12 21 00_Add02.pdf

PDF 21 KB Posted

Attached to
F-35 Alter Hangar 406
Solicitation number
W50S9F-21-B-0001
Issued by

About this file

This document provides details for a federal construction contract opportunity to alter an F-35 aircraft hangar at Truax Field Air National Guard Base in Madison, Wisconsin. The project seeks to demolish nearly 20,000 square feet of existing hangar shop space and reconfigure the area for F-35 aircraft maintenance operations, including new lavatories, office space, break rooms, and repair shops. An additional nearly 20,000 square feet of existing hangar space will be modified to accommodate F-35 aircraft, including modifications to the high expansion foam fire suppression system, aircraft make-up power and air systems, and lightning protection. The solicitation will result in a single construction contract award for both demolition and new construction work, with two optional line items. The pre-bid conference is scheduled for February 16, 2021, with bids due by March 8, 2021. The contract duration is 365 days from notice to proceed. The NAICS code is 236220 and the magnitude is estimated between $10-25 million.

View the file

Other files

File Type Posted
SF1419 Abstract of Offers - No Hubzone Preference.pdf PDF
Abstract of Offers with Hubzone Preference.pdf PDF
W50S9F21B00010007.pdf PDF
W50S9F21B00010006.pdf PDF
23 07 00_Add04.pdf PDF
406 Questions and Answers_142-143.pdf PDF
406 Questions and Answers_113-141.pdf PDF
22 31 00_Add03.pdf PDF
F-102_Add03.pdf PDF
T-121 Add03.pdf PDF
E-101_Add03.pdf PDF
32 13 14.13_Add03.pdf PDF
F-001_Add03.pdf PDF
C-101_Add03.pdf PDF
01 50 00_Add03.pdf PDF
Specs TOC_Add03.pdf PDF
C-102_Add03.pdf PDF
21 13 18.00 10_Add03.pdf PDF
T-001 Add03.pdf PDF
W50S9F21B00010005.pdf PDF
01 45 00.00 10_Add03.pdf PDF
C-504_Add03.pdf PDF
34 71 13.19_Add03.pdf PDF
C-121_Add03.pdf PDF
AD101_Add02.pdf PDF
A-311_Add02.pdf PDF
G-001_Add02.pdf PDF
C-101_Add02.pdf PDF
10 14 00.20_Add02.pdf PDF
G-011_Add02.pdf PDF
A-301_Add02.pdf PDF
A-801_Add02.pdf PDF
406 Questions and Answers_26-112.pdf PDF
01 78 00_Add02.pdf PDF
01 50 00_Add02.pdf PDF
A-901_Add02.pdf PDF
A-201_Add02.pdf PDF
C-141_Add02.pdf PDF
Specs TOC_ Add02.pdf PDF
01 45 00.00 10_Add02.pdf PDF
10 28 13_Add02.pdf PDF
W50S9F21B00010004.pdf PDF
SD111_Add02.pdf PDF
E-501_Add02.pdf PDF
E-101_Add02.pdf PDF
A-101_Add02.pdf PDF
05 40 00_Add02.pdf PDF
02 83 00_Add02.pdf PDF
01 14 00_Add02.pdf PDF
01 11 00_Add02.pdf PDF
Show 40 more

Latest 50 of 86 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TRUAX FIELD ANGB - F-35: ALTER BLDG 406 Addendum 2

XGFG182008 03 MAR 2021

SECTION 12 21 00

WINDOW BLINDS

08/17

PART 1 GENERAL

1.1 SUMMARY

Provide window treatment, conforming to NFPA 701, complete with necessary brackets, fittings, and hardware. Provide each window treatment type as a complete unit in accordance with drawings. Mount and operate equipment in accordance with manufacturer's instructions. Completely cover windows to receive a treatment.

1.2 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 701 (2019) Standard Methods of Fire Tests for Flame Propagation of Textiles and Films

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation;

submittals not having a "G" designation are for Contractor Quality Control approval. Submittals with an "S" are for inclusion in the Sustainability eNotebook, in conformance to Section 01 33 29 SUSTAINABILITY REPORTING.

Submit the following in accordance with Section 01 33 00 SUBMITTAL

PROCEDURES

SD-02 Shop Drawings

Installation

SD-03 Product Data

Window Blinds; G

SD-04 Samples

Window Blinds; G

SD-10 Operation and Maintenance Data

Window Blinds; G

1.4 DELIVERY, STORAGE, AND HANDLING

Deliver components to the jobsite in the manufacturer's original packaging with the brand or company name, item identification, and project reference clearly marked. Store components in a dry location that is adequately ventilated and free from dust, water, or other contaminants and has easy

SECTION 12 21 00 Page 1

691jjb Highlight access for inspection and handling. Store materials flat in a clean dry area with temperature maintained above 50 degrees F. Do not open containers until needed for installation unless verification inspection is required.

