A-501_Add02.pdf
PDF 273 KB Posted
- Attached to
- F-35 Alter Hangar 406 Federal contract opportunity
- Solicitation number
- W50S9F-21-B-0001
- Issued by
- Department of the Army National Guard
About this file
This document summarizes a federal solicitation for construction services to alter an F-35 aircraft hangar. The solicitation will result in a single firm fixed-price contract to demolish 19,913 square feet of hangar shop space and reconfigure the area for F-35 aircraft maintenance at Dane County Regional Airport - Truax Field in Madison, Wisconsin. Work includes modifications to 19,803 square feet of hangar space for aircraft make-up power and air systems, and upgrades to mechanical, plumbing, electrical, and security systems. A pre-bid conference will be held on February 16, 2021 with bids due by March 8, 2021. The contract duration is 365 days with a magnitude between $10-25 million. The North American Industry Classification code is 236220 and options are included for additional work. Brand name products will be required and a Small Business Subcontracting Plan from large businesses. The solicitation and plans are available at beta.SAM.gov.
View the file
Other files for this federal contract opportunity
Show all 50
F-35 Alter Hangar 406 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXTERIOR INSULATION AND
FINISHING SYSTEM (EIFS)
WALL AS SCHEDULED
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
DOOR FRAME (GROUT SOLID)
DOOR (SEE SCHEDULE)
D O
O R
O P
E N
IN
G
CONTINUOUS 1/4"
DRIP EDGE
CONTINUOUS SEALANT
AND BACKER ROD
3"
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
JAMB ANCHORS, PER
MANUFACTURER REQUIREMENTS
EXTERIOR INSULATION AND
FINISHING SYSTEM (EIFS)
DOOR FRAME (GROUT SOLID)
DOOR (SEE SCHEDULE)
DOOR OPENING
1/4"
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
EXTERIOR INSULATION AND
FINISHING SYSTEM (EIFS)
ALUMINUM WINDOW
GROUT ADJACENT
CORE SOLID
(SEE STRUCTURAL)
SHIM AS REQUIRED
SOLID SURFACE SILL,
SSM-2 TYPICAL
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
EXTERIOR INSULATION AND
FINISHING SYSTEM (EIFS)
ALUMINUM WINDOW
SHIM AS REQUIRED
METAL FLASHING W/ 1/4" DRIP
EDGE AT WINDOW HEAD
ALUMINUM WINDOW
EXISTING EXTERIOR
INSULATION AND FINISHING
SYSTEM (EIFS)
EXISTING WALL
EXISTING LINTEL
CONTINUOUS SEALANT
AND BACKER ROD
(BOTH SIDES)
SHIM AS REQUIRED
3" 4 1/2"
METAL FLASHING AT WINDOW HEAD
ALUMINUM WINDOW
EXISTING EXTERIOR
INSULATION AND FINISHING
SYSTEM (EIFS)
EXISTING WALL
STEEL LINTEL, SEE STRUCTURAL
CONTINUOUS SEALANT AND
BACKER ROD (BOTH SIDES)
3" 4 1/2"
METAL FLASHING
AT WINDOW SILL. SLOPE AWAY
FROM WINDOW. PROVIDE
1/4" METAL DRIP EDGE
ALUMINUM WINDOW
EXISTING EXTERIOR
INSULATION AND FINISHING
SYSTEM (EIFS)
WALL AS SCHEDULED
CONTINUOUS SEALANT AND
BACKER ROD (BOTH SIDES)
EXTERIOR INSULATION AND
FINISHING SYSTEM (EIFS),
MATCH EXISTING
SHIM AS REQUIRED
SOLID SURFACE SILL,
SSM-2 TYPICAL
SEALANT AND BACKER ROD
T.O. PC SILL
104'-0"
ALUMINUM
WINDOW SYSTEM
3" 4 1/2"
BACKER ROD AND
SEALANT, TYP.
PRE-FINISHED METAL SILL
FLASHING WITH HEMMED
EDGE, SET IN SEALANT SOLID SURFACE
SILL, SSM-2
TYPICAL
SEALANT AND
BACKER ROD
EXISTING CMU.
