ORIGINAL SOURCE. SURROUNDING MATERIALS WHICH ARE DISTURBED OR

DEMOLISHED THAT ARE SCHEDULED TO REMAIN SHALL BE PATCHED WITH

LIKE SURROUNDING MATERIALS, TYPICAL.

7. DEMOLISH CONCRETE FLOOR SLABS AS REQUIRED TO INSTALL NEW

EQUIPMENT, UNDERGROUND CONDUIT, PLUMBING SYSTEMS, AND FLOOR

DRAINS, REF: STRUCTURAL, EQUIPMENT, ELECTRICAL, PLUMBING

DEMOLITION, AND PLUMBING DRAWINGS.

8. PROTECT EXISTING SURFACES TO REMAIN DURING DEMOLITION AND

CONSTRUCTION.

9. REPAIR OR REPLACE ANY EXISTING CONSTRUCTION (WINDOWS, WALLS,

DOORS, CEILINGS, FLOORS, ETC.) TO REMAIN WHICH ARE DAMAGED DURING

CONSTRUCTION. REPLACEMENT MATERIAL SHALL MATCH IN KIND.

10. ASBESTOS ABATEMENT LOCATIONS ARE PRESENTED ON AD-101 AS A

CONVENIENCE TO CONTRACTOR. CONTRACTOR REMAINS RESPONSIBLE FOR

ABATEMENT OF MATERIALS PRESENTED IN THE REPORT. THE REPORT STATES

THERE COULD BE OTHER HAZMAT IN AREAS THAT WERE INACCESSIBLE FOR

INVESTIGATION. IF OTHER LOCATIONS NOT INCLUDED IN THE REPORT ARE

FOUND, REPORT THE FINDINGS TO THE CONTRACTING OFFICER.

11. GENERAL CONTRACTOR TO REMOVE ALL EXISTING EQUIPMENT, FURNITURE,

ETC. MADE ABOSLETE OR NO LONGER WANTED BY THE GOVERNMENT.

VERIFY WITH GOVERNMENT BEFORE SALVAGING OR DISPOSING OF EXISTING

EQUIPMENT, FURNITURE, ETC.

A

B

C

D

E

F

G

DP

R0 R2 R4 R6 R8 10 L8 L6 L4 L2 L0 LDPR1 R3 R5 R7 R9 L9 L7 L5 L3 L1

4.0014.001

4.011

4.010

4.012

4.006

OPERATION

DEBRIEF

ROOM

MECHANICAL

LOCKER

4.008

4.008

4.011

4.010

4.002

4.013

4.013

4.001

4.014 4.014 4.014 4.014 4.014

4.0104.010

4.008

4.001

4.0094.009 4.009

4.009

4.001

4.008

4.009

4.013

4.003

4.003

4.003

4.001

4.001

4.001

4.001

4.010 4.001

4.014

4.001

4.007

4.001

4.002

4.002

4.002

4.010

4.001

4.010

4.010

4.001

4.0044.004

4.001

4.0054.005

4.001 4.0104.001

TYP

4.001

4.001

4.001

4.001

4.001

4.001

4.010

4.001

4.007

4.009

4.0094.009

4.0104.010

TYP

TYPTYP

TYP

TYP

TYP

TYP

4.018

4.019

4.020 4.0204.0204.020

4.020

4.001 4.0184.001

4.018 4.018

4.018 4.008

4.018

4.022

4.018

4.008

4.018

4.018

4.001

4.011

4.008

4.008

4.018

4.001

4.011

4.011

4.001 4.0014.011

4.023

003001

003 003 001

006006

DEMOLITION LEGEND:

EXISTING CONSTRUCTION TO REMAIN

EXISTING CONSTRUCTION TO BE DEMOLISHED, TYP

(U.N.O.)

EXISTING DOOR TO REMAIN

DOOR, FRAME, AND HARDWARE TO BE

DEMOLISHED COMPLETELY, TYP (U.N.O.)

xxx

ASBESTOS ABATEMENT REPORT MATERIAL

CODE

SHEET NO.:

SHEET CONTENTS

DO NOT SCALE DRAWINGS

M&H NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.

Mead & Hunt, Inc.

2440 Deming Way

Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

/3

/2

:0

:1

P M

C R e v it L o c a l\

-1

.0

-A

-C e n tr a l-p jc

.r v t

T R

U A

X F

IE

L D

A N

G B

M A

D

IS

O N

W

I

F -3

A L T

E R

B U

IL

D

IN

G

AD101

FIRST FLOOR

DEMOLITION PLAN

XGFG182008ANG NO.:

3141300-190289.01

BAE

SZK

July 31, 2020

PJC

KEYED NOTES

4.012 REMOVE GYPSUM BOARD AND FURRING.

4.013 DEMO FLOOR IN AREAS TO RECEIVE NEW PLUMBING. SEE PLUMBING

PLANS.