1.5 WARRANTY

Provide manufacturer's standard performance guarantees or warranties that extend beyond a 1 year period.

PART 2 PRODUCTS

2.1 WINDOW BLINDS

Provide each blind, including hardware, accessory items, mounting brackets and fastenings, as a complete unit produced by one manufacturer. Unless otherwise indicated, all parts will be the same color and will match the color of the blind slat. Treat steel features for corrosion resistance.

Submit product data and samples of each type and color of window treatment. Provide slat samples 6 inch in length for each color.

2.1.1 Horizontal Blinds

Provide horizontal blinds with 1 inch slats. Blind units must be capable of nominally 180 degree partial tilting operation and full-height raising.

Blinds must be inside mount. Provide tapes for 2 inch slats with longitudinal reinforced vinyl plastic in 1-piece turn ladder construction.

Tapes for 1 inch slats must be braided polyester or nylon.

2.1.1.1 Head Channel and Slats

Provide head channel made of steel or aluminum with corrosion-resistant finish nominal 0.024 inch for 1 inch slats. Provide slats of aluminum, not less than 0.006 inch thick, and of sufficient strength to prevent sag or bow in the finished blind. Provide a sufficient amount of slats to assure proper control, uniform spacing, and adequate overlap. Enclose all hardware in the headrail.

2.1.1.2 Controls

A transparent tilting wand will be provided to tilt the slats, it will hang vertically by its own weight, and will swivel for easy operation. Provide a tilter control of enclosed construction. Provide moving parts and mechanical drive made of compatible materials which do not require lubrication during normal expected life. The tilter will tilt the slats to any desired angle and hold them at that angle so that any vibration or movement of ladders and slats will not drive the tilter and change the angle of slats. Include a mechanism to prevent over tightening. Provide a wand of sufficient length to reach to within 5 feet of the floor.

2.1.1.3 Intermediate Brackets

Provide intermediate brackets for installation, as recommended by the manufacturer, of blinds over 60 inch wide.

2.1.1.4 Bottom Rail

Provide bottom rail made of corrosion-resistant steel with factory applied finish. Provide closed oval shaped bottom rail with double-lock seam for

SECTION 12 21 00 Page 2 maximum strength. Bottom rail and end caps to match slats in color.

2.1.1.5 Braided Ladders

Provide braided ladders of 100 percent polyester yarn, color to match the slat color. Space ladders 15.2 slats per foot of drop in order to provide a uniform overlap of the slats in a closed position.

2.1.1.6 Hold-Down Brackets

Provide universal type hold-down brackets for sill or jamb mount where indicated on placement list.

2.2 COLOR

Provide color, pattern and texture selected from manufacturer's standard colors

PART 3 EXECUTION

3.1 EXAMINATION

After becoming familiar with details of the work, verify all dimensions in the field, and advise the Contracting Officer of any discrepancy before performing the work.

3.2 INSTALLATION

Do not install building construction materials that show visual evidence of biological growth.

Submit drawings showing fabrication and Installation details. Show layout and locations of track, direction of draw, mounting heights, and details.

Provide Manufacturer's Instructions and Operation and Maintenance Data.

Perform installation of window blinds in accordance with the approved detail drawings and manufacturer's installation instructions. Install units level, plumb, secure, and at proper height and location relative to window units. Provide and install supplementary or miscellaneous items in total, including clips, brackets, or anchorages incidental to or necessary for a sound, secure, and complete installation. Do not start installation until completion of room painting and finishing operations.

3.3 CLEAN-UP

Upon completion of the installation, inspect window treatments for soiling, damage or blemishes; and adjust them for form and appearance and proper operating condition. Repair or replace damaged units as directed by the Contracting Officer. Isolate metal parts from direct contact with concrete, mortar, or dissimilar metals. Ensure blinds installed in recessed pockets can be removable without disturbing the pocket. The entire blind, when retracted, must be contained behind the pocket. For blinds installed outside the jambs and mullions, overlap each jamb and mullion 0.75 inch or more when the jamb and mullion sizes permit. Include all hardware, brackets, anchors, fasteners, and accessories necessary for a complete, finished installation.

-- End of Section --

SECTION 12 21 00 Page 3

THIS PAGE INTENTIONALLY LEFT BLANK

SECTION 12 21 00 Page 4

File details come from the government source that posted it. Updated .