This federal solicitation seeks competitive bids for construction services to alter an F-35 aircraft hangar at Dane County Regional Airport - Truax Field in Madison, Wisconsin. The project includes demolishing 19,913 square feet of hangar shop space to reconfigure areas for F-35 maintenance operations such as lavatories, offices, break rooms, mechanical spaces, and repair shops for wheel and tire, welding, egress, and structures. An additional 19,803 square feet of hangar space will be modified to accommodate F-35 aircraft, including high expansion foam fire suppression system modifications, aircraft make-up power and air systems, and lightning protection. The solicitation will result in a single firm fixed-price construction contract valued between $10-25 million. The North American Industry Classification code is 236220 with a size standard of $39.5 million average annual revenue. The contract duration is 365 days from notice to proceed. Bids are due by March 8, 2021 with award to the responsive and responsible lowest bidder. The Department of the Army National Guard is the issuing agency.

View the file

Other files for this federal contract opportunity

Other files attached to F-35 Alter Hangar 406, newest first.
File Type Posted
SF1419 Abstract of Offers - No Hubzone Preference.pdf PDF
W50S9F21B00010007.pdf PDF
406 Questions and Answers_142-143.pdf PDF
23 07 00_Add04.pdf PDF
W50S9F21B00010005.pdf PDF
C-121_Add03.pdf PDF
C-504_Add03.pdf PDF
34 71 13.19_Add03.pdf PDF
01 45 00.00 10_Add03.pdf PDF
22 31 00_Add03.pdf PDF
T-121 Add03.pdf PDF
F-001_Add03.pdf PDF
Asbestos and Lead Inspection.pdf PDF
Repair Roofs 406 Warranty Cert.pdf PDF
A-401_Add02.pdf PDF
04 20 00_Add02.pdf PDF
A-501_Add02.pdf PDF
A-601_Add02.pdf PDF
02 83 00_Add02.pdf PDF
01 14 00_Add02.pdf PDF
01 11 00_Add02.pdf PDF
406 Questions and Answers_26-112.pdf PDF
G-001_Add02.pdf PDF
E-101_Add02.pdf PDF
01 50 00_Add02.pdf PDF
12 21 00_Add02.pdf PDF
10 14 00.20_Add02.pdf PDF
05 40 00_Add02.pdf PDF
01 78 00_Add02.pdf PDF
W50S9F21B00010004.pdf PDF
G-011_Add02.pdf PDF
AD101_Add02.pdf PDF
07 27 26_Add01.R1.pdf PDF
A-131_Add01.R1.pdf PDF
C-121_Add01.R1.pdf PDF
W50S9F21B00010003.pdf PDF
10 22 39_Add01.R1.pdf PDF
W50S9F21B00010002.pdf PDF
B.07.406 Site Visit Sign In 19Feb21.pdf PDF
B.07.406 Site Visit Sign In 22Feb21.pdf PDF
Pre-Bid Slides - F-35 406.pptx PPTX presentation
W50S9F21B00010001.pdf PDF
ATTACHMENT 4-Justification and Approval Advantor.pdf PDF
ATTACHMENT 1-Truax F-35 B406 XGFG182008 Specs Vol 1 of 2 Dated 31 July 2020.pdf PDF
ATTACHMENT 5-Justification and Approval Andover.pdf PDF
W50S9F-21-B-0001.pdf PDF
ATTACHMENT 6-Justification and Approval Monaco.pdf PDF
ATTACHMENT 8-406 Submittal Log.xlsx XLSX spreadsheet
ATTACHMENT 9-SFS Form 12.xls XLS spreadsheet
ATTACHMENT 10-PRE-BID CONFERENCE AND SITE VISIT INSTRUCTIONS.pdf PDF
Show all 50

F-35 Alter Hangar 406 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6" VCP SW=852.99

6" VCP SE=852.99

S

D

D

S

B

B

B

S S

S

S

D

D

S

D

S

D

S

C

B

G

V

C

B

D

S

D

D

E

S

P

T

R

A

N

S

B

B

E

S

P

D

S

C

B

D

S

D

B

B

D

S

D

S

18" SS

B406 OPERATIONS

FFE=858.8

S

C

O

B

B

B

B

B

C B

63'

WELDING

EGRESS

WORKSHOP

EGRESS

SUPERVISOR

CORRIDOR

STRUCTURES

WORKSHOP

COMM

ELECTRIC

STRUCTURES

SUPERVISOR

METALS TECH

SUPERVISOR

HALL

METALS/

STRUCTURES

WORK ROOM

C O

R R

I D

O R

W&T

SUPERVISOR

MECHANICAL

WHEEL &

TIRE

WORKSHOP

FIRST

SERGEANT

RECEPTION/

OPEN OFFICE

SQUADRON

COMMANDER

TRAINING ROOM

BREAK ROOM

CORRIDOR

MEN'S

LOCKER

ROOM

MEN'S TOILET

STORAGE

CHIEFS'

OFFICE

EF LEAD

CMF

LEAD

CHIEFS'

OFFICE

JANITOR

MOTHER'S

ROOM

MECHANICAL

STORAGE

STORAGE

STORAGE

WOMEN'S

TOILET

WOMEN'S LOCKER

ROOM

CORRIDOR

DEPUTY

COMMANDER

COMPOSITE

MAINTENANCE

HANGAR BAY

VEST.

