R-P693_Drawings_Final_Vol14.7_20241007.pdf

PDF 13 MB Posted

Attached to
FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM
Solicitation number
N6274225R1301
Issued by

About this file

This is a volume of drawings (Volume 14.7) related to solicitation N6274225R1301 for the construction of a Guam Defense Radar System Command Center and associated facilities at Joint Region Marianas, Guam. While the file itself contains technical drawings, the associated solicitation provides details for a $250-500M design-bid-build project that includes construction of a command center, power generation facility, switchgear building, fuel storage facility, and entry control facility.

The project requires Risk Category IV construction with specific seismic requirements including base isolation, and includes specialized elements such as a 150-foot galvanized steel antenna tower, security infrastructure for SSL-C and IESS systems, and complex control system integration. The contract includes five pre-priced options related to generators, fuel tanks, and UPS systems. The completion period is 1,323 calendar days, with proposals due by October 30, 2024. The solicitation is unrestricted under NAICS 236220, with technical evaluation factors including Experience, Small Business Utilization, Safety, Management Plan, and Past Performance. A pre-proposal site visit is scheduled for December 11, 2024, with required base access forms due by November 14, 2024.

View the file

Other files

File Type Posted
25-1301 CmdCtrl Notice14.pdf PDF
Am-0011 Attachments 25-44.pdf PDF
Am-0011 Attachment 1_Revised Drawings dtd 1-28-2025.pdf PDF
Am-0011.pdf PDF
Am-0011 Attachments 2-24.pdf PDF
25-1301 CmdCtrl Notice13.pdf PDF
25-1301 CmdCtrl Notice12.pdf PDF
25-1301 CmdCtrl Notice11.pdf PDF
Am-0010 Attachment 2_Revised Drawings_Signed.pdf PDF
Am-0010.pdf PDF
25-1301 CmdCtrl Notice10.pdf PDF
25-1301 CmdCtrl Notice9.pdf PDF
Attachment 1_Revised Drawings_dtd 13 and 20 Dec 2024.pdf PDF
Am-0009.pdf PDF
Am-0008.pdf PDF
25-1301 CmdCtrl Notice8.pdf PDF
P693_Sign-in Sheets_Redacted.pdf PDF
Am-0007.pdf PDF
Am-0007 Attachment 1_Revised Drawings dtd 13 Dec 2024.pdf PDF
Am-0006 Attachment 1_Revised Drawings dtd 6 Dec 2024.pdf PDF
Am-0006.pdf PDF
25-1301 CmdCtrl Notice7.pdf PDF
Am-0005 Attachment 1_Revised Drawings dtd 11-22-2024.pdf PDF
Am-0005.pdf PDF
25-1301 CmdCtrl Notice6.pdf PDF
25-1301 CmdCtrl Notice5.pdf PDF
R-P693_Drawings_Final_Vol14.6_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.5_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.8_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.2_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.1_20241007.pdf PDF
25-1301 CmdCtrl Notice4.pdf PDF
R-P693_Drawings_Final_Vol14.4_20241007.pdf PDF
Am-0004 Attachment 1_Revised Drawings dtd 11-15-2024.pdf PDF
25-1301 CmdCtr Notice3.pdf PDF
Am-0004.pdf PDF
Am-0003.pdf PDF
Am-0003 Attachment 1_Revised Drawings dtd 11-8-2024.pdf PDF
25-1301 CmdCtrl Notice2.pdf PDF
Am-0002.pdf PDF
Am-0001.pdf PDF
25-1301 CmdCtrl Notice1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.7_20241007.pdf PDF
P693_Drawings_Final_Vol14.3_20241007.pdf PDF
25-1301 P-693 RFP.pdf PDF
P693_Specs_Final_Vol02_20241007.pdf PDF
P693_Drawings_Final_Vol14.6_20241007.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

07-OCT-2024

Approved By

CAPT Troy Brown, JRM J4 via email

9/24/2024

10/17/2024

07-OCT-2024

CAPT Troy Brown, JRM J4 via email

CAPT Troy Brown, JRM J4 via email via email via email via email via email via email via email via email

16 GAUGE, 316L STAINLESS STEEL

SHEET METAL WALL SLEEVE

COMPLETE WITH FORMED FLANGE

FOR CONNECTING ISOLATION

DAMPER.

LOUVER (SEE

ARCHITECTURAL SET)

DUCT SIZE AS TAGGED

ISOLATION DAMPER WHERE INDICATED

TRANSITION AS REQUIRED

MINIMUM 1" RETURN BRAKE ON WALL SLEEVE FLANGE

ALTERNATIVE ACTUATOR POSITION IF

JACKSHAFT IS REQUIRED FOR DAMPER.

EXTERIOR WALL

FLEX CONN. (TYP)

MOUNTING BRACKETS

REFER TO STRUCTURAL SET FOR

DETAILS OF SUPPORTS MOTOR MOUNT IF

BELT-DRIVE

DUCT MOUNT FAN

DUCT

AIRFLOW

HIGH PRESSURE SENSING

TUBE IN AIRSTREAM

LOW PRESSURE SENSING

TUBE IN AIRSTREAMDIFFERENTIAL

PRESSURE AIR

PROVING SWITCH 1/4" PRESSURE TUBING (TYP)

* FAN STATUS VIA DIFFERENTIAL PRESSURE AIR PROVING SWITCH

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

OUTSIDEINSIDE

ISOLATION DAMPER PER PLAN DRAWING

END CAP

HORIZONTAL DUCT. SEE

PLAN FOR DIMENSION

LOUVER

OUTSIDE WALL

45 DEGREE TAP INTO

HORIZONTAL DUCT

VERTICAL DUCT. MATCH FAN

OUTLET DIMENSION.

FLEXIBLE CONNECTION

PROVIDE MOTOR SLIDE BASE

ELECTRICAL CONNECTION

FAN SHEAVE

STRUCTURAL STEEL ANGLE FRAME

INTEGRAL FROM FACTORY WITH ARR. 3F

EXTENSION FOR MOTOR MOUNT. PROVIDE

FACTORY STANDARD PAINT COAT.

CENTRIFUGAL SCROLL

FAN PER PLANS AND

SCHEDULE

SEISMIC SPRING ISOLATORS

PILLOW BLOCK

BEARINGS BOTH SIDES

AIRFLOW

V-BELT (PROVIDE OSHA BELT GUARD)

MOTOR SHEAVE

REFER TO

STRUCTURAL SET FOR

DETAILS OF SUPPORTS

SUPPLY AIR FREE

DISCHARGE TO

SPACE

ELEVATION VIEW

DISCONNECT SWITCH

HOT GAS REHEAT COIL

DX COOLING COIL

FINAL FILTER

PRE-FILTER

ISOLATION DAMPER

CONDENSATE DRAIN CONNECTION

DUCTED INLET

OA

DUCT

FLEX CONNECTION

DIRECT-DRIVE SUPPLY FAN

21" MIN

CONDENSATE DRAIN

CONNECTION

PROVIDE STRUCTURAL

RAIL OR FORMED METAL

CURB DESIGNED TO MEET

THE SEISMIC LOADING

CRITERIA (SEE NOTE 1).

HOUSEKEEPING PAD

FLOOR

AHU

(2)

(2)

1. AS REQUIRED TO ACHIEVE THE INDICATED CONDENSATE DRAIN CONNECTION HEIGHT.

2. ATTACHMENT METHOD AS REQUIRED TO MEET SEISMIC LOADING CRITERIA.

NOTES:

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:1

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-501

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

D

ET

AI

LS

MAM

17324526

MGP THF

G

UA

M

PP

-M -5

FINAL DESIGN SUBMITTAL

SCALE: NTSC1 EXTERIOR WALL DUCT PENETRATION DETAIL

SCALE: NTSA1 EXHAUST FAN SUPPORT DETAIL - INLINE

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET NAMING CONVENTION

SCALE: NTSB3 CLEAN AGENT EXHAUST FAN DETAIL

SCALE: NTSB1 MAKEUP AIR UNIT DETAIL

SCALE: NTSA3 AHU CONDENSATE DRAIN HEIGHT DETAIL

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

Approved By

CAPT Troy Brown, JRM J4 via email

DUCT

SHEET METAL AS

SPECIFIED FOR

DUCTWORK

SHEET METAL

SCREW

1-1/2" POCKET

SLIP

ALTERNATE POSITION OF BOLT

1" FLANGE AND HEM

BOLT ON 4" CENTERS

1"x1/8" BAND IRON

FLANGED

CONNECTION

ON FAN SIDE

WASHER

FLEXIBLE MATERIAL

AS SPECIFIED

2" MIN TO 4" MAX

INSTALLED. 6" WITH

MATERIAL TAUT

NOTE:

1. EXAMPLE ABOVE IS FOR TWO DIFFERENT PRESSURE CLASSES. FOLLOW APPROPRIATE SEALING REQUIREMENTS PER STANDARDS.

MAIN DUCT

MAIN DUCT

1" MIN ON TOP

AND BOTTOM

1/4" BRANCH DUCT

WIDTH, BUT MIN 4"

ADJUSTABLE

ELBOW RINGS

EQUAL TO REQUIRED

BRANCH DUCT DIA

SEAL ALL

AROUND

1" MIN ON TOP AND BOTTOM

SUPPLY

AIRFLOW

SEAL ALL

AROUND

30°

BALANCING DAMPER WHERE INDICATED

ON DRAWINGS. MINIMUM OF 1 DUCT

DIAMETER FROM MAIN DUCT.

