25-1301 CmdCtr Notice3.pdf

PDF 325 KB Posted

Attached to
FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER, JOINT REGION MARIANAS, GUAM
Solicitation number
N6274225R1301
Issued by

About this file

This document is Notice No. 3 containing pre-proposal questions and answers for RFP N62742-25-R-1301, regarding the FY25 MCON P-693 Pacific Deterrence Initiative: Guam Defense System Command Center project at Joint Region Marianas, Guam.

The Q&A addresses technical clarifications about construction requirements, including: the Construction Security Contractor's access control facility responsibilities being limited to providing space per the layout; storm drain line profile details on Drawing MS101; landscape seeding limits and irrigation requirements for disturbed areas; temporary water connections from existing fire hydrants; aggregate surfacing specifications (3-inch #57 stone on top of 9-inch washed stone and 12-inch prepared subgrade); confirmation that no materials need to be salvaged from housing demolition; and clarification that the Government, not the general contractor, is responsible for providing Construction Security Monitoring (CSM) personnel with Top Secret facility clearance. The document also confirms there will not be multiple contract awards.

View the file

Other files

File Type Posted
25-1301 CmdCtrl Notice14.pdf PDF
Am-0011 Attachments 25-44.pdf PDF
Am-0011 Attachment 1_Revised Drawings dtd 1-28-2025.pdf PDF
Am-0011.pdf PDF
Am-0011 Attachments 2-24.pdf PDF
25-1301 CmdCtrl Notice13.pdf PDF
25-1301 CmdCtrl Notice12.pdf PDF
25-1301 CmdCtrl Notice11.pdf PDF
Am-0010 Attachment 2_Revised Drawings_Signed.pdf PDF
Am-0010.pdf PDF
25-1301 CmdCtrl Notice10.pdf PDF
25-1301 CmdCtrl Notice9.pdf PDF
Attachment 1_Revised Drawings_dtd 13 and 20 Dec 2024.pdf PDF
Am-0009.pdf PDF
Am-0008.pdf PDF
25-1301 CmdCtrl Notice8.pdf PDF
P693_Sign-in Sheets_Redacted.pdf PDF
Am-0007.pdf PDF
Am-0007 Attachment 1_Revised Drawings dtd 13 Dec 2024.pdf PDF
Am-0006 Attachment 1_Revised Drawings dtd 6 Dec 2024.pdf PDF
Am-0006.pdf PDF
25-1301 CmdCtrl Notice7.pdf PDF
Am-0005 Attachment 1_Revised Drawings dtd 11-22-2024.pdf PDF
Am-0005.pdf PDF
25-1301 CmdCtrl Notice6.pdf PDF
25-1301 CmdCtrl Notice5.pdf PDF
R-P693_Drawings_Final_Vol14.6_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.5_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.8_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.2_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.1_20241007.pdf PDF
25-1301 CmdCtrl Notice4.pdf PDF
R-P693_Drawings_Final_Vol14.7_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.4_20241007.pdf PDF
Am-0004 Attachment 1_Revised Drawings dtd 11-15-2024.pdf PDF
Am-0004.pdf PDF
Am-0003.pdf PDF
Am-0003 Attachment 1_Revised Drawings dtd 11-8-2024.pdf PDF
25-1301 CmdCtrl Notice2.pdf PDF
Am-0002.pdf PDF
Am-0001.pdf PDF
25-1301 CmdCtrl Notice1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.7_20241007.pdf PDF
P693_Drawings_Final_Vol14.3_20241007.pdf PDF
25-1301 P-693 RFP.pdf PDF
P693_Specs_Final_Vol02_20241007.pdf PDF
P693_Drawings_Final_Vol14.6_20241007.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

RFP N62742-25-R-1301

Notice No. 3

26 November 2024

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-25-R-1301

FY25 MCON P-693 PACIFIC DETERRENCE INITIATIVE: GUAM DEFENSE SYSTEM

COMMAND CENTER,

JOINT REGION MARIANAS, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The RFP remains unchanged unless it is amended in writing on a Standard Form 30.

23. Reference Specification Section 01 50 00.00 1.4 – Temporary Construction Facility.

Construction Security Contractors Access Control Facility (ACF).

Item 3.6.1 describes the requirement of the Administrative Field offices for the Government.

