This document is Notice No. 7 containing pre-proposal questions and answers for RFP N62742-25-R-1301 regarding the FY25 MCON P-693 Pacific Deterrence Initiative: Guam Defense System Command Center project at Joint Region Marianas, Guam. The Q&A addresses technical specifications related to motor operated dampers, ductwork materials, static-dissipative vinyl tile installation, gypsum board finishing requirements, structural components, and other construction details.

Key clarifications include: unconditioned outside air ductwork must be stainless steel while other ductwork should be galvanized steel; static dissipative vinyl tile should be 24"x24" factory-laminated tiles without pre-grooves; gypsum board below raised access flooring requires Level 1 finish; several rooms will receive static dissipative vinyl tile with new finish code SDT1; and the structural decorative glazed railing references are being removed in a forthcoming amendment. The document also confirms that the Seismic Isolation Specialist QC Specialist and Special Inspector roles must be filled by different people, and that the Knowledge Wall is a Joint Occupancy Date activity.

View the file

Other files

File Type Posted
25-1301 CmdCtrl Notice14.pdf PDF
Am-0011 Attachments 25-44.pdf PDF
Am-0011 Attachment 1_Revised Drawings dtd 1-28-2025.pdf PDF
Am-0011.pdf PDF
Am-0011 Attachments 2-24.pdf PDF
25-1301 CmdCtrl Notice13.pdf PDF
25-1301 CmdCtrl Notice12.pdf PDF
25-1301 CmdCtrl Notice11.pdf PDF
Am-0010 Attachment 2_Revised Drawings_Signed.pdf PDF
Am-0010.pdf PDF
25-1301 CmdCtrl Notice10.pdf PDF
25-1301 CmdCtrl Notice9.pdf PDF
Attachment 1_Revised Drawings_dtd 13 and 20 Dec 2024.pdf PDF
Am-0009.pdf PDF
Am-0008.pdf PDF
25-1301 CmdCtrl Notice8.pdf PDF
P693_Sign-in Sheets_Redacted.pdf PDF
Am-0007.pdf PDF
Am-0007 Attachment 1_Revised Drawings dtd 13 Dec 2024.pdf PDF
Am-0006 Attachment 1_Revised Drawings dtd 6 Dec 2024.pdf PDF
Am-0006.pdf PDF
Am-0005 Attachment 1_Revised Drawings dtd 11-22-2024.pdf PDF
Am-0005.pdf PDF
25-1301 CmdCtrl Notice6.pdf PDF
25-1301 CmdCtrl Notice5.pdf PDF
R-P693_Drawings_Final_Vol14.6_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.5_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.8_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.2_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.1_20241007.pdf PDF
25-1301 CmdCtrl Notice4.pdf PDF
R-P693_Drawings_Final_Vol14.7_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.4_20241007.pdf PDF
Am-0004 Attachment 1_Revised Drawings dtd 11-15-2024.pdf PDF
25-1301 CmdCtr Notice3.pdf PDF
Am-0004.pdf PDF
Am-0003.pdf PDF
Am-0003 Attachment 1_Revised Drawings dtd 11-8-2024.pdf PDF
25-1301 CmdCtrl Notice2.pdf PDF
Am-0002.pdf PDF
Am-0001.pdf PDF
25-1301 CmdCtrl Notice1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.7_20241007.pdf PDF
P693_Drawings_Final_Vol14.3_20241007.pdf PDF
25-1301 P-693 RFP.pdf PDF
P693_Specs_Final_Vol02_20241007.pdf PDF
P693_Drawings_Final_Vol14.6_20241007.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

RFP N62742-25-R-1301

Notice No. 7

16 December 2024

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-25-R-1301

FY25 MCON P-693 PACIFIC DETERRENCE INITIATIVE: GUAM DEFENSE SYSTEM

COMMAND CENTER,

JOINT REGION MARIANAS, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The

RFP remains unchanged unless it is amended in writing on a Standard Form 30.

244. Reference Drawing 14CC-M-707. The Motor Operated Damper Schedule shows (8) dampers we are unable to locate on the plans. This includes dampers MOD-14CC4113A to

MOD-14CC4116B. Please advise where these are located on the plans.