-45°

PANEL IS DUCT GAGE (MIN) WITH SCREWS

AT 7 7/8" MAX SPACING.

S = SIDE OPPOSITE HINGES, T = TOP, B = BOTTOM

NO. HINGES

DOOR SIZE

2-S 2-S

NO. LOCKS

1-S

FRAME 1 HINGE POS. 1

ACCESS PANEL

DUCT

LOCK TYPE 1

VIEW PORT IF SPECIFIED

BUTT HINGE 25x25, OR PIANO HINGE

SASH LOCK

500 PA STATIC AND LESS

(INCHES)

11 13/16" x 11 13/16" 15 3/4" x 19 11/16" 23 5/8" x 23 5/8"

" M

AX

IM

U M

THERMOSTAT

TYP FOR ALL

THERMOSTATS

INSTALLED

CEILING

NOTE: THERMOSTAT PLACEMENT NOT HIGHER

THAN 48" AT OPERABLE PORTION OF DEVICE.

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

BOTTOM OF 10" PIPE

CLOSED END WITH 2"ø

DRAIN HOLE

WELD 2" DRAIN PIPE

STD. TEE OPEN THIS SIDE

WELD 2" DRAIN PIPE TO 10"

EXHAUST PIPE. 3 INCH

FILLET MINIMUM.

CONNECT 10"ø 316L SS

EXHAUST DUCT TO 10"

316L SS SCHEDULE 40S

PIPE VIA BUTT JOINT

CLAMP OR OTHER

EFFECTIVE MEANS

DUCT TRANSITION AS

NEEDED

10"ø EXHAUST DUCT

316L STAINLESS STEEL

SCH.40S TYP.

ISOLATION DAMPER

REFER TO ARCHITECTURAL

DRAWINGS FOR INFORMATION

ON PENETRATION SEAL

316L STAINLESS SLEEVE

EXHAUST DUCT

316L STAINLESS STEEL

SCH.40S PIPE TYP.

STRUCTURAL BRACING

BUILDING OUTSIDE WALL

ROOF GUTTER

ROOF

WELDED FITTINGS (TYP)

OPEN

10"X6" CONCENTRIC

REDUCER

6'

0"

TOP OF STACK

ROOF LINE

PLAN LOOKING NORTH

STD. SHORT RADIUS

ELBOW TYP.

CLOSED END OF 2" PIPE

WELDED FITTINGS (TYP)

WELDED FITTINGS (TYP)

LOOKING EAST

BUILDING OUTSIDE WALL

STD. SHORT RADIUS

316L STAINLESS STEEL SCH.40S

PIPE TYP.

316L STAINLESS SLEEVE

EXHAUST STACK

STRIAGHT UP

1'

8"

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

/2

/2

9:

:4

AM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-502

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

D

ET

AI

LS

MAM

17324527

MGP THF

G

UA

M

PP

-M -5

FINAL DESIGN SUBMITTAL

SCALE: NTSB1 FLEXIBLE CONNECTION - RECTANGULAR

SCALE: NTSC1 DUCTWORK BRANCH TAKEOFF FITTING DETAIL

SCALE: NTSA1 DUCT ACCESS DOOR DETAIL

SCALE: NTSA3 THERMOSTAT ELEVATION DETAIL

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET NAMING CONVENTION

SCALE: NTSB3 EXTERIOR BATTERY EXHAUST STACK DETAIL

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

Approved By

CAPT Troy Brown, JRM J4 via email

FOR

FOS

OSHA TANK ACCESS LADDER AND PLATFORM

SEE SPECIFICATION 33 56 10.00 14

FOR DETAILS

FOR BULK STORAGE TANK EQUIPMENT PAD

ELEVATION SEE STRUCTURAL DRAWINGS

PIPE SUPPORT

DOUBLE WALLED BALLISTIC

RATED FUEL OIL TANK

ACCESS MANWAY 24" DIAMETER

1/2"

3/8"

UNION PSV

(SEE NOTE 1)

FOS, FOR

(SEE NOTE 1)

DIRECTION OF RELIEF

TO STORAGE TANKS BALL OR PLUG VALVE

(AS INDICATED)

NOTES:

1. VALVE MUST HAVE REMOVABLE HANDLE.

NO NO

SET @

25 PSIG

6" 6"

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

SLEEVE

ACCESS PLATE

BRANCHING CONNECTOR

ACCESS PORT CAP

CONCRETE SLAB

SAND UNDERGROUND DOUBLE

WALL FUEL PIPE

6" ACCESS PIPE

RECOMMENDED

LEAK DETECTION

CABLE (FUEL)

AP

PR

OX

3'

-1 1"

FOS FOS

NOTES:

1. ALL PIPING TO BE LINE SIZE

DUAL STAGE DIESEL

FUEL FILTER

FILTER REMOVABLE

ACCESS (TYP)

VARIABLE LENGTH COLUMN PIPE

CHECK VALVE

BYPASS RELIEF VALVE

PUMP MOTOR ASSEMBLY

CONNECTION KIT

PUMP/MOTOR

MOTOR OPERATED VALVE

THERMAL RELIEF VALVE

POWER WIRING

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:2

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-503

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

D

ET

AI

LS

MAM

17324528

BJE THF

G

UA

M

PP

-M -5

FINAL DESIGN SUBMITTAL

013SCALE: NTSA1 FUEL OIL BULK TANK DETAIL

SCALE: NTSD3 THERMAL RELIEF PIPING

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET KEYNOTES

SHEET NAMING CONVENTION

01. BELOW GRADE PIPING MUST BE DOUBLEWALL PIPE WITH

OUTER PIPE THROUGH STUB UPS. DOUBLE WALL PIPE

INCLUDES LEAK DETECTION CABLE.

SCALE: NTSA3 ACCESS PORT DETAIL

SCALE: NTSC3 FUEL FILTER

SCALE: NTSC1 FUEL OIL SUBMERSIBLE PUMP DETAIL

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

Approved By

CAPT Troy Brown, JRM J4 via email

PROVIDE TRANSITION FROM

TERMINAL TO DUCTWORK

VAV OR CV

TERMINAL

PROVIDE A MINIMUM OF FOUR DUCT

DIAMETERS OF STRAIGHT DUCT

PROVIDE BALANCING DAMPER

AT EACH FLOOR TAKE-OFF

SU

PP

LY

D

UC

T

MA

IN

LINEAR SLOT, LINEAR BAR

OR FLOW BAR DIFFUSER

SUPPLY DUCT RISER

EQUAL LENGTH

BRANCH DUCTS TO

SUPPLY AIR OUTLETS

SUPPLY DUCT BRANCH

RIGID DUCTFLEX DUCT

(5'-0" MAX)

SUPPLY

GRILLE/

REGISTER

SIZE BY CFM

PROPORTION

NOTES:

1. REFER TO HVAC FLOOR PLANS FOR DUCT SIZES.

2. REFER TO SCHEDULES FOR GRILLES, REGISTERS, DIFFUSERS AND TERMINAL SIZES AND TYPES.

3. PROVIDE A MANUAL TYPE BALANCING DAMPER FOR EACH SUPPLY OUTLET, RETURN INLET, AND EXHAUST INLET.

4. ALL DUCT RUNOUTS TO DIFFUSERS MUST BE THE SAME SIZE AS DIFFUSER NECK SIZE, UNLESS OTHERWISE NOTED.

5. FLEX DUCT WILL NOT BE ALLOWED ON RETURN OR EXHAUST DUCTWORK SYSTEMS.

6. PROVIDE 12" AIR CUSHION AT THE END OF EACH SUPPLY MAIN AND BRANCH DUCT.

7. INDIVIDUAL BRANCH BALANCING DAMPERS NOT REQUIRED FOR SUPPLY OR EXHAUST REGISTERS.

CEILING

DIFFUSER

SUPPLY DUCT BRANCH

SU

PP

LY

D

UC

T

MA

IN

RETURN DUCT RISER

RE

TU

RN

D

UC

T

MA

IN

RETURN

DUCT BRANCH

RETURN

GRILLE

CEILING

GRILLE

OPEN ENDED

RETURN AIR

BRANCH DUCT

PROVIDE 1-1/2 RADIUS ELBOWS

FOR ALL DUCTWORK SYSTEMS

WHEREVER SPACE ALLOWS

PROVIDE 90° ELBOWS

W/ TURNING VANES IF

RADIUS ELBOWS WILL

NOT FIT

EXHAUST

REGISTER

EX

HA

US

T

DU

CT

M

AI

N

EXHAUST

DUCT BRANCH

EXHAUST DUCT RISER

30° MIN

SUPPLY

AIR FLOW

DUCT TO MATCH REGISTER FLANGE

OUTSIDE DIMENSIONS

REGISTER

PLAN VIEW

RETURN OR EXHAUST

AIR FLOW

6" M

IN

BALANCING DAMPER

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

NOTES:

1. FOLLOW DAMPER MANUFACTURER'S INSTRUCTIONS, INCLUDING FASTENER OPTIONS AND GAUGES FOR SLEEVE AND PERIMETER ANGLES. COORDINATE MANUFACTURER'S INSTALLATION INSTRUCTIONS WITH STRUCTURAL WALL

PENETRATION OPENINGS.