Is this same facility intended to house the Government appointed Construction Security Contractor? If not, please provide similar guidance as to their separate space wants & needs.

Also, since the construction of the isolation slab cannot start until the Security Contractors have moved in and is operational, please provide the period of occupancy & start-up needed to achieve this operational status for scheduling purposes.

ANSWER: General contractor's responsibility for the construction security contractor is limited to providing space as shown on the layout.

24. Reference Drawing MS101. Fuel Unloading Plan – Storm Drain Line Profile.

We were unable to locate the plan profile for the 12” HDPE storm drain line from the Fuel

Unloading Concrete Pad Trench Drain to the outlet at the existing channel. Please advise where located in the drawings or please provide.

ANSWER: Inverts are provided on Drawing 14ST-MS101. A profile was not provided.

25. Reference Landscape Drawings, MS101, and EU10. Landscape Limits – Containment

Basin and Outlet Area & Offsite Electrical & Telecom.

For all Offerors to be bidding to the same scope, please clarify the seeding limits for:

1. The containment basin and associated piping work south of O’Malley Ave on drawings

MS101 & LP109.

2. Electrical and Telecom Ductbank work north of Bonnis Blvd on drawings LP104 and

LP107.

3. Electrical Ductbank work near the Main Substation Bldg. 26052 shown on EU101.

4. Do the requirements of spec section 32 05 33.00 14 regarding temporary irrigation, establishment, and 12-month maintenance required at the above off-site locations?

RFP N62742-24-R-1327

ANSWER: Temporary irrigation, establishment, and 12-month maintenance is required at all areas disturbed by construction activities to receive seed and disturbed by contractor's operations in accordance with specification 32 05 33.00 14 paragraph 3.1.

26. Reference Specification Section 01 50 00, Para 3.9. Offsite Laydown Area – Restoration

Requirements.

Spec. Section 01 50 00 para 3.9 Restoration of Storage Area states…” Remove gravel used to traverse grassed areas and restore the area to its original condition, including top soil and seeding as necessary.”

Do the requirements of spec sections 32 05 33.00 14 and 32 84 24.00 14 regarding temporary irrigation, landscape establishment, and 12-month maintenance apply to the offsite Laydown / Storage Area? Please advise.

ANSWER: No. Laydown areas are only used during active construction and shall be restored prior to demobilization per 01 50 00.

27. Reference Drawing G-022. Temporary Water Connection to Secure Storage Area and

Offsite Laydown Area Drawing G-022 shows the temporary water connection at the offsite laydown area and secure storage area. Please provide:

1. Removal and replacement limits of affected civil items, such as roadway, sidewalk, etc.

on G-022 and associated civil drawings.

2. Description or detail of the temporary water connections to be provided for each area.

ANSWER: The temporary water connection is provided via an existing fire hydrant. The connection to the hydrant will be above ground. It is the contractor's responsibility to provide protection of the temporary line during construction. The protection method is up to the contractor. The site shall be restored to existing conditions after construction is complete.

28. Reference Drawing G-022. Aggregate Surfacing of Temporary Areas Drawing G-022 notes F, G and I mention aggregate surfacing for the offsite laydown area and secure storage area. In order for all Offerors to be bidding to the same scope, please provide specific direction on:

1. The type of aggregate material to be provided for each offsite laydown area and secure storage area.

2. The thickness of aggregate material.

3. Any other material required, such as filter fabric, etc.

ANSWER: For bidding purposes use 3-inch min thickness of no. 57 stone on top, then 9-inch thick 1"-3" washed stone below to layer, and a 12-inch prepared subgrade. Note that maintenance is required by contractor during construction. A forthcoming Amendment will be provided with a revised drawing showing the section.

29. Reference Drawing G-022. Offsite Laydown Area – Existing Conditions Please provide existing conditions, such as topography drawings, and any other information relevant to site preparation for the site development of the offsite laydown areas.

ANSWER: Contractor is required to perform a preconstruction survey prior to construction per specification 01 57 19.00 14, paragraph 1.6.1 to establish existing conditions at the start of construction. Additionally a topographic survey is required as part of GEPA permitting, see checklist provided in Appendix A of specification 01 57 19.01 14. No existing information is available for the area.