CAST STONE SILL
SILL ANCHORS AND
FASTENERS BY CAST
STONE SUPPLIER
1/2"
CONT. SEALANT
SHIM AS
REQUIRED
CONTINUOUS RIGID
INSULATION
VAPOR BARRIER
SUPPORT ANGLE
GALVANIZED
SCREWS
INDUSTRIAL ADHESIVE
FIELD VERIFY SILL DIMENSIONS
1" NOMINAL MASONRY
VENEER OVER MORTAR
BED OVER SCRATCH
COAT OVER METAL LATH
OVER CONTINUOUS
INSULATION
OVERHEAD COILING DOOR
METAL HOOD ENCLOSURE
EXTERIOR INSULATION AND
FINISHING SYSTEM (EIFS)
3/16" STEEL PLATE (PAINTED)
(SEE STRUCTURAL)
INSULATED COILING DOOR
(SEE SCHEDULE)
WEATHERSEAL
CONTINUOUS 1/4" DRIP
EDGE
T.O. OPENING
AS SCHEDULED
WALL AS SCHEDULED
CONTINUOUS SEALANT
AND BACKER ROD
PREFINISHED METAL
DRIP FLASHING WITH
HEMMED EDGE SET IN
SEALANT
PRECAST SILL BLOCK
EXISTING CMU
3" EIFS WALL SYSTEM
(INSTALLED PER
MANUFACTURER'S
RECOMMENDATIONS)
T.O. PC SILL
104'-0"
1" 1 3/8"
3"
CONTINUOUS RIGID
INSULATION
VAPOR BARRIER
SUPPORT ANGLE,
COORDINATE WITH
STRUCTURAL
SEALANT WITH BACKER
ROD AND WEEP TUBES
EVERY 24"
DRAINAGE STRIP
SET IN ADHESIVE
TROWELED ADHESIVE
TO PROMOTE
DRAINAGE
SELF-ADHERED
MEMBRANE FLASHING
INDUSTRIAL ADHESIVE
3 3/8"
7/8"
GALVANIZED SCREWS
1" NOMINAL MASONRY
VENEER OVER MORTAR
BED OVER SCRATCH
COAT OVER METAL LATH
OVER CONTINUOUS
INSULATION
FIRST FLOOR
100'-0"
1" NOMINAL MASONRY
VENEER OVER MORTAR
BED OVER SCRATCH
COAT OVER METAL LATH
OVER CONTINUOUS
INSULATION EXISTING CMU
CONCRETE
FOUNDATION, SEE
STRUCTURAL
CONCRETE SLAB
ON GRADE,
SEE STRUCTURAL
METAL BOTTOM TRACK
OR BACK WRAP EIFS AT
BOTTOM EDGE
1/2" ISOLATION JOINT
WITH SEALANT
2" THICK RIGID
FOUNDATION AND
UNDER SLAB
INSULATION. UNDER
SLAB INSULATION
MINIMUM 4' WIDE.
VAPOR BARRIER
PROVIDE 4" AT GRADE
AND 2" AT PAVEMENT
SLOPE GRADE AWAY
FROM FOUNDATION
WALL
WATER
RESISTANT BASE
COAT
EIFS FINISH
SEALANT WITH BOND
BREAKER
METAL DRIP EDGE
EXISTING CMU
3" EIFS WALL SYSTEM
(INSTALLED PER
MANUFACTURER'S
RECOMMENDATIONS)
CONTINUOUS RIGID
INSULATION
VAPOR BARRIER
1 5/8" METAL STUD
FURRING
5/8" GYPSUM
1" NOMINAL MASONRY
VENEER OVER MORTAR
BED OVER SCRATCH
COAT OVER METAL LATH
OVER CONTINUOUS
INSULATION
EXISTING CMU
CONTINUOUS RIGID
INSULATION
VAPOR BARRIER
3 5/8" METAL STUD
FURRING
5/8" GYPSUM
1" NOMINAL MASONRY
VENEER OVER MORTAR
BED OVER SCRATCH
COAT OVER METAL LATH
OVER CONTINUOUS
INSULATION
EXISTING CMU
3 5/8" METAL STUD
FURRING
5/8" GYPSUM
EXISTING CMU
3 5/8" METAL STUD
FURRING
5/8" GYPSUM
/8
V E
R
IF
Y I N
F
IE
L D
/8
/8
3 5/8"
VERIFY IN FIELD
1'-3 1/4" 4 3/8"
EXISTING STEEL
COLUMN