2. ACCESS DOORS: SIZE AND LOCATION TO PERMIT SERVICING EACH FUSIBLE LINK OR LINKS. PROVIDE 24"x24" ACCESS DOORS MINIMUM OR DUCT WIDTH MINUS 2"x24" WHICHEVER IS LARGER.

DUCTWORK AS

REQUIRED ON

PLANS

INSULATION AS

REQUIRED

MULTI-BLADE FIRE

DAMPER W/ V STYLE

BLADES

BEAD OF ACOUSTIC/

FIRE-RATED SEALANT

(MAY BE ON EITHER

SIDE OF DAMPER

FRAME)

FIRE BARRIER

PARTITION OR

CHASE (WALL

MATERIAL WILL

VARY, REFER TO

STRUCTURAL AND

ARCH DRAWINGS)

BEAD OF ACOUSTIC/

FIRE-RATED SEALANT

AROUND EDGES

1/2" CLEARANCE MIN TOP

AND SIDES FOR VERTICAL

INSTALLATION, AND 1/2"

CLEARANCE MIN ALL

AROUND FOR

HORIZONTAL

INSTALLATIONS (1/8" PER

FOOT OF DUCT

DIMENSION)

1/8" NEOPRENE

GASKET (ALL

AROUND)

ACCESS DOOR

(NOTE 2)

MINIMUM EDGE DISTANCE =

5 ANCHOR DIAMETERS

INSULATE WITH

VAPOR BARRIER

UNION

DRAIN PAN

CAP

CALCULATION PROCESS

WHERE X = TSP

UNIT TYPE A B

DRAW

THRU

BLOW

THRU

2" PLUS X X

1" MINIMUM 2X

FLOOR

PITCH AT LEAST 1/8" PER FOOT DOWN

TOWARDS FLOOR DRAIN, COVER END

WITH WIRE SCREEN

TERMINATE AT

FLOOR DRAIN

WITH AIR BREAK

PIPE SUPPORT

A B

NOTES:

1. PIPE SIZES AS INDICATED ON PLANS WHERE NOT SHOWN, SIZE MUST BE FULL SIZE OF DRAIN TAP ON

AHU OR 1-1/4" MINIMUM.

2. COORDINATE PAD OR CURB HEIGHT WITH TAP SIZE.

3. SEE SPECIFICATIONS FOR INSULATION REQUIREMENT.

4. ROUTE CONDENSATE DRAIN LINES TO THE NEAREST FLOOR DRAIN AND TERMINATE 6" ABOVE THE

FLOOR DRAIN.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:2

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-504

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

D

ET

AI

LS

MAM

17324529

MGP THF

G

UA

M

PP

-M -5

FINAL DESIGN SUBMITTAL

SCALE: NTSA3 DUCTWORK INSTALLATION DIAGRAM

SCALE: NTSC3 REGISTER DETAIL - DUCT MOUNTED

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET NAMING CONVENTION

SCALE: NTSA1 DAMPER DETAIL - MULTI-BLADE V-STYLE FIRE

SCALE: NTSC1 COIL DRAIN TRAP DETAIL

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

Approved By

CAPT Troy Brown, JRM J4 via email

CFM

SA

CFM

RA

AHU-14PP41101

CFM

SA

CFM

RA

300 CFM EA

300 CFM

EA

300 CFM

EA

300 CFM EA

AHU-14PP41102

CFM

TA

EF-14PP41102

EF-14PP41101

FCU-14PP41102FCU-14PP41101

MOD-14PP41101

MOD-14PP41102

200 CFM

EXFL

MOD-14PP41112

EF-14PP41104

2880 CFM

EF-14PP41103

MOD-14PP41110

2660 CFM

MOD-14PP41113

MOD-14PP41111

500/

CFM

500/

CFM

MOD-14PP41107 MOD-14PP41105

MOD-14PP41109

ROOM 104

ROOM 103 ROOM 102

ROOM 1012880 CFM

01 300

CFM

TA

200 CFM

EXFL

500 CFM

2660 CFM

MOD-14PP41104

MOD-14PP41103

03 03

MAU-14PP41102

500 CFM

MAU-14PP41101300

CFM TA

CFM TA

MOD-14PP41106

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:5

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-601

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

S

CH

EM

AT

IC

S

MAM

17324530

MGP THF

G

UA

M

PP

-M -6

FINAL DESIGN SUBMITTAL

SCALE: NTSA1 AIRFLOW DIAGRAM

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET KEYNOTES

SHEET NAMING CONVENTION

01. AIRFLOW IS ONLY DURING THE REMOVAL OF CLEAN AGENT

FIRE SUPPRESSANT AFTER IT HAS BEEN DEPLOYED AND

EXTINGUISHED A FIRE IN THE SPACE.

02. AIRFLOWS IN DIFFERENT OPERATIONS. FIRST AIRFLOW IS

NORMAL. SECOND AIRFLOW IS DURING REMOVAL OF CLEAN

AGENT (SEE NOTE 01).

03. MANUAL ISOLATION DAMPER WITH ALUMINUM PARALLEL

AIRFOIL BLADES AND LOW-LEAK SEAL.

04. TRANSFER AIR PATH EITHER DIRECTION.

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

Approved By

CAPT Troy Brown, JRM J4 via email

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M

M M

M

M

M

M

M

M

M

FBT-14PP03101

FUEL OFFLOADING

STATION

WALK-IN GENERATOR

ENCLOSURE (TYP)

FUEL BELLY TANK (TYP).

REFER TO 14PP-M-802 FOR

FURTHER DETAIL

DG-14PP61114

DG-14PP61113

DG-14PP61112

DG-14PP61111

FBT-14PP03102

FOP-14PP03102

FUEL POLISHER (TYP).

REFER TO 14PP-M-805 FOR

FURTHER DETAIL

FUEL BULK TANK (TYP).

REFER TO 14PP-M-801 FOR

FURTHER DETAIL

FOR

FOS

FOR

FOS

FOR

FOS

FOR

FOS

1-1/4" FOS

1-1/4" FOR

1-1/4" FOS

1-1/4" FOR

1-1/4" FOS

1-1/4" FOR

1-1/2" FOS

2" FOR2" FOR

1-1/2" FOS

2" FOR

1-1/2" FOS

2" FOR

1-1/4" FOS

1-1/4" FOR

6" FOF

6" FOF

6" FOF

FF-14PP03102

FF-14PP03101

1-1/4" FOS

1-1/4" FOR

1-1/4" FOS

1-1/4" FOR

2" F

OR

1- 1/2

" F

OS

1- 1/2

" F

OS

2" F

OR

MOV-14PP03102A

MOV-14PP03101A

MOV-14PP03103

MOV-14PP03105

MOV-14PP03104

MOV-14PP03106

MOV-14PP03107A

MOV-14PP03109A

MOV-14PP03111A

MOV-14PP03113A

FOP-14PP03101

MOV-14PP03115

MOV-14PP03116

MOV-14PP03117

MOV-14PP03118

FOP-14PP03101B

FOP-14PP03101A

FOP-14PP03102B

FOP-14PP03102A

FOP-14PP03103A

FOP-14PP03103B

FOP-14PP03104A

FOP-14PP03104B

FOP-14PP03105A

FOP-14PP03105B

FOP-14PP03106A

FOP-14PP03106B

SEE 14PP-M-803 FOR

FURTHER DETAIL

WASTE TANK

WASTE TANK

FUTURE FBT(S)

FUEL FILTRATION CABINET SEE C3/14PP-M-503

FOP-14PP03107

FBT-14PP03103

FOP-14PP03108A

FOP-14PP03108B

MOV-14PP03119A

MOV-14PP03121

MOV-14PP03120

MOV-14PP03122

1- 1/2

" F

OS

1- 1/2

" F

OR

1- 1/2

" F

OS

OPTION ITEM #101

OPTION ITEM #303

OPTION ITEM #202

OPTION ITEM #101

6" FOF FUTURE

CONNECTION

1-1/2" FOS FUTURE

CONNECTION

2" FOR FUTURE

CONNECTION

2" F

OR

MOV-14PP03123

MOV-14PP03124A

MOV-14PP03124B

(15 GPM)

(15 GPM)

(15 GPM)

(15 GPM)

(24 GPM)

(24 GPM)

(300 GPM)

(24 GPM)

MOV-14PP03102B

MOV-14PP03101B

MOV-14PP03119B

ICC 500 FUEL STORAGE TANK

REFER TO 14PP-M-809 FOR

FURTHER DETAIL

MOV-14PP03107B

MOV-14PP03109B

MOV-14PP03111B

MOV-14PP03113B

BPCV

[300 GPM]

[300 GPM]

[12 GPM]

[15 GPM]

[12 GPM]

[15 GPM]

[12 GPM]

[15 GPM]

[12 GPM]

[15 GPM]

[24 GPM]

[24 GPM]

[30 GPM]

[24 GPM]

[12 GPM]

[12 GPM]

[12 GPM]

[12 GPM] [24 GPM]

[30 GPM]

[24 GPM]

[30 GPM]

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:4

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-611

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

S

CH

EM

AT

IC

S

MAM

17324531

BJE THF

G

UA

M

PP

-M -6

FINAL DESIGN SUBMITTAL

SCALE: NTSA1 FUEL OIL FLOW DIAGRAM

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET KEYNOTES

SHEET NAMING CONVENTION

01. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #1 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINTS):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03105A

AND FOP-14PP03105B AND ASSOCIATED VALVE

MOV-14PP03111.