30. Offsite Laydown Area and Secure Storage Area Once the temporary facilities are installed by the Contractor and turned over to the

Government, will maintenance and/or repair of the area caused by the security contractor or Government representatives be the responsibility of the said entity? Please advise, and if not, provide an allowance in the bid schedule for all Offerors to be bidding to the same scope.

ANSWER: Maintenance and repair for normal wear and tear along with mowing, fence maintenance, etc. of the contractor laydown, government laydown, and secure storage area is to be performed by the general contractor. The mission systems contractor will maintain their area once they are on-site. A bid allowance will not be provided. Offerors to assume maintenance and repair costs will be typical for construction office trailers and surrounding land. Note, the secure storage space is for the general contractor to use to store materials going into the Special Use Space (SUS).

31. Reference Specification Section 02 41 00. Demolition & Salvage of Materials and

Equipment.

Please confirm that there will be no salvageable materials/equipment required during the demolition of the 38 housing units. If required, please provide an itemized list of the materials/equipment to be salvaged and designated storage area.

ANSWER: No items are to be salvaged from the housing units being demolished.

32. Reference Command Center Drawing 14CC-A-111.

Drawing sheet 14CC-A-111 indicates a Legend for Special Use Space Boundary. However, the floor plan does not clearly show this boundary. Please clearly identify on sheet 14CC-A- 111 the boundaries of Special Use Space.

ANSWER: See Enlarged Floor Plan A2 on sheet 14CC-A-411 and Keynote 4 with dashed line for boundary.

33. Reference P-693 Construction Security Plan (CSP), paragraph I - GENERAL

INFORMATION, item 9a, “Construction Security Monitoring (CSM) contract shall be awarded to firms that have a Defense Counterintelligence and Security Agency (DCSA) TOP SECRET Facility Clearance (FCL)”. Is the CSM a separate firm than the general contractor? Please clarify if the contractor is responsible to hire the CSM or not.

ANSWER: CSM is separate from general contractor and will be provided by the Government.

34. Reference P-693 Construction Security Plan (CSP), paragraph II – PURPOSE, item 3 states “Special Use Space (SUS) construction requirements: SUS construction procedures require special site security staff members, unique material procurement procedures, oversight and risk mitigation methods, all of which are delineated in the CSP.” Please confirm special site security staff is not the responsibility of the general contractor and members will be hired directly by the government.

ANSWER: Confirmed.

35. Reference Drawing 14GI-G-022 Per drawing sheet 14GI-G-022, the secure storage area is 0.9 acres and wraps around majority of the construction site including the entire command center building. The secure storage area is included in the Construction Security Plan. Does this mean only US citizens are allowed to work on this project?

ANSWER: The secure storage space is only the area to the northeast of the Command Center approximately where the future General Purpose Warehouse will be located; it does not extend around the Command Center. US citizen and other workforce limitations are indicated in the

CSP.

36. P-693 Construction Security Plan (CSP), paragraph III – PROJECT DETAILS, item 3 states

“Security mitigations: To mitigate possible vulnerabilities the SSA may be guarded 24/7 by CAG personnel or utilize continuous CCTV when the site is not occupied. The Construction Security Contractor will install a fence shaker system, CCTV and Intrusion Detection System (IDS), and any other security measures to detect intrusion. The entire construction site will be protected with an 8 foot FE-6 type secure fence. Emergency Services will be allowed access as required in case of an emergency.”

Please confirm CAG personnel are by the government and not by the general contractor.

ANSWER: Confirmed.

37. P-693 Construction Security Plan (CSP), paragraph III – PROJECT DETAILS, item 4e

“During nonworking hours, the construction security contractor will secure the site against breeches by an intrusion detection system (IDS), 24/7 CAG manning of the ACF, roving patrols and monitoring of the CCTV system. The ACF will link to the Andersen Air Force Base Security Force via phone, two-way radio and duress system.”

Please confirm the construction security contractor is hired directly by the government and not the responsibility of the general contractor.

ANSWER: Confirmed.

38. P-693 Construction Security Plan (CSP), paragraph IV. ORGANIZATIONAL ROLES, RESPONSBILITIES, AND DEFINITIONS.

Please advise which of the roles listed in this section of the Construction Security Plan

(CSP) is the general contractors responsibility.

ANSWER: None.