HALLWAY

HEF ROOM

EGRESS

STORAGE

METAL TECH

WORKSHOP

SA3

SA3

SA3

SA3

FC3

SA3SA3

FC3

SA3

SA3SA3

SA3

SA3

SA3

SA3

FC3

FC3

FC3

FC3

FC3

FC3FC3

SA3

SA3

FC3FC3

FC3

MA8MA8

FC3

FC3

FC3FC3

FC3

FC3

FC3 MA8MA8

MA8

MA8

MA8

MA8MA8

MA8

MA8 MA8

MA8

MA8

MA8

MA8

MA8MA8

MA8

MA8

MA8

MA8

FC3

23'-1" to structure

Approx. 24'-9" to structure

S

S

S V

S V

W

S S

SS

SS

S V

CO

CO

W

W

W

W

W

W

W

W

W

W

W

W

W

W

W

C O

B

B

B

B

S

SS

W

S

S

SS

SS

SS

SS S

S

B

S V

B

B

B

S S S

S

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

SS

B

B

B

W V

W V

REPLACE 6"

WATER LATERAL

12" AUTOMATED VALVES AND 12"

PIPING AT A 1% SLOPE OR

GREATER TO HOLDING TANK.

(SEE ELECTRICAL SHEET E-101)

(ADDITIVE BID ITEM 2A)

UNDERGROUND FIRE

FOAM HOLDING TANK

SEE DETAIL 2 ON SHEET

C501

INSTALL OIL \ WATER SEPARATOR,

ANCHOR DUE TO GROUNDWATER BUOYANCY

(SEE DETAIL 1 ON SHEET C501)

6" SANITARY LATERAL

INVERT = 854.47 AT THE WALL

WALL MOUNTED CONTROL

PANEL FOR AUTOMATED

VALVES (SEE ELECTRICAL SHEET 101)

CLEANOUT

CLEANOUT

4" AUTOMATED VALVE

(SEE ELECTRICAL SHEET

101)

PROJECT LIMIT

FOR BUILDING

ADD WATER LINE UP TO 45 LF 6" WATER

FROM HYDRANT TO LIMITS OF PAVEMENT

REPAIR AND CAP. EXTENSION WILL BE

CONSTRUCTED IN FUTURE PROJECT,

XGFG192005. CONTRACTOR SHALL

SURVEY LOCATION OF CAP AND PROVIDE

TO BASE AND ENGINEER FOR AS BUILT

RECORDS.

ADD WATER LINE UP TO 56 LF 6" WATER

FROM HYDRANT TO LIMITS OF

PAVEMENT REPAIR AND CAP.

EXTENSION WILL BE CONSTRUCTED IN

FUTURE PROJECT, XGFG192005.

CONTRACTOR SHALL SURVEY

LOCATION OF CAP AND PROVIDE TO

BASE AND ENGINEER FOR AS BUILT

RECORDS.

HS20 RATED WATERTIGHT

MANHOLE COVERS

12" SANITARY INLET

W/ 6" PVC OUTLET

PIPE 1' ABOVE GRADE

6" VENT

INSTALL 4" PVC SDR 35

AUTOMATED PUMP

(SEE ELECTRICAL

SHEET 101)

WALL MOUNTED CONTROL PANEL FOR TANK

PUMP (SEE ELECTRICAL SHEET 101)

2.5" WATER LATERAL

ADD VALVE FOR

BUILDING LATERALS

LIFT STATION MANHOLE

WITH EXPLOSION

PROOF PUMP (SEE DETAIL 3

ON SHEET 501)

RIM=857.92

INV EL=850.41

VALVE MANHOLE

RIM = 858.26

INV EL=850.82

CONNECT TO EXISTING MANHOLE

INV EL W = 853.54

EX INV EL= 852.54

6" AUTOMATED VALVE

(SEE ELECTRICAL SHEET 101)

(ADDITIVE BID ITEM 2B)

SANITARY SEWER CONNECTION,

LIFT STATION, AND VALVE

MAN HOLE CONNECTING THE TANK

TO THE EXISTING SANITARY SEWER

PIPING FROM LIFT STATION TO

EXISTING SANITARY MANHOLE

WALL MOUNTED CONTROL PANEL

FOR LIFT STATION (SEE ELECTRICAL

SHEET 101)

6" PVC PIPING OUTLET

6" VENT PIPING OUTLET

HYDRANT

HYDRANT

HYDRANT

HYDRANT

F.E.