-PROVIDE FUEL OIL BULK TANK FBT-14PP03102, ASSOCIATED

VALVES MOV-14PP03117, MOV-14PP03118, MOV-14PP03104,

MOV-14PP03106, MOV-14PP03102 AND ASSOCIATED FUEL

POLISHER FP-14PP03102.

02. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #2 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINT):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03104A

AND FOP-14PP03104B AND ASSOCIATED VALVE

MOV-14PP03109.

03. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #3 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINTS):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03103A

AND FOP-14PP03103B AND ASSOCIATED VALVE

MOV-14PP03107.

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

/14PP-M-503(

14PP-M-801

14PP-M-802

14PP-M-803

14PP-M-805

14PP-M-809

Approved By

CAPT Troy Brown, JRM J4 via email

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:2

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-701

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

S

CH

ED

UL

ES

MAM

17324532

MGP THF

G

UA

M

PP

-M -7

FINAL DESIGN SUBMITTAL

3. WALL MOUNT UNIT.

2. POWERED FROM OUTDOOR UNIT. PROVIDE WIRING IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS.

1. PERFORMANCE INDICATED IS FOR OPERATION WITH THE ASSOCIATED OUTDOOR UNIT USING REFRIGERANT TYPE SCHEDULED FOR THAT UNIT.

REMARKS:

FCU-14PP41102 ROOM 101 ACCU-14PP41102 400 77 64.1 55 54 10.1 12 NOTE 2 36 X 10 X 12 100 1-3 FCU-14PP41101 ROOM 104 ACCU-14PP41101 400 77 64.1 55 54 10.1 12 NOTE 2 36 X 10 X 12 100 1-3

DB

(°F)

WB

(°F)

DB

(°F)

WB

(°F)

ENTERING LEAVING

SENSIBLE

OUTPUT

(MBH)

TOTAL

OUTPUT

(MBH)

EQUIPMENT TAG LOCATION ASSOCIATED

OUTDOOR UNIT

AIRFLOW

(CFM)

DX COOLING COIL

ELECTRICAL

DATA

MAX

DIMENSIONS

(L x W x H)

MAX

WEIGHT

(LB)

REMARKS

FAN COIL UNIT SCHEDULE

5. PROVIDE VFD.

4. PROVIDE ACROSS-THE-LINE STARTER.

3. MAXIMUM FAN SPEED 1800 RPM.

2. AMCA ARR. 3 CONFIGURATION WITH OSHA BELT GUARD, AND INLET SCREEN.

1. PROVIDE AMCA TYPE B SPARK RESISTANT CONSTRUCTION.

REMARKS:

EF-14PP41104 ROOM 103 DWDI, FLOOR MOUNTED, UP DISCHARGE BELT 2,880 1.0 3 460/3/60 260 2-4 EF-14PP41103 ROOM 102 DWDI, FLOOR MOUNTED, UP DISCHARGE BELT 2,660 1.0 3 460/3/60 260 2-4 EF-14PP41102 ROOM 101 INLINE CENTRIFUGAL, DUCT MOUNTED BELT 300 0.5 1/4 115/1/60 100 1, 5 EF-14PP41101 ROOM 104 INLINE CENTRIFUGAL, DUCT MOUNTED BELT 300 0.5 1/4 115/1/60 100 1, 5

HP V / PH / HZ

EQUIPMENT TAG SERVING FAN TYPE DRIVE TYPE FAN ESP

(IN WC)

MOTOR

MAX WEIGHT

(LBS) REMARKS

EXHAUST FAN SCHEDULE

6. TURN DOWN TO 30 PERCENT OR LOWER OF DESIGN CAPACITY.

5. PROVIDE FIELD CONNECTION FOR POWER WIRING TO THE ASSOCIATED INDOOR UNIT.

4. ADD MARINE RATED COATING FOR OUTDOOR UNIT

3. OUTDOOR UNIT/FLOOR MOUNTED

2. PROVIDE SINGLE POINT POWER CONNECTION.

1. AS REQUIRED TO ACHIEVE THE SCHEDULED INDOOR UNIT COOLING COIL PERFORMANCE WHEN CONNECTED AS A SPLIT SYSTEM.

REMARKS:

ACCU-14PP41106 MAU-14PP41102 NOTE 1 95 460/3/60 9 15 R-454B 63"x32"x60" 500 1-4, 6 ACCU-14PP41105 MAU-14PP41101 NOTE 1 95 460/3/60 9 15 R-454B 63"x32"x60" 500 1-4, 6 ACCU-14PP41104 AHU-14PP41102 NOTE 1 95 460/3/60 31.6 40 R-454B 99x58x56" 1,900 1-4, 6 ACCU-14PP41103 AHU-14PP41101 NOTE 1 95 460/3/60 31.6 40 R-454B 99x58x56" 1,900 1-4, 6 ACCU-14PP41102 FCU-14PP41102 NOTE 1 95 208/1/60 11 20 R-454B 31x12x25" 200 1-5 ACCU-14PP41101 FCU-14PP41101 NOTE 1 95 208/1/60 11 20 R-454B 31x12x25" 200 1-5

CAPACITY

HIGH

AMBIENT

DB (°F)

V/PH/HZ MCA MOCP

EQUIPMENT TAG ASSOCIATED

INDOOR UNIT

RATED COOLING PERFORMANCE ELECTRICAL DATA

REFRIGERAN

T TYPE

MAX

DIMENSIONS

(L x W x H)

MAX

WEIGHT

(LB)

REMARKS

AIR-COOLED CONDENSING UNIT SCHEDULE

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET NAMING CONVENTION

5. PROVIDE CURB OR STRUCTURAL RAILS TO FACILITATE NECESSARY CONDENSATE DRAIN HEIGHT ABOVE FINISHED FLOOR.

4. PROVIDE UNIT MOUNTED VARIABLE FREQUENCY DRIVE.

3. VERTICAL, UP DISCHARGE AIR HANDLER CONFIGURATION.

2. PROVIDE SINGLE POINT POWER CONNECTION.

1. PERFORMANCE INDICATED IS FOR OPERATION WITH THE ASSOCIATED OUTDOOR UNIT AND USING REFRIGERANT TYPE SCHEDULED FOR THAT UNIT.

REMARKS:

AHU-14PP41102 ROOM 102 NOTE 3 2,500 1.5 ACCU-14PP41104 64.4 88.9 77.0 64.1 53 9.5 20 460/3/60 2" PLEAT 8 1500 78x54x72 1-5 AHU-14PP41101 ROOM 103 NOTE 3 2,500 1.5 ACCU-14PP41103 64.4 88.9 77.0 64.1 53 9.5 20 460/3/60 2" PLEAT 8 1500 78x54x72 1-5

CFM ESP

(IN WG)

ENT.DB

(°F)

ENT.WB

(°F) TYPE MERV

ASSOCIATED

OUTDOOR UNIT

NET SENSIBLE

CAPACITY

(MBH)

NET TOTAL

CAPACITY

(MBH)

ENTERING

LVG.DB

(°F) FLA MOCP V / PH / HZ

EQUIPMENT TAG LOCATION ORIENTATION

FAN

DX COOLING COIL ELECTRICAL DATA

FILTER MAX

WEIGHT

(LB)

MAX

DIMENSIONS

(INDOOR UNIT)

(L x W x H)

REMARKS

AIR HANDLING UNIT SCHEDULE

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

Approved By

CAPT Troy Brown, JRM J4 via email

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:2

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-702

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

S

CH

ED

UL

ES

MAM

17324533

BJE THF

G

UA

M

PP

-M -7

FINAL DESIGN SUBMITTAL

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET KEYNOTES

SHEET NAMING CONVENTION

2. SELECT OPEN/CLOSE CONTROL VALVE TO HAVE A MAXIMUM OPERATING DIFFERENTIAL PRESSURE OF 45 PSI.

1. COORDINATE POWER AND CONTROLS CONNECTIONS WITH ELECTRICAL AND CONTROLS CONTRACTOR.

REMARKS:

MOV-14PP03124B FUEL OIL SUPPLY FROM ICC500 TANK (FBT-14PP03103) 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03124A FUEL OIL SUPPLY FROM ICC500 TANK (FBT-14PP03103) 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03123 FUEL OIL RETURN TO ICC500 TANK (FBT-14PP03103) 2 30 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03122 FUEL OIL RETURN TO FBT-14PP03102 &14PP03101 2 30 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03121 FUEL OIL RETURN FROM ICC500 TANK (FBT-14PP03103) 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03120 FUEL OIL SUPPLY TO GENERATORS 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2

MOV-14PP03119B FUEL OIL TO FBT-14PP03103 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03119A FUEL OIL TO ICC500 TANK (FBT-14PP03103) 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03118 FUEL OIL FROM FOP-14PP03102 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03117 FUEL OIL TO FOP-14PP03102 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03116 FUEL OIL TO FOP-14PP03101 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03115 FUEL OIL FROM FOP-14PP03101 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2

MOV-14PP03113B FUEL OIL SUPPLY TO DG-14PP61111 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03113A FUEL OIL SUPPLY TO DG-14PP61111 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03111B FUEL OIL SUPPLY TO DG-14PP61112 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03111A FUEL OIL SUPPLY TO DG-14PP61112 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03109B FUEL OIL SUPPLY TO DG-14PP61113 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 2 1, 2 MOV-14PP03109A FUEL OIL SUPPLY TO DG-14PP61113 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 2 1, 2 MOV-14PP03107B FUEL OIL SUPPLY TO DG-14PP61114 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 3 1, 2 MOV-14PP03107A FUEL OIL SUPPLY TO DG-14PP61114 1 1/4 12 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 3 1, 2 MOV-14PP03106 FUEL OIL RETURN TO FBT-14PP03102 2 30 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03105 FUEL OIL RETURN TO FBT-14PP03101 2 30 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03104 FUEL OIL SUPPLY FROM FBT-14PP03102 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03103 FUEL OIL SUPPLY FROM FBT-14PP03101 1 1/2 24 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2

MOV-14PP03102B FUEL UNLOADING TO FBT-14PP03102 6 300 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03102A FUEL UNLOADING TO FBT-14PP03102 6 300 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC 1 1, 2 MOV-14PP03101B FUEL UNLOADING TO FBT-14PP03101 6 300 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2 MOV-14PP03101A FUEL UNLOADING TO FBT-14PP03101 6 300 15 NO. 2 FUEL OIL AMBIENT 2-WAY OPEN 12 VAC - 1, 2

VALVE TAG UNIT SERVED VALVE SIZE (IN) DESIGN FLOW RATE

(GPM) MAX DP (FT HD) FLUID TYPE FLUID TEMP (°F) ACTION FAIL POSITION ELECTRICAL

BID OPTION NUMBER

(SEE SHEET

KEYNOTES)

REMARKS

MOTOR OPERATED VALVE SCHEDULE

01. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #1 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINTS):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03105A

AND FOP-14PP03105B AND ASSOCIATED VALVE

MOV-14PP03111.

-PROVIDE FUEL OIL BULK TANK FBT-14PP03102, ASSOCIATED

VALVES MOV-14PP03117, MOV-14PP03118, MOV-14PP03104,

MOV-14PP03106, MOV-14PP03102 AND ASSOCIATED FUEL

POLISHER FP-14PP03102.

02. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #2 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINT):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03104A

AND FOP-14PP03104B AND ASSOCIATED VALVE

MOV-14PP03109.

03. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #3 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINTS):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03103A

AND FOP-14PP03103B AND ASSOCIATED VALVE

MOV-14PP03107.

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

Approved By

CAPT Troy Brown, JRM J4 via email

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:3

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-703

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

S

CH

ED

UL

ES

MAM

17324534

BJE THF

G

UA

M

PP

-M -7

FINAL DESIGN SUBMITTAL

3. PROVIDE WASTE TANK SIZE DETERMINED BY MANYFACTURER.

2. GEAR PUMP WITH INTERNAL PRESSURE RELIEF.

1. PACKAGED CONTROLS, FILTERS, AND COALESCER INCLUDED.

REMARKS:

FP-14PP03102 AT FUEL TANKS PACKAGED NO. 2 16 AMBIENT 50 1.5 1725 208 / 1 1 1, 2, 3 FP-14PP03101 AT FUEL TANKS PACKAGED NO. 2 16 AMBIENT 50 1.5 1725 208 / 1 - 1, 2, 3

HP RPM V / PH

EQUIPMENT TAG LOCATION TYPE FUEL OIL TYPE FLOW

(GPM)

TEMP

(°F)

HEAD

(PSI)

MOTOR DATA BID OPTION

NUMBER

(SEE SHEET

KEYNOTES)

REMARKS

FUEL POLISHER

4. FUEL UNLOADING PAD DETAILS ON SHEET 14ST-C-517

3. SEE C1/14PP-M-503 FOR FURTHER DETAIL

2. DETAILED PUMP DESIGN AND SELECTION SHALL BE BY GENERATOR MANUFACTURER. PUMPS SHALL BE SIZED AND PROVIDED BY MANUFACTURER.

1. INCLUDED WITH GENERATOR ENCLOSURE.

REMARKS:

FOP-14PP03108B ICC500 FUEL TANK FUEL OIL SUPPLY/BULK

RECIRCULATION SUBMERSIBLE TURBINE NO. 2 24 43 3/4 1800 208 / 1 - 3

FOP-14PP03108A ICC500 FUEL TANK FUEL OIL SUPPLY/BULK

RECIRCULATION SUBMERSIBLE TURBINE NO. 2 24 43 3/4 1800 208 / 1 - 3

FOP-14PP03107 FUEL UNLOADING

STATION FUEL UNLOADING STATION CENTRIFUGAL SELF

PRIMING NO. 2 300 102 20 1800 460 / 3 - -

FOP-14PP03106B BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 - 1, 2

FOP-14PP03106A BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 - 1, 2

FOP-14PP03105B BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 1 1, 2

FOP-14PP03105A BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 1 1, 2

FOP-14PP03104B BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 2 1, 2

FOP-14PP03104A BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 2 1, 2

FOP-14PP03103B BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 3 1, 2

FOP-14PP03103A BELLY TANK BELLY TANK RETURN POSITIVE DISPLACEMENT NO. 2 15 43 3/4 1800 208 / 1 3 1, 2

FOP-14PP03102B BULK FUEL TANK FUEL OIL SUPPLY SUBMERSIBLE TURBINE NO. 2 24 43 3/4 1800 208 / 1 - 3 FOP-14PP03102A BULK FUEL TANK FUEL OIL SUPPLY SUBMERSIBLE TURBINE NO. 2 24 43 3/4 1800 208 / 1 - 3 FOP-14PP03101B BULK FUEL TANK FUEL OIL SUPPLY SUBMERSIBLE TURBINE NO. 2 24 43 3/4 1800 208 / 1 - 3 FOP-14PP03101A BULK FUEL TANK FUEL OIL SUPPLY SUBMERSIBLE TURBINE NO. 2 24 43 3/4 1800 208 / 1 - 3

HP RPM VOLTS / PHEQUIPMENT TAG LOCATION SERVICE PUMP TYPE FUEL OIL

TYPE

FLOW

(GPM)

HEAD

(FT)

MOTOR DATA BID OPTION

NUMBER

(SEE SHEET

KEYNOTES)

REMARKS

FUEL OIL PUMPS

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET KEYNOTES

SHEET NAMING CONVENTION

3. PROVIDE WITH WEATHER RESISTANT COATING CAPABLE OF WITHSTANDING A MINIMUM OF 10,000 HOUR SALT SPRAY.

2. TANK CONTROLLER VOLTAGE: 208/1/60.

1. UNIT TO BE UL142 AND UL 2085 RATED. PROVIDE BALLISTIC TESTING BY MANUFACTURER AND SUBMIT CERTIFICATE WITH PRODUCT DATA.

REMARKS:

FBT-14PP03103 FUEL (NO. 2 DIESEL) DOUBLE WALL / HORIZ. CYLINDRICAL STORAGE TANK ICC 500 5,000 4,000 CARBON STEEL 1 ATM 167 X 102 DIA 66,000 - 1-3

FBT-14PP03102 FUEL (NO. 2 DIESEL) DOUBLE WALL / HORIZ. CYLINDRICAL STORAGE TANK 30,000 28,500 CARBON STEEL 1 ATM 635 X 138 DIA 66,000 1 1-3

FBT-14PP03101 FUEL (NO. 2 DIESEL) DOUBLE WALL / HORIZ. CYLINDRICAL STORAGE TANK 30,000 28,500 CARBON STEEL 1 ATM 635 X 138 DIA 66,000 - 1-3

EQUIPMENT TAG FLUID TANK TYPE / CONFIG. GROSS CAPACITY

(GALLONS)

USABLE CAPACITY

(GALLONS) MATERIAL DESIGN

PRESSURE

MAXIMUM

DIMENSIONS

(L x DIA.) (IN)

MAX DRY

WEIGHT (LBS)

BID OPTION

NUMBER

(SEE SHEET

KEYNOTES)

REMARKS

FUEL OIL TANK SCHEDULE

1. SEE 14PP-M-503/C3 FOR DETAIL

REMARKS:

FF-14PP03102 GEN YARD PACKAGED NO. 2 24 1.2 1

FF-14PP03101 GEN YARD PACKAGED NO. 2 24 1.2 1

EQUIPMENT TAG LOCATION TYPE FUEL OIL TYPE FLOW

(GPM)

PRESSURE

DROP (FT) REMARKS

FUEL FILTER

01. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #1 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINTS):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03105A

AND FOP-14PP03105B AND ASSOCIATED VALVE

MOV-14PP03111.