39. Reference Command Center Drawings 14CC-A-201 & 202, 14CC-A-621. Conflict on the dimensions of Louvers between Building Elevations and Louver Schedule.

A back check on dimensions of Louvers shown on Building Elevations (drawings 14CC-A-

201 & 202) versus to the tabulated sizes on the Louver Schedule and Details (drawing 14CC-A-621) shows that there is a difference in the overall dimensions of the louvers. For example, L101 is 2’-5” W x 1’-8” H on Elevations but 2’-0” W x 1’-2” H on Louver Schedule and Details. This is typical for louvers L104, L105, L106, L107, L108, L110, L111, and L112.

Please confirm which drawing reference will be the basis of the louver dimensions.

ANSWER: Refer to louver schedule on 14CC-A-621 for correct Louver Face Area Size dimensions for louvers, and details below the schedule for a visual description of the louver sizes are shown in the schedule. Louvers are not dimensioned on elevations, as they are just a graphical representation of the louvers. Full louver rough openings are to be determined by GC, IAW schedule and 14CC-A-621 General Note A.

40. Reference Command Center Drawings 14CC-A-611, STC50 rating on Aluminum Door.

Door Schedule (drawing 14CC-A-611) calls for Door No. 130C to be STC50 rated.

Historically, aluminum door vendors are not able to meet the STC50 rating and therefore will not be in compliance with the drawings. Please kindly revisit and clarify.

ANSWER: Stainless steel is an acceptable alternate IAW General Sheet Note D on 14CC-A-611.

41. Reference Command Center Drawings 14CC-A-611 and Specification Section 08 71 00.00 14. Conflict on hardware set on Door Schedule and Door Hardware

Specifications.

Please see below clarifications on the finishing hardware between Door Schedule (drawing 14CC-A-611) and Door Hardware Specification 08 71 00.00 14. Please clarify.

1. Door No. 129B - HW Set #26 in Door Schedule but HW Set #16 in specification 08 71 00.00 14.

2. Door No. 151A - HW Set #17 in Door Schedule. HW Set #17 is “Not Used” in specification 08 71 00.00 14.

ANSWER:

1. Door Hardware set for 129B is #16.

2. Door Hardware set for 151A is 30A.

A revised door schedule will be issued via an Amendment.

42. Reference Power Plant Drawings 14PP-A-602, 14PP-A-611.

Missing reference drawings on Louver Schedule and Details. Louver Schedule and Details (drawing 14PP-A-611) references drawings A3/14PP-602, B3/14PP-602 and C3/14PP-602 for the head, jamb and sill details respectively for Louvers L101, L102, L103 and L104.

These drawings/details are not reflected in Drawing No. 14PP-A-602. Please provide.

ANSWER: Louver details for L101, L102, L103, and L104 will be the same as all other louvers in that the Head detail is C1/14PP-A-611, Jamb detail is B1/14PP-A-611, and Sill is A1/14PP-A-611. A revised louver schedule will be issued via Amendment.

43. Reference Access Control Drawings 14CC-A-401. Location of Electrical Yard (Room 150).

We can’t locate on the general site plan the exact location of Electrical Yard (Room 150) shown on 14AC-A-401. Please provide location.

ANSWER: The electrical yard enclosure location is shown on plan A1 – Site Electrical Utility Enlarged Plan on Sheet 14ST-EU401. The final location will be field verified to avoid conflicts with existing utilities and site features. Note, Sheet 14ST-CS101 called out in Sheet Keynote does not exist and is not required.

44. Reference Command Center Drawings 14CC-I-112 &114, 14CC-A-601 & 602.

Conflict in Finish Schedule and Floor Plan. Reference: Finish Schedule (14CC-A-602) and Floor Finish Plans (14CC-I-112 & 114) for Room 120B and Room 147.

In the Finish Schedule, it is CPT-1 (Carpet Tile); however, in the Floor Finish Plan, it is EM-1 (Recessed Entrance Mat). Please revisit and clarify.

ANSWER: The Finish Floor Plans are correct – All entrance vestibules (101, 120B, 147) are to have EM-1 Recessed Entrance Mat. A revised schedule will be issued via Amendment.

45. Reference Command Center Drawings 14CC-A-122, 14CC-A-602.

Conflict in Finish Schedule and Raised Access Floor Plan. Reference: Finish Schedule (14CC-A-602) and Raised Access Floor Plan (14CC-A-122) for Room 125.

In the Finish Schedule, it is RAF-1 (Raised Access Floor); however, in the Raised Access Floor Plan (14CC-A-122), it is Elevated Concrete Topping. Please revisit and clarify.

ANSWER: Room 125 is to have an elevated concrete topping. A revised schedule will be issued via Amendment.

46. Reference Command Center Drawings 14CC-A-124 &125, 14CC-A-602.

Conflict in Finish Schedule and Raised Access Floor Plan. Finish Schedule (14CC-A-602) and Raised Access Floor Plan (14CC-A-124 &125) for Room 137.

In the Finish Schedule, it is RAF-1 (Raised Access Floor); however, in the Raised Access Floor Plan (14CC-A-124 &125), it is a Structural Concrete Slab. Please revisit and clarify.

ANSWER: Room 137 is to be a bare structural concrete slab with no raised access floor. A revised schedule will be issued via Amendment.

47. Reference Command Center Specification Section 09 65 00.00 14, Resilient Flooring, paragraphs 2.1 & 2.3. Paragraph section applicable for VT1 Vinyl Tiles.

Specification 09 65 00.00 14 references paragraphs 2.1 (Vinyl Composition Tile) and 2.3

(Solid Vinyl Tile) as types of vinyl tile. Please clarify which paragraph section applies to the VT1 Vinyl Tiles floor finishes in Rooms no. 102,117,119, and 133.

ANSWER: Refer to paragraph 2.3 (Solid Vinyl Tile) for VT1.

48. Reference Specification Section 01 45 00.00 14 – Quality Control

Concrete & Rebar CQC Personnel. Page 12 of the experience matrix calls for continuous inspection of cast-in-place concrete operations. The Construction Security Plan, item 8 Construction Surveillance, Sub item ‘J” requires CST personnel to monitor the concrete pours & visually inspect the rebar. This appears to be a duplicate requirement.

Please confirm which of the two directions takes precedence or whether both will apply.

ANSWER: Both requirements are correct and will apply. The Government-provided CST are not monitoring for quality control purposes. The general contractor's CQC program is quality control. Both groups will need to coordinate closely.

49. Reference Drawing 14GI-G-022

Drawing Sheet 14GI-G-022 (see below),shows a separate fence surrounding the Command Center Building, Switchgear Building, Diesel Generator Area, and Fuel Tanks. Please advise what type of fence will be installed and if it requires privacy slats.

ANSWER: The fence lines requiring privacy screening are the Secure Storage Area IAW Note G on 14GI-G-022 and entire construction perimeter security fence IAW Note M on 14GI-G-022 in addition to the CSP. Fence type is FE-06 for both SSA and Construction boundary area fence line IAW specification 01 50 00.00 15 and Section 7.b on page 26 of the CSP.

50. Reference Drawing 14GI-G-022 (see below)

Please confirm the fence around the Future General Purpose Warehouse area is intended to be the Secure Storage Area.

ANSWER: Confirmed. Except, depending on construction sequencing chosen by general contractor, allowances for roads and other features may need considered.

51. Reference Drawing 14GI-G-022 Drawing Sheet 14GI-G-022 (see below),shows a separate fence surrounding the Command Center Building, Switchgear Building, Diesel Generator Area, and Fuel Tanks.

Please advise what type of fence will be installed and if it requires privacy slats.

ANSWER: The fence lines requiring privacy screening are the Secure Storage Area IAW Note G on 14GI-G-022 and entire construction perimeter security fence IAW Note M on 14GI-G-022 in addition to the CSP. Fence type is FE-06 for both SSA and Construction boundary area fence line IAW specification 01 50 00.00 15 and Section 7.b on page 26 of the CSP.

52. Construction Security Plan (CSP), I-General Information, item 9 indicates that Construction

Security Monitoring (CSM) contract shall be awarded to firms with Top Secret Facility Clearance. Please confirm who is the entity to engage the CSM contractor and issue CSM contract? Please clarify whether the Construction Security Monitoring contractor is engaged by Bidder (Construction Contractor) or by the Government

ANSWER: Government is responsible for the CSM.

53. Construction Security Plan (CSP).

The table of contents of Construction Security Plan indicates that there are Appendix D Access Control Facility and Appendix E Secure Storage area, but the two Appendix documents seem to be missing. Please provide.