4.014 DEMO EXISTING DOOR RAMPS.

4.018 REMOVE 8" CMU AND PRECAST SILL.

4.019 DEMOLISH AND REMOVE SHELTER AND CANOPY IN ITS ENTIRETY,

CONCRETE PAD TO REMAIN.

4.020 DEMO FLOORS FOR NEW WORK (SEE STRUCTURAL).

4.022 REMOVE CONCRETE LOWER LINTEL AND 12" CMU ABOVE

4.023 EXISTING OVERHEAD BRIDGE CRANE TO REMAIN.

KEYED NOTES

4.001 REMOVE PORTION OF WALL FOR NEW DOOR OR WINDOW OPENING,

COORDINATE WITH FLOOR PLAN FOR NEW OPENING REQUIREMENTS,

LOCATION AND SIZE. COORDINATE WITH STRUCTURAL SHEET S-221 FOR

ADDITIONAL WALL REMOVAL PER MASONRY WALL ELEVATIONS.

4.002 REMOVE COUNTERTOP, CASE WORK AND SINK. SEE PLUMBING FOR

CAPPING OR DEMOLITION OF PIPING.

4.003 REMOVE EXISTING PLUMBING FIXTURES. COMPLETELY CAP DEMOLISHED

PIPING. REF - PLUMBING, TYPICAL.

4.005 REMOVE STORAGE AND MEZZANINE AREA AND RELATED COMPONENTS

COMPLETE. FINAL DISPOSITION TO GOVERNMENT.

4.006 REMOVE AND SALVAGE LOCKERS AND TURN OVER TO GOVERNMENT.

4.007 ALTER PORTION OF CROSS BRACING. REF - STRUCTURAL.

4.008 REMOVE WINDOW, FRAME AND FLASHING, COMPLETE.

4.009 REMOVE EXISTING DOOR, FRAME, AND HARDWARE FOR REPLACEMENT IN

SAME LOCATION.

4.010 REMOVE EXISTING EIFS AND INSULATION BACK TO EXISTING CMU

STRUCTURE AROUND ENTIRE PERIMETER OF HANGAR. PREP AND PREPARE

SURFACE FOR NEW EIFS AND SPLIT BLOCK SIDING INSTALLATION.

4.011 REMOVE SCUPPER BOX AND DOWNSPOUT.

PLAN

NORTH

TRUE

NORTH

1/8" = 1'-0"1

DEMOLITION FLOOR PLANEXTERIOR CANOPY IMAGES

MEZZANINE IMAGES

07/31/20 TYPE B3 FINAL

2 03/03/21 ADDENDUM - 02

Hazardous Material Abatement Requirements Note: Material Code in parentheses after the note corresponds to Asbestos and Lead Pre-Renovation Inspection report by Environmental Management Consulting, Inc, October 8, 2019.

001 Existing door assumed to have asbestos containing material. Remove and dispose of in accordance with ACM abatement requirements. (MFD)

002 Abate Black and Yellow Carpet adhesive in room for asbestos containing material. (MCMLK)

003 Abate Gray and White Floor Tile and adhesive in room for asbestos containing material. (MF12YW)

004 Flooring may extend under gypsum and stud partition walls.

005 Abate Brown and Tan Floor Tile and adhesive (including door step) for asbestos containing material. (MF12NT)

006 Abate wall paneling black adhesive for asbestos containing materials.

Material is on back side of the wall paneling and furring strips in noted locations. The adhesive is adhered to various substrates including wood studs, drywall and concrete block, depending on the wall. (MPM(1))

007 Abate black adhesive on blue foam rigid insulation for asbestos containing material. Adhesive applied to exterior walls of rooms noted. (MPM(2))

008 Abate lead-based paint (cream colored paint) on CMU walls in room.

009 Abate lead-based paint (lime colored paint) on CMU walls in room.

010 Abate lead-based paint (White/green colored paint) on CMU walls in hangar bay.

011 Abate lead-based paint in maroon/gray floor striping on floor in hangar bay.

012 Abate lead-based paint (white paint) on metal door frame.

013 Abate lead-based paint (beige/green colored paint) on CMU walls in room.

014 Abate lead-based paint (red colored paint) on CMU walls in room.