F.E.

TRANS

B

BB

B

W

V

W

V

W

V

ADJUST CATCHBASIN RIM

RIM = 857.99

EX. RIM = 857.34

ADJUST RIM

RIM = 859.30

EX. RIM = 859.01

ADJUST RIM

RIM = 857.77

EX. RIM = 857.69

INSTALL 6" PVC SDR 26 LATERAL,

MATCH EXISTING INVERT AT MANHOLE,

CONNECT TO NEW PIPE FROM BUILDING,

0.4% MINIMUM SLOPE

REPLACE WITH

CATCHBASIN

GRATE COVER

ADJUST MANHOLE RIM

RIM = 858.30

EX. RIM = 857.79

6" INV SW= 852.99

6" INV NE = 852.99

6" INV SE= 852.99

32 LF 6" WATER

10 LF 6" WATER

SHEET CONTENTS

DO NOT SCALE DRAWINGS

ISSUED

SHEET NO.

KSF

KSD

KSD

NOT FOR CONSTRUCTION

3141300-190289.01

SHEET CONTENTS

DO NOT SCALE DRAWINGS

ANG NO:

M&H NO.:

DATE:

DESIGNED BY:

DRAWN BY:

CHECKED BY:

ISSUED

SHEET NO.

© Copyright 2020

This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead &

Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.

2440 Deming Way

Middleton, WI 53562 phone: 608-273-6380 meadhunt.com

Mead & Hunt, Inc.

07/31/20 TYPE B3 FINAL

M A

D I S

O N

W

I

T R

U A

X

F

I E

L D

A

N G

B

F

A

L T

E R

B

U I L

D I N

G

NOT FOR CONSTRUCTION

JULY 31, 2020

XGFG182008

2 03/03/21 ADDENDUM - 02

00 20 40

C-141

SITE UTILITIES PLAN

SITE UTILITY PLAN NOTES:

1. EXISTING UTILITIES WERE IDENTIFIED FROM THE OWNER'S UITILITY BASE MAP,

PREVIOUS CONSTRUCTION PLANS, AND LIMITED SITE OBSERVATIONS. ALL

UTILITY LOCATIONS SHALL BE CONFIRMED BY THE CONTRACTOR.

2. SHEETING AND / OR SHORING WILL BE REQUIRED FOR NEW HOLDING TANK AND

OIL/WATER SEPARATOR. GROUNDWATER REMOVAL WILL BE REQUIRED. THE

CONTRACTOR SHALL PROVIDE A SOIL SUPPORT AND GROUNDWATER REMOVAL

PLAN FOR APPROVAL PRIOR TO INSTALLATION.

TRUE

NORTH

PROPOSED LEGEND:

REMOVE GATE

REMOVE WATER

REMOVE SANITARY

REMOVE

SAW CUT PAVEMENT

ASPHALT REMOVAL

CONCRETE REMOVAL

GENERAL REMOVAL

//FNC//

//W//

//SS//

XXXXXXXXXXXXXXXXXXX

FLOW DIRECTION

EXISTING CONTOUR LINES

PROPOSED CONTOUR LINES

GRADING LIMITS

FINISHED / PROPOSED SPOT ELEVATION

FINISHED / PROPOSED SLOPE

xxx.x xxx.x xxx(.xx) xxx(.xx)

2%

3:1

CLEANOUT, SANITARY OR STORM

SANITARY SEWER MANHOLE

STORM SEWER ROUND CATCHBASIN

STORM SEWER SQUARE CATCHBASIN

SANITARY SEWER VALVE

WATER VALVE

SANITARY SEWER

WATER

BOLLARD

HYDRANT

CONCRETE

ASPHALT

CO

S

CB

W V

SS

W

B

STORM SEWER / CULVERT

STORM FLARED END SECTION

STORM SEWER MANHOLE

SD

D

AutoCAD SHX Text

6' X 10' SAFETY LOOP EXAMPLE FOR BEAM

AutoCAD SHX Text

6' X 10' SAFETY LOOP EXAMPLE FOR BEAM

AutoCAD SHX Text

B406 OPERATIONS FFE=858.8

AutoCAD SHX Text

CB

AutoCAD SHX Text

SV

File details come from the government source that posted it. Updated .