ANSWER: Appendix D Access Control Facility and Appendix E Secure Storage area are for the Government Construction Security Monitor contractor (CSM), who will be responsible for all items within these annexes. These will be created by the CSM contractor and SSM upon contact award.

54. Construction Security Plan (CSP), IV - Organizational Roles, Responsibilities and

Definitions, and V. Facility Construction and Design Considerations #3 Construction Site Security lists various positions, personnel and responsibilities, but it does not clearly indicate what position or team shall be engaged by the Bidder or the Government. It appears that the bidder is responsible only for Secret cleared contractor personnel as one of certification/Decertification Team members.

Please clarify who is responsible for engaging SSO, AO, SSM, CST, CAG, Security Administrative Personnel, and Technical Support Personnel.

ANSWER: Government is responsible for all roles in this section.

55. Construction Security Plan (CSP), V. Facility Construction and Design Considerations, 1.a indicates that the Acquisition requirements for C4I materials are addressed in Appendix J, but we cannot find Appendix J. Please clarify.

ANSWER: Appendix J, C4I, is for the Government acquisition only, and it does not include any construction materials required within the GC's scope for construction material acquisition.

56. We are unable to locate the Small Business Subcontracting Plan Template at the end of RFP

Document 00 21 16. Please provide.

ANSWER: Small Business Subcontracting Plan Template issued with Amendment 0004.

57. Please advise if Chemical Termite Control is required. If yes, please provide the specifications.

ANSWER: See specification 31 31 16.19 14 for termite protection requirements. Chemical termite control is not required.

58. Reference Command Center Drawings 14CC-P-101 to 14CC-P-105. Radon Mitigation

System at the Command Center Building.

Drawing 14CC-P-101 through 14CC-P-105 do not indicate Radon Mitigation System.

Please check and confirm if the Command Center Building will require Radon Mitigation Piping.

ANSWER: Confirmed, Command Center does not require a radon mitigation system.

59. Reference Power Plant Drawings 14PP-M-703 and Detail C3/14PP-M-503. Fuel Filters at

Power Plant Building.

Fuel Filters are listed on the Fuel Filter Schedule on Drawing 14PP-M-703 with Detail

C3/14PP-M-503, but the specifications are not included in Section 33 57 55.00 14 Fuel System Components (Non-Hydrant).

Please check and provide specifications for the Fuel Filters.

ANSWER: See specification 33 57 55.00 14 section 2.11 for fuel filter information.

60. Reference Command Center Drawings 14CC-S-756 and 14CC-S-786. Pipe Supports at

Command Center Building.

Pipe Support Schedule on Drawing 14CC-S-756 indicates Pipe Support Detail DF-20.

However, Pipe Support Details on Drawing 14CC-S-786 does not include Detail DF-20.

Please provide Detail DF-20.

ANSWER: DF-20 is on S-786, and it is denoted as DF-20T on S-786 to show the possibility of using a brace, but the support assembly would just not have a bracing strut when there is no "T" or "L" denoted in the schedule. See general sheet note L on S-786.

61. Note 3 on page 2 of 4 of SF1442 states: “Multiple awards will not be made. However, Document 00 21 16 INSTRUCTIONS TO PROPOSERS/1.15 FAR 52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION (NOV 2021)/(f) Contract award/(6) states: “The Government reserves the right to make multiple awards if, after considering the additional administrative cost, it is in the Government’s best interest to do so.” These two sections of the RFP seem to be contradictory.

Please clarify the Government’s intent regarding multiple awards.

ANSWER: Per SF1442, “Multiple awards will not be made.”

62. DOC 00 22 00/ATTACHMENT C SMALL BUSINESS PARTICIPATION

COMMITMENT DOCUMENT (SBPCD)/4. Small Business Participation/ Paragraph b.

requires a “firm commitment” in writing in the form of a teaming agreement, joint venture agreement, mentor-protégé agreement, written/singed letter of commitment from the small business. Please consider extending the date when the SBPCD shall be submitted to NAVFAC since usually it takes time to execute said commitments and it will be extremely challenging to do so on bid day.

ANSWER: The Government has considered your request. The RFP remains unchanged.

File details come from the government source that posted it. Updated .