ANSWER: The referenced dampers were removed from the design. These dampers will be removed from the equipment schedules on 14CC-M-707 in a future amendment.

245. Reference Drawings 14-CC-M-707, 14-PP-M-704, and Specification Section 23 30 00.00 14.

The motor operated damper schedule on both 14-CC-M-707 and 14-PP-M-704 shows the material as being aluminum or stainless steel. Section 23 30 00.00 14 does not show any ductwork being aluminum or stainless steel. In addition, section 23 30 00.00 14 specifies all other type of dampers as being galvanized steel. Please confirm ductwork connected to the aluminum or stainless steel motor operated dampers is galvanized steel.

ANSWER: Unconditioned outside air ductwork is stainless steel. All other ductwork is galvanized steel. Damper materials specified on the schedule are correct. If dissimilar metals are in contact, a protective transition between the two metals is required (such as a neoprene gasket).

246. Reference Specification Section 09 62 38.00 14, Paragraph 2.1.1.1. Static-Dissipative

Vinyl Tile states that the tile must be pre-grooved for heat welding of seams. However, since the tile goes over the raised access flooring system, heat welding is not recommended. Please clarify the intent.

ANSWER: Do not use pre-grooved tiles. Tiles are to be factory-laminated to the flooring substrate with milled edges. Specification will be updated in forthcoming amendment.

247. Reference Specification Section 09 62 38.00 14, Paragraph 3.5.1. Self-Coving states that the tile must have a self-coving base. However, self-coving base is not commonly installed on vinyl tile. Please clarify the intent.

RFP N62742-24-R-1327

ANSWER: See Notice 5, answer to question 171.

248. Reference Specification Section 09 62 38.00 14

It seems like there are some discrepancies between the Finish Schedule and the Static

Control Flooring specification. Specifically, regarding the size of the LVT.

ANSWER: Use 24"x24" per finish schedule. Disregard prior response to item 1 in question 95.

Specification will be revised to show 24" square tiles in forthcoming amendment.

249. Detail A3 of drawing CC-S-585 and Detail C3 of drawing 14CC-A-528 show the section of

SS cable tray under roof catwalk. However, we cannot find further information. Please clarify what this cable tray is for and what drawing show the usage. Also, please provide the requirement of the cable tray, such as thickness, the spacing of drain hole, what type of stainless steel and etc.

ANSWER: See A3/14CC-S-585 for dimensions. Further minimum capacity information will be provided in forthcoming amendment. Note, the tray may be commercial product or manufactured using bent SS plate designed and detailed by contractor.

250. Reference Drawing 14CC-A-202 and Specification Section 08 91 00.00 14.

Reference Volume 14.3 Sheet 14CC-A-202. Keynote 3 calls for stainless steel ballistic

Louver Screen Wall. Specification section 08 91 00.00 14 paragraph 2.1.2 and 2.1.3 allows for aluminum material.

Please provide the basis of design for stainless steel Louver Screen Wall meeting the ballistic requirement.

ANSWER: Stainless Steel or Aluminum is acceptable as long as it meets the performance requirements laid out in 08 34 01.00 14 and 08 91 00.00 14 specifications. While there is no off the shelf product that is tested for both requirements, the AE has worked with multiple manufacturers who have stated they would take their FEBR louver and test it to the typhoon requirements.

251. Reference Drawing 14CC-A-202 and Specification Section 08 91 00.00 14.

Louver Screen Wall. Specification section 08 91 00.00 14 paragraph 2.1.2 and 2.1.3 allows for aluminum material.

Please advise if ballistic aluminum Louver Screen Wall is acceptable in lieu of stainless steel.

ANSWER: See answer to question 250.

252. Reference Drawing 14CC-A-202 and Specification Section 08 91 00.00 14.

rated screen wall louvers. Specification section 08 91 00.00 14 paragraph 2.2 indicates ICC

500 louvers which is Fema Louvers instead of ballistic. If the Louver Screen Walls are to meet Fema, the blade types will be different than if they are to meet ballistic. Please advise if Louver Screen Wall should be ballistic or Fema rated.