-PROVIDE FUEL OIL BULK TANK FBT-14PP03102, ASSOCIATED

VALVES MOV-14PP03117, MOV-14PP03118, MOV-14PP03104,

MOV-14PP03106, MOV-14PP03102 AND ASSOCIATED FUEL

POLISHER FP-14PP03102.

02. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #2 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINT):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03104A

AND FOP-14PP03104B AND ASSOCIATED VALVE

MOV-14PP03109.

03. THE FOLLOWING MECHANICAL ITEMS INCLUDE THE SCOPE

ASSOCIATED WITH OPTION ITEM #3 (APPLICABLE TO

MECHANICAL ITEMS WITHIN THE DASHED BOUNDARY ON

THIS DRAWING ONLY AND ASSOCIATED CONTROLS POINTS):

- PROVIDE BELLY OR DAY TANKS PUMPS FOP-14PP03103A

AND FOP-14PP03103B AND ASSOCIATED VALVE

MOV-14PP03107.

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

/14PP-M-503

14PP-M-503/

Approved By

CAPT Troy Brown, JRM J4 via email

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:5

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-704

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

S

CH

ED

UL

ES

MAM

17324535

MGP THF

G

UA

M

PP

-M -7

FINAL DESIGN SUBMITTAL

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET NAMING CONVENTION

F. "CA-EXH-B" - CLEAN AGENT EXHAUST FROM ROOM B.

E. "CA-EXH-A" - CLEAN AGENT EXHAUST FROM ROOM A.

D. "CA-ISO-B" - CLEAN AGENT ISOLATION FOR ROOM B.

C. "CA-ISO-A" - CLEAN AGENT ISOLATION FOR ROOM A.

B. "UCC-ISO-AB" - UCC OVERRIDE TO ISOLATION ROOM A FROM ROOM B.

A. "DEFAULT" - DEFAULT SYSTEM OPERATION.

OPERATION MODES

4. MODULATING OPERATION AS DESCRIBED IN THE ASSOCIATED AHU SEQUENCE OF OPERATION.

3. MATERIAL REFERS TO BLADES AND FRAME. SHAFT AND LINKAGES SHALL BE STAINLESS STEEL IN ALL INSTANCES.

2. PROVIDE DAMPER SIZES CORRESPONDING TO THE CONNECTED DUCTWORK AS SHOWN ON THE PLAN DRAWINGS.

1. REFER TO PLANS AND SCHEMATICS FOR DAMPER LOCATION.

REMARKS

MOD-14PP41113 ISOLATION ROOM 103 MAKE-UP AIR PARALLEL V-GROOVE LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 CLOSED F A,B,C,D,E 1-3 MOD-14PP41112 ISOLATION ROOM 103 CLEAN AGENT EA PARALLEL V-GROOVE LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 CLOSED F A,B,C,D,E 1-3 MOD-14PP41111 ISOLATION ROOM 102 MAKE-UP AIR PARALLEL V-GROOVE LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 CLOSED E A,B,C,D,F 1-3 MOD-14PP41110 ISOLATION ROOM 102 CLEAN AGENT EA PARALLEL V-GROOVE LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 CLOSED E A,B,C,D,F 1-3 MOD-14PP41109 ISOLATION ROOM 102 SUPPLY AIR PARALLEL AIRFOIL STANDARD ALUMINUM TWO-POSITION 24 / 1 / 60 CLOSED A B,C,D,E,F 1-3 MOD-14PP41107 VAV CONTROL ROOM 103 SUPPLY AIR OPPOSED AIRFOIL STANDARD ALUMINUM MODULATING 24 / 1 / 60 OPEN N/A N/A 1-4 MOD-14PP41106 ISOLATION ROOM 103 TRANSFER AIR PARALLEL AIRFOIL LOW-LEAK ALUMINUM TWO-POSITION 24 / 1 / 60 CLOSED A B,C,D,E,F 1-3 MOD-14PP41105 VAV CONTROL ROOM 102 SUPPLY AIR OPPOSED AIRFOIL STANDARD ALUMINUM MODULATING 24 / 1 / 60 OPEN N/A N/A 1-4 MOD-14PP41104 ISOLATION ROOM 102 MAKE-UP AIR PARALLEL AIRFOIL LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 OPEN A C, E 1-3 MOD-14PP41103 ISOLATION ROOM 103 MAKE-UP AIR PARALLEL AIRFOIL LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 OPEN A D, F 1-3 MOD-14PP41102 ISOLATION ROOM 104 EXHAUST AIR PARALLEL AIRFOIL LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 CLOSED A D, F 1-3 MOD-14PP41101 ISOLATION ROOM 101 EXHAUST AIR PARALLEL AIRFOIL LOW-LEAK STAINLESS STEEL TWO-POSITION 24 / 1 / 60 CLOSED A C, E 1-3

ROOM/SYSTEM

ASSOC.

AIR

STREAM CONFIG. TYPE SEAL CONTROL TYPE V / PH / HZ FAIL OPEN CLOSED

EQUIPMENT TAG APPLICATION

SERVICE BLADE INFORMATION

MATERIAL

(NOTE 3)

ACTUATOR OPERATION MODES

REMARKS

MOTOR OPERATED DAMPER SCHEDULE

6. PERFORMANCE INDICATED IS FOR OPERATION WITH THE ASSOCIATED OUTDOOR UNIT, AND USING REFRIGERANT TYPE SCHEDULED FOR THAT UNIT.

5. COOLING COIL MUST HAVE 6 ROWS MINIMUM; MAXIMUM 8 FINS PER INCH.

4. DOUBLE WALL CASING WITH 316L STAINLESS STEEL INTERIOR LINER.

3. INCLUDE AN ADDITIONAL 0.5" DIRT ALLOWANCE FOR THE UNIT FILTER BANK.

2. HORIZONTAL, SUSPENDED FROM ROOF STRUCTURE, DUCTED INLET, FREE OUTLET.

1. PROVIDE SINGLE POINT POWER CONNECTION.

REMARKS:

MAU-14PP41102 500 0.5 ACCU-14PP41106 13.2 / 40.7 82.3 79.9 57.8 10.3 57.8 77 2 15 460/3/60 2" PLEAT 11 2" PLEAT 13 675 60"x45"x26" 1-6 MAU-14PP41101 500 0.5 ACCU-14PP41105 13.2 / 40.7 82.3 79.9 57.8 10.3 57.8 77 2 15 460/3/60 2" PLEAT 11 2" PLEAT 13 675 60"x45"x26" 1-6

CFM ESP

(IN WG)

DB

(°F)

WB

(°F) TYPE MERV TYPE MERV

CAPACITY

SENS/TOT

(MBH)

ENTERING LVG.

DB

(°F)

CAPACITY

(MBH)

ENT.

DB

(°F)

LVG.

DB

(°F)

MCA MOCP V / PH /

HZ

PRE-FILTER FINAL FILTEREQUIPMENT

TAG

FAN ASSOCIATED

OUTDOOR UNIT

DX COOLING COIL HOT GAS REHEAT COIL ELECTRICAL DATA FILTER

MAX

WEIGHT

(LBS)

MAX

DIMENSIONS

(INDOOR

UNIT)

(L x W x H)

REMARKS

MAKEUP AIR UNIT SCHEDULE

2. MODULE SIZE SHALL BE TYPICAL TO ALIGN WITH THE CORRESPONDING DUCT SIZE.

1. GRILLE IS INSTALLED ON THE END OF A DUCT. MATCH THE SIZE OF DUCT SHOWN ON THE PLAN DRAWINGS.

REMARKS:

TG-1 TRANSFER GRILLE WITH 3/4" BLADE SPACING, 35 DEGREE

DEFLECTION AND BLADE PARALLEL TO LONG DIMENSION NOTE 2 NOTE 1 SEE PLANS ALUMINUM WHITE DUCT 45 0.15 1, 2

RG-1 RETURN GRILLE WITH 3/4" BLADE SPACING, 35 DEGREE

DEFLECTION AND BLADE PARALLEL TO LONG DIMENSION NOTE 2 NOTE 1 SEE PLANS ALUMINUM WHITE DUCT 45 0.15 1, 2

SG-1 DOUBLE DEFLECTION SUPPLY GRILLE WITH 3/4" BLADE

SPACING. FRONT BLADES PARALLEL TO LONG DIMENSION NOTE 2 NOTE 1 SEE PLANS ALUMINUM WHITE DUCT 45 0.30 1, 2

MAX N.C. MAX APD

(IN WC)

EQUIPMENT TAG DESCRIPTION MODULE SIZE

(INCHES)

INLET CONNECTION

SIZE (IN)

FLOW RANGE

(CFM) MATERIAL FINISH MOUNTING

PERFORMANCE

REMARKS

DIFFUSER, REGISTER, & GRILLE SCHEDULE

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

Approved By

CAPT Troy Brown, JRM J4 via email

BT-YD

FILL-V-C

FILL-V-S

L-LL

L-L

L-H

L-HH

FOS-F

FOR-F

FPA-S

FPA-SS

FPB-S

FPB-SS

BT-T

BT-ST

BT-L

FPA-C FPB-C

FFP-O

FRV-S

FRV-C

M

FSV-S

FSV-C

M

FSP-O

FRP-O

EMR-BUT

M

FILL-V-C

FILL-V-S

SEQUENCE OF OPERATION: BULK FUEL TANK

PROVIDE EACH BULK STORAGE TANK WITH A FUEL LEVEL ALARM SYSTEM LOCATED AT THE LOCAL FUEL CONTROL PANEL.