EXISTING CMU
3 5/8" METAL STUD
FURRING
5/8" GYPSUM
3 5/8"
VERIFY IN FIELD
2'-0" 3 5/8"
/8
V E
R
IF
Y I N
F
IE
L D
/8
EXISTING STEEL COLUMN
1 1/2" METAL
WALL PANEL
FASTENED TO
EXISTING
SUPPORTS
EXISTING
STRUCTURE
EXISTING 1"
INSULATION
EXISTING METAL
PANEL
SUPPORTS
EXISTING 3" IMP
PREFINISHED METAL
DRIP FLASHING WITH
HEMMED EDGE SET IN
SEALANT
NEW FASCIA PANEL,
MATCH ADJACENT
CANOPY PANELS
FOR HEIGHT AND
COLOR
DOOR BRUSH SEAL
1 1/2" METAL
WALL PANEL
3" RIGID INSULATION
EXISTING
STRUCTURE
EXISTING 1"
INSULATION
EXISTING
HANGAR DOOR
NEW SUPPORT
STRUCTURE, SEE
STRUCTURAL
DRAWINGS
EXISTING 3"
IMP
METAL LINER PANEL
INSULATED COILING DOOR
(SEE SCHEDULE)
COILING DOOR JAMB
AND MOUNT
WALL AS SCHEDULED
THERMAL BREAK
EXTERIOR INSULATION AND
FINISHING SYSTEM (EIFS)
3/16" STEEL PLATE (PAINTED)
(SEE STRUCTURAL)
CONTINUOUS SEALANT
CMU WALL AS
SCHEDULED
1" GYPSUM LINER PANEL
2 LAYERS 5/8" TYPE "X" RATED
GYPSUM WITH STAGGERED
JOINTS
C-H STUD 24" O.C. MAX
J RUNNER
CEILING AS SCHEDULED
2-HR HORIZONTAL RATED ASSEMBLY
ALL JOINTS FINISHED
SHEET NO.:
SHEET CONTENTS
DO NOT SCALE DRAWINGS
M&H NO.:
DATE:
DESIGNED BY:
DRAWN BY:
CHECKED BY:
ISSUED
© Copyright This document, or any portion thereof, shall not be duplicated, disclosed, or used on any other project or extension of this project except by written agreement with Mead & Hunt, Inc. Mead & Hunt shall not be responsible for any unauthorized use of, or alteration to these documents.
Mead & Hunt, Inc.
2440 Deming Way
Middleton, WI 53562 phone: 608-273-6380 meadhunt.com
/3
/2
:1
:4
P M
C R e v it L o c a l\
-1
.0
-A
-C e n tr a l-p jc
.r v t
T R
U A
X F
IE
L D
A N
G B
M A
D
IS
O N
W
I
F -3
A L T
E R
B U
IL
D
IN
G
A-501
DETAILS
XGFG182008ANG NO.:
3141300-190289.01
BAE
JJB
July 31, 2020
PJC
1 1/2" = 1'-0"8
EXTERIOR DOOR HEAD
1 1/2" = 1'-0"9
EXTERIOR DOOR JAMB
1 1/2" = 1'-0"6
WINDOW JAMB
1 1/2" = 1'-0"11
WINDOW HEAD AT EXISTING JAMB
1 1/2" = 1'-0"10
WINDOW HEAD AT EXISTING LINTEL
1 1/2" = 1'-0"5
WINDOW HEAD
1 1/2" = 1'-0"7
WINDOW SILL
1 1/2" = 1'-0"12
EXT WINDOW SILL
1 1/2" = 1'-0"17
EXTERIOR COILING DOOR HEAD
1 1/2" = 1'-0"13
EIFS TO STONE TRANSITION
1 1/2" = 1'-0"14
BASE OF WALL
1" = 1'-0"1
ENLARGED PLAN DETAIL
1" = 1'-0"2
ENLARGED PLAN DETAIL
1" = 1'-0"4
ENLARGED PLAN DETAIL
1" = 1'-0"3
ENLARGED PLAN DETAIL
1 1/2" = 1'-0"15
METAL PANEL REPLACEMENT
1 1/2" = 1'-0"16
METAL PANEL AT DOOR OPENING
1 1/2" = 1'-0"18
EXTERIOR COILING DOOR JAMB
07/31/20 TYPE B3 FINAL