ANSWER: Screen wall must meet both requirements, and meet all requirements laid out in specifications. While there is no off the shelf product that is tested for both requirements, the AE has worked with multiple manufacturers who have stated they would take their FEBR louver and test it to the typhoon requirements.

253. Reference Specification Section 09 29 00.00 14, para 3.3 indicates to finish all gypsum board walls, partitions and ceilings to Level 5 in accordance with GA 214 unless otherwise noted. The paragraph does not mention anything regarding the gypsum board that continues below the raised access flooring. Please confirm the level of gypsum board finish where it occurs below the raised access flooring panels.

ANSWER: Level 1 is appropriate according to GA 214 as this is a concealed space.

254. Reference Sheet 14CC-A-313 Detail A1.

The cantilever structural concrete floor slab on the exterior of the building calls for silicone elastomeric coating. Please confirm that the extent of the silicone elastomeric on the cantilever is on the exterior only and the structural slab (Room 159) shall be sealed concrete finish only.

ANSWER: Confirmed.

255. Reference Drawing Sheet 14CC-A-602.

The Room Finish Schedule calls for RAF-1 as a finish in several rooms with raised access flooring. This appears to be incorrect. Please provide the floor finishes on the raised floor panels in rooms 123, 124, 130, 135, and 158.

ANSWER: These rooms will receive static dissipative vinyl tile. The new finish code will be

SDT1. Drawings will be updated in forthcoming amendment.

256. Reference Drawing Sheet 14CC-S-412. Keynote 01 indicates FRP grating to be attached to beams with Type M Saddle Clips. Please provide required spacing of Type M Saddle Clips.

ANSWER: Clip spacing in East-West direction is at every structural support and the North-

South spacing is a maximum of 24 inches with a minimum of four total clips per section of grating. A revised drawing adding this spacing will be provided in a forthcoming amendment.

257. Structural Decorative Glazed Railing with 1 ½” SS Handrail.

Reference is shown at Keynote #15 on drawings 14CC-A-430 to 14CC-A-432 but could not locate the 'Structural Decorative Glazed Railing' described by the keynote. Please confirm if this is required, and if so, kindly provide the location.

ANSWER: Disregard decorative glazed railing, it was removed. A forthcoming amendment will remove references with Keynote 15.

258. Details of Structural decorative cable railing and Cable guardrail system mounted.

Reference is shown at Keynotes #15 and #17 on drawing 14CC-A-430. Please confirm whether both items have the same details and specifications, as both are described as having cable rails but are shown differently in the drawings. Kindly confirm which details should be followed and provide any additional information, if necessary.

ANSWER: Disregard decorative glazed railing, it was removed. A forthcoming amendment will remove references with Keynote 15.

259. Reference Specification Section 01 45 00.00 14, and 01 45 35.00 14, Isolation and Energy

Dissipation Specialist.

Is the Seismic Isolation System (SIS) QC Specialist listed in the Experience Matrix in spec section 01 45 00.00 14 para 1.6.5 required to be the same person as the special inspector for

Structural-Isolation and Energy Dissipation System listed in spec section 01 45 35.00 14?

If not, please advise as to the requirements for the observer of the Fabrication and

Installation of isolator units and energy dissipators.

ANSWER: The Seismic Isolation Specialist QC Specialist and the Special Inspector for the

Structural Isolation and Energy Dissipation System must be different people. The qualifications are the same. Specification Section 01 45 35.00 14 will be revised in a forthcoming amendment to include the qualifications for the Special Inspector.

260. Reference Command Center Drawing 14CC-A-403 & 405.

Knowledge Wall. Enlarged Plan – Room 140 and 141 drawing 14CC-A-403 indicates

Knowledge Wall to be Engineered, Supplied and Installed by Knowledge Wall Vendor

(sheet keynotes 01). Please clarify the Contractor’s scope of work.

ANSWER: See Specification 01 11 00.00 14 Paragraph 1.6.2. This is a Joint Occupancy Date

(JOD) activity.