INDICATOR LIGHTS FOR "LOW LEVEL" AND "LOW-LOW LEVEL" MUST ILLUMINATE WHEN LEVEL FALLS BELOW EACH RESPECTIVE SETPOINT.

INDICATOR LIGHTS FOR "HIGH LEVEL" AND "HIGH-HIGH LEVEL" MUST ILLUMINATE WHEN LEVEL RISES ABOVE EACH RESPECTIVE SETPOINT.

ANNUNCIATE ALARM WHEN LEVEL FALLS BELOW THE "LOW-LOW LEVEL" SETPOINT.

LEAK DETECTION: ANNUNCIATE ALARM AT THE CONTROL NETWORK FRONT-END WHENEVER FUEL IS DETECTED INSIDE THE BULK TANK INTERSTITIAL SPACE.

FUEL OIL FORWARDING TO DAY TANKS: TWO SUBMERSIBLE PUMPS (1 RUN; 1 STANDBY) CYCLE AS REQUIRED TO MAINTAIN THE LEVEL SETPOINT OF ALL DAY TANKS. THE PUMPS MUST ADDITIONALLY BE AUTOMATICALLY COORDINATED WITH THOSE OF ALL OTHER BULK FUEL TANKS AT THE SITE TO MAINTAIN A CONSISTENT FILL LEVEL ACROSS ALL BULK TANKS AT A GIVEN TIME. UPON A CALL FOR FUEL OIL SUPPLY FROM A DESIGNATED BULK TANK THE ASSOCIATED FUEL SUPPLY TO BELLY TANK VALVE SHALL BE OPENED. ONCE THE VALVE STATUS IS CONFIRMED OPEN, THE PUMP SHALL START. THE PUMP VFD SHALL BE RAMPED UP TO THE SPEED SET DURING COMMISSIONING, THAT PRODUCES THE FLOW SCHEDULED IN THE FUEL OIL PUMP SCHEDULE.DESIGNATION OF "RUN" AND "STANDBY" MUST AUTOMATICALLY ROTATE WITH EACH RUN CYCLE. THE STANDBY PUMP MUST AUTOMATICALLY ENGAGE UPON FAILURE TO PROVE FLOW AFTER 1 MINUTE (ADJ) FOLLOWING A COMMAND FOR FUEL FORWARDING FROM THE TANK. THIS MUST BE ACCOMPANIED BY A PUMP FAILURE ALARM ANNUNCIATED AT THE CONTROL NETWORK FRONT-END.

IF THE FUEL LEVEL IN THE BULK TANK EXCEEDS THE HIGH-HIGH LEVEL (L-HH) AN AUDIBLE AND VISUAL ALARM MUST BE INITIATED, THE MECHANICAL OVERFLOW PREVENTION VALVE MUST CLOSE, BOTH NORMALLY OPEN (MOV-A(NO)) AND NORMALLY CLOSED (MOV-B(NC)) VALVES MUST CLOSE UNTIL THE FUEL LEVEL

DROPS TO THE HIGH-LEVEL (L-H)

BACKPRESSURE CONTROL VALVE MAINTAINS CONSTANT PRESSURE IN THE FOS ALLOWING EXCESS FUEL TO RETURN BACK TO BULK TANK(S)REGARDLESS OF HOW MANY DAY TANKS ARE CALLING FOR FUEL.

SEE 02PP-M-611 FOR BPCV LOCATION.

TANK OUTER SHELL

TANK INNER SHELL

TANK INTERSTITIAL

FROM FUEL UNLOADING

14PP-M-803

FROM FUEL POLISHING

14PP-M-805

TO FUEL POLISHING

14PP-M-805

MOV-"B"

(NC)

PRESSURE

RELIEF VALVE

SET AT 50 PSI

EM

ER

GE

NC

Y

VE

NT

EM

ER

GE

NC

Y

CO

NT

AI

NM

EN

T

VE

NT

2" A

TM

OS

PH

ER

IC

V

EN

T

W

IT

H

IN

SE

T

SC

RE

EN

IN

SP

EC

TI

ON

LO

CA

L F

ILL

TO BELLY TANK

14PP-M-802

FROM BELLY TANK

14PP-M-802

FOR

FOS

EMERGENCY STOP BUTTON

(LOCATED ADJACENT TO BULK FUEL TANKS)

MOV (SEE 14PP-M-611 FOR

TAG NUMBERS)

MOV-"A"

(NO)

MOV (SEE 14PP-M-611 FOR

TAG NUMBERS)

OVERFILL

PREVENTION

DEVICE BA

MANUAL DRAIN

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

AO: FBT-14PP03101 LEVEL

AO: FBT-14PP03102 LEVEL

BO: FUEL OIL TRANSFER

PUMP ON

AO: FBT-14PP03101 LEVEL

AO: FBT-14PP03102 LEVEL

BO: FUEL OIL TRANSFER

PUMP ON

FUEL OIL LEVEL INDICATING

AND ALARM PANEL LOCATED

NEAR FUEL BULK TANKS

(PROVIDE 2 EA PANELS:

PANEL A AND PANEL B-

PANEL B IS FULLY

REDUNDANT)

LAHH

LAH

90%

95%

PCMS-A PCMS-B

ALARM HORN

HS

SILENCE

FBT-14PP03101

LI YI

TRANSFER PUMP

FOP-14PP03101A ON

TRANSFER PUMP

FOP-14PP03101B ON

TRANSFER PUMP

FOP-14PP03102A ON

TRANSFER PUMP

FOP-14PP03102B ON

YI

YIYI

FFA

FRA

FUEL RETURN LEAK

FUEL FILL LEAK

FSA

FUEL SUPPLY LEAK

TO FUEL OFFLOADING AND

ALARM INDICATING PANEL

LOCATED NEAR PACKAGED

OFFLOADING SKID

LAHH

LAH

90%

95%

FBT-14PP03102

LI

FBCP-14PP0301A & FBCP-14PP03101

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture (Federal Services) 1003 Bishop Street Suite 1340 Honolulu, HI 96813

A/E Task Order No. N6274223F0324

AN

DE

RS

EN

A

IR

F O

RC

E

BA

SE

LJE

AWK/DMK

9/

/2

9:

:0

PM

P6

_1

_1 4P

P_ M

_d et ac he d.

rv t

14PP-M-801

PO

W

ER

P

LA

NT

ME

CH

AN

IC

AL

C

ON

TR

OL

S

MAM

17324536

BJE THF

G

UA

M

PP

-M -8

FINAL DESIGN SUBMITTAL

SCALE: NTSA1 MECHANICAL CONTROLS - FUEL BULK STORAGE TANK

1) SEE EI-900 SERIES SHEETS FOR SPECIFIC EQUIPMENT I/O POINTS.

NOTES:

BT-L BULK TANK LEVEL SENSOR 0-100% <__>

OTHER POINTS BT-T BULK TANK TEMPERATURE SENSOR <___> <___> F AI

FILL-V-B-C FILL MOTOR OPERATED VALVE COMMAND (MOV-B) OPEN/CLOSE BO

FILL-V-B-S FILL MOTOR OPERATED VALVE STATUS (MOV-B) OPEN/CLOSE BI

FILL-V-A-C FILL MOTOR OPERATED VALVE COMMAND (MOV-A) OPEN/CLOSE BO

FILL-V-A-S FILL MOTOR OPERATED VALVE STATUS (MOV-A) OPEN/CLOSE BI

L-L BULK TANK LEVEL SENSOR LOW LEVEL 20% ALM/NORMAL

L-H BULK TANK LEVEL SENSOR HIGH LEVEL 95% ALM/NORMAL

FRV-C FUEL RETURN FROM BELLY TANK VALVE COMMAND OPEN/CLOSE BO

FRV-S FUEL RETURN FROM BELLY TANK VALVE STATUS OPEN/CLOSE BI

FSV-C FUEL SUPPLY TO BELLY TANK VALVE COMMAND OPEN/CLOSE BO

FSV-S FUEL SUPPLY TO BELLY TANK VALVE STATUS OPEN/CLOSE BI

FPB-C BULK TANK PUMP SPEED COMMAND 0-100% <___> GPM AO

FPA-C BULK TANK PUMP SPEED COMMAND 0-100% <___> GPM AO

FPB-SS BULK TANK FUEL OIL SUPPLY PUMP B START/STOP ON/OFF BO

FPB-SS BULK TANK FUEL OIL SUPPLY PUMP B START/STOP ON/OFF BO

START / STOP

FPA-SS BULK TANK FUEL OIL SUPPLY PUMP A START/STOP ON/OFF BO

EMR-BUT EMERGENCY STOP BUTTON (SEE NOTE) ON/OFF BI

RST-BUT SYSTEM RESET BUTTON (FOR SAFETIES) ~ <__>

FPB-S BULK TANK FUEL OIL SUPPLY PUMP B STATUS ON/OFF BI

FPA-S BULK TANK FUEL OIL SUPPLY PUMP A STATUS ON/OFF BI

BT-ST BULK TANK SUPPLY TEMPERATURE <___> <___> F AI

BT-T-H BULK TANK TEMPERATURE SENSOR HIGH LIMIT <115 DEG F> ALM/NORMAL BI

L-LL BULK TANK LEVEL SENSOR LOW LOW LEVEL 15% ALM/NORMAL BI

L-HH BULK TANK LEVEL SENSOR HIGH HIGH LEVEL 98% ALM/NORMAL BI

FFP-O FUEL FILL CONTAINMENT PIPE OIL LEAK ALM/NORMAL BI

FRP-O FUEL RETURN CONTAINMENT PIPE OIL LEAK ALM/NORMAL BI

FSP-O FUEL SUPPLY CONTAINMENT PIPE OIL LEAK ALM/NORMAL BI

BT-YD INTERSTITIAL LEAK DETECTION SENSOR BULK TANK ALM/NORMAL BI

FOR-F BULK TANK RETURN PROOF OF FUEL FLOW ALM/NORMAL BI

PROOFS

SAFETIES

FOS-F SUPPLY PROOF OF FUEL FLOW ALM/NORMAL BI

FUNCTION NAME DESCRIPTION SETTING RANGE I/O TYPE

FUEL BULK TANK

14CC-A-101

SITE #

BUILDING ID DISCIPLINE

CONSECUTIVE NUMBERS

SITE #

SITE 01

SITE 02

SITE 14

BUILDING ID

AC - ACCESS CONTROL POINT

CC - COMMAND CENTER

FP - FIRE PUMP BUILDING

GI - GENERAL

PP - POWER PLANT

SF - SECURITY FORCE

ST - SITE

GENERAL SHEET NOTES

SHEET NAMING CONVENTION

CONTROLLER A (1 OF 2)

PROVIDE FULLY REDUNDANT

CONTROLLER B

SY

M

DE

SC

RI

PT

IO

N

DA

TE

AP

PR

14GI-M-001

14GI-M-008

14PP-M-611

14PP-M-611

14PP-M-802

14PP-M-802

14PP-M-803

14PP-M-805

14PP-M-805

Approved By

CAPT Troy Brown, JRM J4 via email

BTNK-YD

BTNK-T

BTNK-L-LL

BTNK-L-L

BTNK-L-H

BTNK-L-HH

BTNK-L

FOS-S

FOS-S

FOR-P1-C

FOR-P1-S

FOR-P1-SS

BTNK-FS-FBTNK-FO-FT

BTNK-FR-F

BTNK-ST

FOR-P2-SS

FOR-P2-S

FOR-P2-C

FOS-C

FOS-C

SEQUENCE OF OPERATION: GENERATOR BELLY TANK

PROVIDE EACH BELLY TANK WITH A FUEL LEVEL ALARM SYSTEM LOCATED AT THE LOCAL FUEL CONTROL PANEL.

INDICATOR LIGHTS FOR "LOW LEVEL" AND "LOW-LOW LEVEL" MUST ILLUMINATE WHEN LEVEL FALLS BELOW EACH RESPECTIVE SETPOINT.

INDICATOR LIGHTS FOR "HIGH LEVEL" AND "HIGH-HIGH LEVEL" MUST ILLUMINATE WHEN LEVEL RISES ABOVE EACH RESPECTIVE SETPOINT.

ANNUNCIATE ALARM WHEN LEVEL FALLS BELOW THE "LOW-LOW LEVEL" SETPOINT.

LEAK DETECTION: ANNUNCIATE ALARM AT THE CONTROL NETWORK FRONT-END WHENEVER FUEL IS DETECTED INSIDE THE BELLY TANK INTERSTITIAL SPACE.

FUEL OIL COOLERS MUST BE PROVIDED ON THE FUEL OIL RETURN LINE BETWEEN THE DIESEL ENGINE AND ITS RESPECTIVE BELLY TANK. A TEMPERATURE SWITCH PROVIDED ON THE FUEL OIL RETURN LINE. WHEN THE TEMPERATURE SWITCH SENSES A FUEL RETURN TEMPERATURE OF 115 DEG F (ADJ) OR HIGHER, THE FUEL COOLER MUST BE ENABLED. WHEN THE FUEL RETURN TEMPERATURE DROPS BELOW 105 DEG F THE FUEL COOLER MUST BE DISABLED.

WHEN THE BELLY TANK LEVEL REACHES THE LOW-LEVEL LIMIT (BTNK-L-L), THE NORMALLY CLOSED SOLENOID VALVE MOV-B(NC) IS ENERGIZED TO OPEN AND THE PRIMARY FORWARDING PUMPS AT THE BULK TANKS START. WHEN THE BELLY TANK HIGH LEVEL LIMIT (BTNK-L-H) IS REACHED THE NORMALLY CLOSED SOLENOID VALVE MUST BE DE-ENERGIZED TO CLOSE.

IF THE FUEL LEVEL IN THE BELLY TANK EXCEEDS THE HIGH-HIGH LEVEL (BTNK-L-HH) AN AUDIBLE AND VISUAL ALARM MUST BE INITIATED, THE MECHANICAL OVERFLOW PREVENTION VALVE MUST CLOSE, BOTH NORMALLY OPEN (MOV-A(NO)) AND NORMALLY CLOSED (MOV-B(NC)) SOLENOID VALVES MUST CLOSE, THE BULK TANK ISOLATION VALVES ON RETURN LINE MUST PROVE OPEN, AND THE ASSOCIATED PRIMARY RETURN PUMP STARTS UNTIL THE FUEL LEVEL DROPS TO THE HIGH-LEVEL (BTNK-L-H).

IF THE FUEL LEVEL IN THE TANK DROPS BELOW THE LOW-LOW LEVEL (BTNK-L-LL) AN AUDIBLE AND VISUAL ALARM IS INITIATED AND MUST INHIBIT THE RETURN PUMP OPERATION.

FUEL COOLER

FOS

FOR

FOS

FOR

AUTOMATIC

CLOSURE FUSIBLE

LINK FIRE RATED

VALVE (TYPICAL)

BELLY TANK OUTER

SHELL

BELLY TANK INNER

SHELL

BELLY TANK

INTERSTITIAL

FROM GENSETS

14PP-M-611

TO GENSETS

14PP-M-611

TO BULK TANKS

14PP-M-801

FROM BULK TANKS

14PP-M-801

MOV-A(NO)

MOV-B(NC)

MA

NU

AL

F

ILL

P

OI

NT

EM

ER

GE

NC

Y

VE

NT

OVERFILL

PREVENTION

DEVICE

EM

ER

GE

NC

Y

CO

NT

AI

NM

EN

T

VE

NT

2" A

TM

OS

PH

ER

IC

V

EN

T

W

IT

H

IN

SE

CT

S

CR

EE

N

MANUAL DRAIN

"PUMP RELIEF MAY BE INTERNAL

TO PUMP OR SEPARATE"

AUTOMATIC

CLOSURE FUSIBLE

LINK FIRE RATED

VALVE (TYPICAL)

MANUAL FCV

A. FOR GENERAL NOTES, LEGENDS, AND ABBREVIATIONS SEE

SHEETS 14GI-M-001 THROUGH 14GI-M-008.

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D E

P

AR

TM

E

N T

O F

TH

E

N A

VY

N

A

VA

L

FA

C

IL

IT

IE

S E

N G

IN

E

E R

IN

G

SY

S

TE

M

S C

O M

M A

N D

DRAWFORM REVISION: 25 AUGUST 2020

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VF

AC

P

AC

IF

IC

M

A K

AL

AP

A , H

A W

AI

I

AS NOTED

PR

O

JE

C

T

SI

TE

C

O M

M

AN

D C

EN

TE

R

N

AV

FA

C

P

AC

IF

IC

1812861

KYM

JC

Jacobs/B&V, A Joint Venture…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .