This is Amendment 0011 to RFP N62742-25-R-1301 for the FY25 MCON P-693 Guam Defense System Command Center project. The amendment updates multiple documents including the Project Table of Contents, SF1442 Price Proposal Schedule, Complementary Pricing Information, and numerous technical specifications and drawings.

Key changes include: updating the Work Order Number from 1764210 to 1812861, revising multiple drawings with new revision dates of January 28, 2025, replacing several specification sections including Summary of Work, Administrative Requirements, Building Commissioning, and various technical specifications covering demolition, concrete, welding, finishes, and electrical systems. The amendment also includes updates to the Construction Security Plan and Commissioning Plan. The revisions affect building details, cable reinforcing, fuel unloading systems, electrical plans, panel schedules, and various architectural and structural elements of the Command Center, Power Plant, and other facilities. No changes were made to the proposal due dates or overall project scope.

View the file

Other files

File Type Posted
25-1301 CmdCtrl Notice14.pdf PDF
Am-0011 Attachments 25-44.pdf PDF
Am-0011 Attachment 1_Revised Drawings dtd 1-28-2025.pdf PDF
Am-0011 Attachments 2-24.pdf PDF
25-1301 CmdCtrl Notice13.pdf PDF
25-1301 CmdCtrl Notice12.pdf PDF
25-1301 CmdCtrl Notice11.pdf PDF
Am-0010 Attachment 2_Revised Drawings_Signed.pdf PDF
Am-0010.pdf PDF
25-1301 CmdCtrl Notice10.pdf PDF
25-1301 CmdCtrl Notice9.pdf PDF
Attachment 1_Revised Drawings_dtd 13 and 20 Dec 2024.pdf PDF
Am-0009.pdf PDF
Am-0008.pdf PDF
25-1301 CmdCtrl Notice8.pdf PDF
P693_Sign-in Sheets_Redacted.pdf PDF
Am-0007.pdf PDF
Am-0007 Attachment 1_Revised Drawings dtd 13 Dec 2024.pdf PDF
Am-0006 Attachment 1_Revised Drawings dtd 6 Dec 2024.pdf PDF
Am-0006.pdf PDF
25-1301 CmdCtrl Notice7.pdf PDF
Am-0005 Attachment 1_Revised Drawings dtd 11-22-2024.pdf PDF
Am-0005.pdf PDF
25-1301 CmdCtrl Notice6.pdf PDF
25-1301 CmdCtrl Notice5.pdf PDF
R-P693_Drawings_Final_Vol14.6_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.5_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.8_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.2_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.1_20241007.pdf PDF
25-1301 CmdCtrl Notice4.pdf PDF
R-P693_Drawings_Final_Vol14.7_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.4_20241007.pdf PDF
Am-0004 Attachment 1_Revised Drawings dtd 11-15-2024.pdf PDF
25-1301 CmdCtr Notice3.pdf PDF
Am-0004.pdf PDF
Am-0003.pdf PDF
Am-0003 Attachment 1_Revised Drawings dtd 11-8-2024.pdf PDF
25-1301 CmdCtrl Notice2.pdf PDF
Am-0002.pdf PDF
Am-0001.pdf PDF
25-1301 CmdCtrl Notice1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.7_20241007.pdf PDF
P693_Drawings_Final_Vol14.3_20241007.pdf PDF
25-1301 P-693 RFP.pdf PDF
P693_Specs_Final_Vol02_20241007.pdf PDF
P693_Drawings_Final_Vol14.6_20241007.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

N62742-25-R-1301, FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER,

JOINT REGION MARIANAS, GUAM

Amendment No. 0011 is continued on page 2.

NAVFAC PACIFIC

CONSTR CONTRACTS BRANCH (CODE CON33)

258 MAKALAPA DR STE 100

JBPHH HI 96860-3134

N6274225R1301

1 8

02/05/2025

10/30/2024

RFP No. N6274225R1301

Amendment No. 0011

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

PROJECT TABLE OF CONTENTS

Delete page 1 in its entirety and replace with page 1 (Amendment 0011). The revised document incorporates changes to the WON from “1764210” to “1812861.”

SF1442

Removed water mark from page 2. Delete page 2 in its entirety and replace with page 2 (Amendment 0011).

SF1442 (CONTINUED) – PRICE PROPOSAL SCHEDULE

Delete pages 1 through 4 (Amendment 0009) in its entirety and replace with pages 1 through 4 (Amendment 0011).

DOCUMENT 00 21 16 COMPLEMENTARY PRICING INFORMATION

Delete Complementary Pricing Information pages 1 and 2 (Amendment No. 0004) in its entirety and replace with the attached page 1 (Amendment 0011). The revised document incorporates changes of “ITEM 0001AA” to “CLIN

0001.”

DOCUMENT 00 21 16 INSTRUCTIONS TO PROPOSERS

Delete page 1 (Amendment 00010) and replace with page 1 (Amendment 0011).

DOCUMENT 00 45 00 REPRESENTATIONS AND CERTIFICATIONS FOR CONTRACTING BY

NEGOTIATION – TABLE OF CONTENTS

Delete page 1 and replace with page 1 (Amendment 0011).

DOCUMENT 00 45 00 REPRESENTATIONS AND CERTIFICATIONS FOR CONTRACTING BY

NEGOTIATION

Delete pages 1 through 25 in its entirety and replace with pages 1 through 26 (Amendment 0011).

DOCUMENT 00 70 00 NEGOTIATED CONTRACT CLAUSES – TABLE OF CONTENTS

Delete pages 1 through 5 (Amendment 0005) in its entirety and replace with pages 1 through 5 (Amendment 0011).

DOCUMENT 00 70 00 NEGOTIATED CONTRACT CLAUSES

Delete pages 1 through 40 (Amendment 0005) in its entirety and replace with pages 1 through 40 (Amendment

0011).

DOCUMENT 00 73 00 SPECIAL CONTRACT REQUIREMENTS – TABLE OF CONTENTS

Delete pages 1 in its entirety and replace with page 1 (Amendment 0011). The revised document incorporates changes to the WON from “1764210” to “1812861.”

DOCUMENT 00 73 00 SPECIAL CONTRACT REQUIREMENTS

Delete pages 1 through 6 in its entirety and replace with pages 1 through 6 (Amendment 0011). The revised document incorporates changes to the WON from “1764210” to “1812861.”

SECTION 00 01 15.00 14 – LIST OF DRAWINGS

PARA 1.2 CONTRACT DRAWINGS: The following drawings, bearing revision date of 28 January 2025, supersede previously issued drawings bearing the same number and title. The revised drawings accompany this

Amendment. See Attachment (1).

NAVFAC

DWG NO.

SHEET NO. REV NO. TITLE

17323315 14ST-C-508 1 CABLE REINFORCING DETAILS SHEET 1

17323316 14ST-C-509 1 CABLE REINFORCING DETAILS SHEET 2

17323324 14ST-C-518 1 FUEL UNLOADING DETAILS - SHEET 2

17323345 14ST-S-102 1 SITE - FOUNDATION PLAN - FUEL UNLOADING

NAVFAC

DWG NO.

SHEET NO. REV NO. TITLE

17323387 14ST-ES104 2 SITE ELECTRICAL PLAN -PANEL B01

17323389 14ST-ES106 2 SITE ELECTRICAL PLAN -PANEL B03

17323390 14ST-ES107 2 SITE ELECTRICAL PLAN -PANEL C01

17323397 14ST-ES401 2 ENLARGED PLAN - FUEL UNLOADING

17323415 14ST-EP518

SITE – ELECTRICAL DETAIL – MANHOLE AND

HANDHOLE

17323419 14ST-EP701 3 SITE - PANEL SCHEDULE

17323437 14ST-EP702 3 SITE - PANEL SCHEDULE

17323435 14ST-EI601 2 SITE - FACILITY AND ACTIVE VEHICLE BARRIER

CONTROL SYSTEMS BLOCK DIAGRAM

17323504 14CC-S-005 1 COMMAND CENTER - GENERAL NOTES

17323747 14CC-A-201 1 COMMAND CENTER - BUILDING ELEVATIONS

17323748 14CC-A-202 1 COMMAND CENTER - BUILDING ELEVATIONS

17323751 14CC-A-303 2 COMMAND CENTER - SECTION

17323752 14CC-A-304 3 COMMAND CENTER - SECTION

17323753 14CC-A-311 3 COMMAND CENTER - WALL SECTIONS

17323754 14CC-A-312 3 COMMAND CENTER - WALL SECTIONS

17323755 14CC-A-313 3 COMMAND CENTER - WALL SECTIONS

17323756 14CC-A-314 3 COMMAND CENTER - WALL SECTIONS

17323757 14CC-A-315 4 COMMAND CENTER - WALL SECTIONS

17323780 14CC-A-435 2 COMMAND CENTER - ENLARGED STAIR AND

RAILING DETAILS

17323792 14CC-A-521 1 COMMAND CENTER - ENLARGED DETAILS

17323804 14CC-A-601 3 COMMAND CENTER - FINISH LEGEND

17323913 14CC-M-702 1 COMMAND CENTER - MECHANICAL SCHEDULES

17324043 14CC-EP409 1 COMMAND CENTER - ENLARGED POWER PLAN

17324052 14CC-EP601 1 COMMAND CENTER - ONE-LINE DIAGRAM -

SERVICE & LOW VOLTAGE SWITCHGEAR A

17324053 14CC-EP602 1 COMMAND CENTER - ONE-LINE DIAGRAM -

RIDETHROUGH UPS A

17324054 14CC-EP603 1 COMMAND CENTER - ONE-LINE DIAGRAM -

GRACEFUL SHUTDOWN UPS A

17324057 14CC-EP606 1 COMMAND CENTER - ONE-LINE DIAGRAM -

RIDETHROUGH UPS B

17324058 14CC-EP607 1 COMMAND CENTER - ONE-LINE DIAGRAM -

GRACEFUL SHUTDOWN UPS B

17324129 14CC-EG401 1 COMMAND CENTER - ENLARGED GROUNDING

PLAN

17324135 14CC-EG502 2 COMMAND CENTER - GROUNDING DETAILS

17324145 14CC-EG601 1 COMMAND CENTER - GROUNDING RISER

DIAGRAM

17324429 14PP-S-005 1 POWER PLANT - GENERAL NOTES

17324442 14PP-S-201 2 POWER PLANT - WALL ELEVATIONS

17324443 14PP-S-202 2 POWER PLANT - WALL ELEVATIONS

17324460 14PP-S-203 1 POWER PLANT - WALL ELEVATIONS

SHEET NO. REV NO. TITLE

17324455 14PP-S-540 1 POWER PLANT - MASONRY DETAILS

17324459 14PP-S-610 1 POWER PLANT - WALL PENETRATION SCHEDULE

17324479 14PP-A-112 2 POWER PLANT - FIRST FLOOR PLAN - AREA A

17324481 14PP-A-121 1 POWER PLANT - FIRST FLOOR REFLECTED

CEILING PLAN - AREA A

17324482 14PP-A-131 1 POWER PLANT - ROOF PLAN

17324484 14PP-A-201 2 POWER PLANT - BUILDING ELEVATIONS

17324485 14PP-A-202 2 POWER PLANT - BUILDING ELEVATIONS

17324486 14PP-A-301 2 POWER PLANT - BUILDING SECTIONS

17324487 14PP-A-501 2 POWER PLANT - WALL SECTIONS

17324494 14PP-A-502 1 POWER PLANT - WALL SECTIONS

17324488 14PP-A-521 1 POWER PLANT - ENLARGED DETAILS

17324489 14PP-A-601 3 POWER PLANT - ROOM FINISH SCHEDULE AND

FINISH LEGEND

17323204 14GI-E-002 1 ELECTRICAL LEGEND AND NOTES

17323205 14GI-E-003 1 GENERAL - ELECTRICAL LEGEND AND NOTES

17324573 14PP-EP518 1 POWER PLANT - ELECTRICAL DETAILS -

MANHOLE

17324586 14PP-EP651 2 POWER PLANT - ONE-LINE DIAGRAM – BREAKER

DETAILS

17324612 14PP-EP701 2 POWER PLANT - PANEL SCHEDULE

17324613 14PP-EP702 3 POWER PLANT - PANEL SCHEDULE

17324614 14PP-EP703 1 POWER PLANT - PANEL SCHEDULE

17324640 14PP-EG601 1 POWER PLANT - GROUNDING RISER

PARA 1.2 CONTRACT DRAWINGS: Changes as directed below shall be made to the respective drawings. Drawings incorporating the directed changes are not issued with this Amendment.

NAVFAC

DWG NO.

SHEET NO.

CHANGE

NO. TITLE / DIRECTED CHANGES

17323545 14CC-S-516 (1) COMMAND CENTER – SEISMIC ISOLATION

SYSTEM INTERFACE SECTIONS AND DETAILS

At Detail B3 Isolator Capital Section, change callout references “SEE DETAIL D3/14CC-S-516” to “SEE

DETAIL C3/14CC-S-516” (two locations).

17324480 14PP-A-113 (1) POWER PLANT – FIRST FLOOR PLAN – AREA B

At Keynote #04, Change “Silicone” to “Acrylic”

17324484 14PP-A-201 (1) POWER PLANT – BUILDING ELEVATIONS

At Keynotes #13 and 16, Change “Silicone” to “Acrylic”

17324485 14PP-A-202 (1) POWER PLANT – BUILDING ELEVATIONS

At Keynotes #13 and 16, Change “Silicone” to “Acrylic”

17324486 14PP-A-301 (1) POWER PLANT – BUILDING SECTIONS

At Keynotes ##12 and 17, Change “Silicone” to “Acrylic”

17324487 14PP-A-501 (1) POWER PLANT – WALL SECTIONS

At Keynotes #05 and 06, change delta number in the triangle from “1” to “2”

SHEET NO.

CHANGE

NO. TITLE / DIRECTED CHANGES

17324489 14PP-A-601 (1) POWER PLANT – ROOM FINISH SCHEDULE AND

FINISH LEGEND

At Finish Legend, Exterior Finishes, Change “Acrylic

Elastomeric Coating at…” to “Acrylic Elastomeric

Coating at Precast Wall Panels”

17324495 14PP-A-611 (1) POWER PLANT – LOUVER SCHEDULE AND

DETAILS Add General Note: “D. STAINLESS STEEL IS

AN ACCEPTABLE ALTERNATIVE MATERIAL TO

ALUMINUM FOR EXTERIOR LOUVERS.”

17324750 14AC-S-402 (1) ACCESS CONTROL – ELECTRICAL YARD –

SECTIONS AND DETAILS

At Detail B1 Section, delete callout “#4 @ 12”, OC EA

FACE” and delete callout “#5 @ 10” OC EACH FACE”.

These callouts conflict with the correct callouts shown elsewhere in the detail.

SECTION 01 11 00.00 14 SUMMARY OF WORK

Delete this Section in its entirety and replace with SECTION 01 11 00.00 14 SUMMARY OF WORK (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (2).

SECTION 01 14 00.00 14 WORK RESTRICTIONS

At the end of the Section, replace the appendix “P-693 Construction Security Plan (CSP)” dated 6 September 2024 incorporating change 1, dated 3 Jan 2025 with appendix “P-693 Construction Security Plan (CSP)” dated 6

September 2024 incorporating change 3, dated 21 Jan 2025. The revised appendix accompanies this Amendment.

See Attachment (3).

SECTION 01 30 00.00 14 ADMINISTRATIVE REQUIREMENTS

Delete this Section in its entirety and replace with SECTION 01 30 00.00 14 ADMINISTRATIVE

REQUIREMENTS (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (4).

SECTION 01 74 19.00 14 CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

Delete this Section in its entirety and replace with SECTION 01 74 19.00 14 CONSTRUCTION WASTE

MANAGEMENT AND DISPOSAL (dtd 28JAN2025). The revised Section accompanies this Amendment. See

Attachment (5).

SECTION 01 91 00.15 14 BUILDING COMMISSIONING

Delete this Section in its entirety and replace with SECTION 01 91 00.15 14 BUILDING COMMISSIONING

(dtd 04FEB2025). The revised Section accompanies this Amendment. See Attachment (6).

Commissioning Plan. Delete this Appendix in its entirety and replace with COMMISSIONING PLAN (dtd

JAN2025). The revised Appendix accompanies this Amendment. See Attachment (7).

SECTION 01 91 19.00 14 BUILDING ENCLOSURE COMMISSIONING

Delete this Section in its entirety and replace with SECTION 01 91 19.00 14 BUILDING ENCLOSURE

COMMISSIONING (dtd 04FEB2025). The revised Section accompanies this Amendment. See Attachment (8)

SECTION 02 41 00.00 14 DEMOLITION

Delete this Section in its entirety and replace with SECTION 02 41 00.00 14 DEMOLITION (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (9).

SECTION 02 61 13.00 14 EXCAVATION AND HANDLING OF CONTAMINATED MATERIAL

Delete this Section in its entirety and replace with SECTION 02 61 13.00 14 EXCAVATION AND HANDLING

OF CONTAMINATED MATERIAL (dtd 28JAN2025). The revised Section accompanies this Amendment. See

Attachment (10).

SECTION 03 30 00.00 14 CAST-IN-PLACE CONCRETE

Delete this Section in its entirety and replace with SECTION 03 30 00.00 14 CAST-IN-PLACE CONCRETE (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (11).

SECTION 05 05 20.00 14 POST-INSTALLED CONCRETE AND MASONRY ANCHORS

Delete this Section in its entirety and replace with SECTION 05 05 20.00 14 POST-INSTALLED CONCRETE

AND MASONRY ANCHORS (dtd 28JAN2025). The revised Section accompanies this Amendment. See

Attachment (12).

SECTION 05 05 23.16 14 STRUCTURAL WELDING

Delete this Section in its entirety and replace with SECTION 05 05 23.16 14 STRUCTURAL WELDING (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (13).

SECTION 05 12 00.00 14 STRUCTURAL STEEL

Delete this Section in its entirety and replace with Section 05 12 00.00 14 STRUCTURAL STEEL (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (14).

SECTION 06 20 00.00 14 FINISH CARPENTRY

Delete this Section in its entirety and replace with Section 06 20 00.00 14 FINISH CARPENTRY (dtd 28JAN2025).

The revised Section accompanies this Amendment. See Attachment (15).

SECTION 06 41 16.10 14 PLASTIC-CLAD ARCHITECTURAL CABINETS

Delete this Section in its entirety and replace with Section 06 41 16.10 14 PLASTIC-CLAD ARCHITECTURAL

CABINETS (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (16).

SECTION 06 61 16.00 14 SOLID SURFACING FABRICATIONS

Delete this Section in its entirety and replace with Section 06 61 16.00 14 SOLID SURFACING FABRICATIONS

(dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (17).

SECTION 07 27 10.00 14 AIR BARRIER SYSTEM

Delete this Section in its entirety and replace with Section 07 27 10.00 14 AIR BARRIER SYSTEM (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (18).

SECTION 09 30 10.00 14 CERAMIC AND PORCELAIN TILING

Delete this Section in its entirety and replace with Section 09 30 10.00 14 CERAMIC AND PORCELAIN TILING

(dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (19).

SECTION 09 51 00.00 14 ACOUSTICAL CEILINGS

Delete this Section in its entirety and replace with Section 09 51 00.00 14 ACOUSTICAL CEILINGS (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (20).

SECTION 09 62 38.00 14 STATIC-CONTROL FLOORING

Delete this Section in its entirety and replace with Section 09 62 38.00 14 STATIC-CONTROL FLOORING (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (21).

SECTION 09 65 00.00 14 RESILIENT FLOORING

Delete this Section in its entirety and replace with Section 09 65 00.00 14 RESILIENT FLOORING (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (22).

SECTION 09 68 00.00 14 CARPETING

Delete this Section in its entirety and replace with Section 09 68 00.00 14 CARPETING (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (23).

SECTION 09 69 13.00 14 RIGID GRID ACCESS FLOORING

Delete this Section in its entirety and replace with Section 09 69 13.00 14 RIGID GRID ACCESS FLOORING (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (24).

SECTION 09 84 20.00 14 ACOUSTICAL WALL PANELS

Delete this Section in its entirety and replace with Section 09 84 20.00 14 ACOUSTICAL WALL PANELS (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (25).

SECTION 09 90 00.00 14 PAINTS AND COATINGS

Delete this Section in its entirety and replace with Section 09 90 00.00 14 PAINTS AND COATINGS (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (26).

SECTION 09 96 00.00 14 HIGH PERFORMANCE COATINGS

Delete this Section in its entirety and replace with Section 09 96 00.00 14 HIGH PERFORMANCE COATINGS

(dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (27).

SECTION 10 11 00.00 14 VISUAL DISPLAY UNITS

Delete this Section in its entirety and replace with Section 10 11 00.00 14 VISUAL DISPLAY UNITS (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (28).

SECTION 10 14 00.10 14 EXTERIOR SIGNAGE

Delete this Section in its entirety and replace with Section 10 14 00.10 14 EXTERIOR SIGNAGE (dtd 28JAN2025).

The revised Section accompanies this Amendment. See Attachment (29).

SECTION 10 14 00.20 14 INTERIOR SIGNAGE

Delete this Section in its entirety and replace with Section 10 14 00.20 14 INTERIOR SIGNAGE (dtd 28JAN2025).

The revised Section accompanies this Amendment. See Attachment (30)

SECTION 10 21 13.00 14 TOILET COMPARTMENTS

Delete this Section in its entirety and replace with Section 10 21 13.00 14 TOILET COMPARTMENTS (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (31).

SECTION 10 22 39.00 14 FOLDING PANEL PARTITIONS

Delete this Section in its entirety and replace with Section 10 22 39.00 14 FOLDING PANEL PARTITIONS (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (32).

SECTION 10 26 00.00 14 WALL AND DOORS PROTECTIONS

Delete this Section in its entirety and replace with Section 10 26 00.00 14 WALL AND DOORS PROTECTIONS

(dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (33).

SECTION 10 28 13.00 14 TOILET ACCESSORIES

Delete this Section in its entirety and replace with Section 10 28 13.00 14 TOILET ACCESSORIES (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (34).

PARA. 2.1.14 Lavatory Solid Surface Countertop Unit with High Impact Polymer Base Cover, Integral Faucets and Soap Dispensers; Line 3: Change “(1 - 1/2 inches thick)” to “(1/2 inch thick)”.

SECTION 10 51 13.00 14 METAL LOCKERS

Delete this Section in its entirety and replace with Section 10 51 13.00 14 METAL LOCKERS (dtd 28JAN2025).

The revised Section accompanies this Amendment. See Attachment (35).

SECTION 26 20 00.00 14 INTERIOR DISTRIBUTION SYSTEM

Delete this Section in its entirety and replace with Section 26 20 00.00 14 INTERIOR DISTRIBUTION SYSTEM

(dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (36).

SECTION 26 32 15.00 14 ENGINE-GENERATOR SET STATIONARY 15-2500 KW, WITH AUXILIARIES

Delete this Section in its entirety and replace with Section 26 32 15.00 14 ENGINE-GENERATOR SET

STATIONARY 15-2500 KW, WITH AUXILIARIES (dtd 28JAN2025). The revised Section accompanies this

Amendment. See Attachment (37).

SECTION 26 33 53.00 14 STATIC UNINTERRUPTIBLE POWER SUPPLY (UPS)

Delete this Section in its entirety and replace with Section 26 33 53.00 14 STATIC UNINTERRUPTIBLE POWER

SUPPLY (UPS) (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (38).

SECTION 26 55 53.00 14 SECURITY LIGHTING

Delete this Section in its entirety and replace with Section 26 55 53.00 14 SECURITY LIGHTING (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (39).

SECTION 31 21 13.00 14 RADON MITIGATION

Delete this Section in its entirety and replace with Section 31 21 13.00 14 RADON MITIGATION (dtd

28JAN2025). The revised Section accompanies this Amendment. See Attachment (40).

SECTION 32 12 16.16 14 ROAD-MIX ASPHALT PAVING

Delete this Section in its entirety and replace with Section 32 12 16.16 14 ROAD-MIX ASPHALT PAVING (dtd

9JAN2025). The revised Section accompanies this Amendment. See Attachment (41).

SECTION 32 31 13.00 14 CHAIN LINK SECURITY FENCES AND GATES

Delete this Section in its entirety and replace with Section 32 31 13.00 14 CHAIN LINK SECURITY FENCES

AND GATES (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (42).

SECTION 33 56 10.00 14 FACTORY-FABRICATED FUEL STORAGE TANKS

PARA. 2.4.1.1 Double Wall Steel Tank (Fire-Resistant, Protected), Line 2: Change “stainless steel” to “carbon steel.”

SECTION 33 57 55.00 14 FUEL SYSTEM COMPONENTS (NON-HYDRANT)

Delete this Section in its entirety and replace with Section 33 57 55.00 14 FUEL SYSTEM COMPONENTS (NON-

HYDRANT) (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (43).

SECTION 33 71 02.00 14 UNDERGROUND ELECTRICAL DISTRIBUTION

Delete this Section in its entirety and replace with Section 33 71 02.00 14 UNDERGROUND ELECTRICAL

DISTRIBUTION (dtd 28JAN2025). The revised Section accompanies this Amendment. See Attachment (44).

-- End of Amendment --

FY25 MCON MDA-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER WON 1764210 1812861

RFP N62742-25-R-1301

Amendment No. 0011

(1) REQUEST FOR PROPOSAL DOCUMENTS FOR N62742-25-R-1301

(A) SOLICITATION, OFFER AND AWARD (SF1442) (Rev. 4-85)

(B) 00 21 16 INSTRUCTIONS TO PROPOSERS

(C) 00 01 15 LIST OF DRAWINGS

(D) 00 22 00 EVALUATION FACTORS FOR AWARD

(E) 00 45 00 REPRESENTATIONS AND CERTIFICATIONS

(F) 00 70 00 NEGOTIATED CONTRACT CLAUSES (BY REFERENCE)

(G) 00 73 00 SPECIAL CONTRACT REQUIREMENTS

(H) NAVFAC SPECIFICATION WORK ORDER NO. (WON) 1764210 1812861

(2) CONTRACT FORMS AND CONDITIONS OF THE CONTRACT

(A) SOLICITATION, OFFER AND AWARD (SF1442) (Rev. 4-85) AND AMENDMENTS

(B) 00 01 15 LIST OF DRAWINGS

(C) 00 70 00 NEGOTIATED CONTRACT CLAUSES (FULL TEXT)

(D) 00 73 00 SPECIAL CONTRACT REQUIREMENTS

(E) NAVFAC SPECIFICATION WORK ORDER NO. (WON) 1764210 1812861

20B. SIGNATURE

(REV. 4-85)STANDARD FORM 1442 BACK

TO SIGN

NSN 7540-01-155-3212

SOLICITATION, OFFER, AND AWARD (Continued) (Construction, Alteration, or Repair)

CODE FACILITY CODE

17. The offeror agrees to perform the w ork required at the prices specif ied below in strict accordance w ith the terms of this solicitation, if this offer is accepted by the Government in w riting w ithin ________ calendar days after the date offers are due.

the minimum requirements stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)

AMOUNTS SEE SCHEDULE OF PRICES

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

AMENDMENT NO.

DATE

20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN

OFFER (Type or print)

AWARD (To be completed by Government)

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

(4 copies unless otherwise specified)

CODE

(Insert any number equal to or greater than

20C. OFFER DATE

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c) 41 U.S.C. 253(c)

CODE27. PAYMENT WILL BE MADE BY:26. ADMINISTERED BY

(Include ZIP Code)14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NO. (Include area code)

See Item 14

(Include only if different than Item 14)16. REMITTANCE ADDRESS

30B. SIGNATURE

29. AWARD (Contractor is not required to sign this document.)

document and return _______ copies to issuing office.) Contractor agrees Your of f er on this solicitation, is hereby accepted as to the items listed. This award con-to f urnish and deliv er all items or perf orm all work, requisitions identif ied summates the contract, which consists of (a) the Gov ernment solicitation and on this f orm and any continuation sheets f or the consideration stated in this y our of f er, and (b) this contract award. No f urther contractual document is contract. The rights and obligations of the parties to this contract shall be necessary .

gov erned by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certif ications, and specif ications or incorporated by ref er-ence in or attached to this contract.

30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31A. NAME OF CONTRACTING OFFICER (Type or print)

30C. DATE

(Type or print)

TEL: EMAIL:

31B. UNITED STATES OF AMERICA 31C. AWARD DATE

BY

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

(Contractor is required to sign this28. NEGOTIATED AGREEMENT

(M ust be fully completed by offeror)OFFER dayna.matsumura Typewritten Text

FY25 MCON P-693, PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER WON 1812861

SF 1442 (Continued)

Amendment No. 0009 0011

PRICE PROPOSAL SCHEDULE

THIS PROJECT IS STILL SUBJECT TO COMPLETION OF THE NATIONAL ENVIRONMENTAL POLICY

ACT (NEPA) PROCESS AND REQUIRED CONSULTATIONS. THE GOVERNMENT RESERVES THE

RIGHT TO CANCEL OR AMEND THE RFP IF NECESSARY; THE GOVERNMENT DOES NOT INTEND TO

PAY ANY PROPOSAL PREPARATION COSTS IN THE EVENT THAT THE SOLICITATION IS

CANCELLED OR AMENDED PRIOR TO AWARD. THE GOVERNMENT MAY PROCEED TO AWARD

PRIOR TO COMPLETION OF NEPA AND REQUIRED CONSULTATIONS; IN THAT CASE, PENDING

COMPLETION OF NEPA AND REQUIRED CONSULTATIONS, THE CONTRACTOR WILL RECEIVE

ONLY A LIMITED NOTICE TO PROCEED THAT DOES NOT AUTHORIZE ANY GROUND DISTURBING

ACTIVITY WITH THE POTENTIAL TO IMPACT NATURAL OR CULTURAL RESOURCES; NO

ADDITIONAL COMPENSATION WILL BE PAID AS A RESULT OF PROVISION OF AN INITIAL LIMITED

NOTICE TO PROCEED.

AN AWARD RESULTING FROM THIS SOLICITATION IS SUBJECT TO RECEIPT OF CONGRESSIONAL /

PRESIDENTIAL APPROVAL OF THE FY25 NATIONAL DEFENSE AUTHORIZATION ACT AND THE FY25

MILITARY CONSTRUCTION QUALITY OF LIFE AND VETERANS AFFAIRS APPROPRIATIONS ACT.

ITEM

NO. SUPPLIES/SERVICES QTY UNIT UNIT PRICE AMOUNT

BASE ITEM

Command Center

The basis for CLIN 0001 is the price for the entire work for the Command Center, complete and in accordance with the drawings and specifications for WON

1812861 but not including work specified in any other CLINs/SLINs.

1 Project $ __________________

TOTAL OF CLIN 0001

0002 OPTION 1 – Generator No. 02 & Fuel

Tank No. 02

The basis for CLIN 0002 is the price for all labor, material, and equipment to install one generator and fuel tank #2, complete and in accordance with the drawings and specifications, but not including any other CLINs/SLINs.

1 Project $_________________

0003 OPTION 2 – Generator No. 03 (N+1)

The basis for CLIN 0003 is the price for all labor, material, and equipment to install one generator, complete and in accordance with the drawings and specifications, but not including any other CLINs/SLINs.

0004 OPTION 3 – Generator No. 04 (N+2)

The basis for CLIN 0004 is the price for all labor, material, and equipment to install one generator, complete and in accordance with the drawings and

Amendment No. 0009 0011 specifications, but not including any

0005 OPTION 4 - (B-side Uninterruptible

Power Supply)

The basis for CLIN 0005 is the price for all labor, material, and equipment to install Uninterruptible Power Supply in the command center, complete and in accordance with the drawings and specifications, but not including any

0006 OPTION 5 – (B-side Redundancy)

The basis for CLIN 0006 is the price for all labor, material, and equipment to install B-side Redundancy in the Power

Plant and Command Center, complete an in accordance with the drawings and specifications, but not including any

0007 FURNITURE, FIXTURES, AND EQUIPMENT:

0007AA Planned Modification: Furniture, Fixture and Equipment

Gov’t

Estimated Amount

$2,372,421.00

0007AB Handling and Administrative Rate (HAR) NTE 5% ______% $_____________

TOTAL OF CLIN 0007

(Total of SLINs 0007AA thru 0007AB)

TOTAL OF CLINS 0001 through 0007 $___________________

Notes:

1. See Document 00 22 00 for the Price Evaluation. The proposed price for CLINs 0001 through 0007 will form the basis for the evaluation noted in Document 00 22 00.

2. The Offeror SHALL include a price for ALL CLINs. The Government will not adjust the quantities noted in the schedule at the time of award (Ref: FAR 52.215-1(f)(5)).

3. Multiple awards will not be made (Ref: FAR 52.215-1(f)(6)).

4. See Document 00 22 00, para 2.4 for the price evaluation.

5. The following notes apply to CLINs 0002 through 0006.

a. CLIN 0002 OPTION 1 – Provide the second generator and the second fuel tank (with a single generator and a fuel tank provided with base bid). The scopes included in option 1 are:

Amendment No. 0009 0011

1. Provide medium voltage generator set (DG-14PP61112) with outdoor-rated walk-in enclosure including related feeder and neutral ground resistor.

2. Provide generator medium voltage switchgear (MVS-14PP61112) equipped with protective relaying, medium voltage circuit breakers, controls, instrumentation, and metering including related feeders.

3. Provide medium voltage circuit breaker (52-T2A) including related protective relaying at medium voltage switchgear (MVS-14PP61101A).

4. Provide above ground conduits to support medium voltage generator set (DG-14PP61112).

5. Provide PCMS cabinet (PCMS-14PP69122) for medium voltage generator (DG-14PP61112) including any related equipment and circuits.

6. Provide Bulk Fuel Tank (FBT-14PP03102) and associated fuel polisher.

7. Provide Fuel piping and associated instrumentation/valves for DG-14PP6112.

8. Provide branch circuit(s) for electrically powered loads related with Bulk Fuel Tank (FBT-14PP03102)

9. Power circuits to equipment and systems installed under option 1.

b. CLIN 0003 OPTION 2 – Provide the third generator. The scopes included in option 2 are:

1. Provide medium voltage generator set (DG-14PP61113) with outdoor-rated walk-in enclosure including related feeder and neutral ground resistor.

2. Provide generator medium voltage switch (MVS-14PP61113) equipped with protective relaying, medium voltage circuit breakers, controls, instrumentation, and metering including related feeders.

3. Provide medium voltage circuit breaker (52-T3A) including related protective relaying at medium voltage switchgear (MVS-14PP61101A).

4. Provide above ground conduits to support medium voltage generator set (DG-14PP61113).

5. Provide PCMS cabinet (PCMS-14PP69123) for medium voltage generator (DG-14PP61113) including any related equipment and circuits.

6. Power circuits to equipment and systems installed under option 2.

c. CLIN 0004 OPTION 3 – Provide the fourth generator. The scopes included in option 3 are:

1. Provide medium voltage generator set (DG-14PP61114) with outdoor-rated walk-in enclosure including related feeder and neutral ground resistor.

2. Provide generator medium voltage switchgear (MVS-14PP61114) equipped with protective relaying, medium voltage circuit breakers, controls, instrumentation, and metering including related feeders.

3. Provide medium voltage circuit breaker (52-T4A) including related protective relaying at medium voltage switchgear (MVS-14PP61101A).

4. Provide medium voltage circuit breaker (52-T4B) including related protective relaying at medium voltage switchgear (MVS-14PP61101B).

5. Provide above ground conduits to support medium voltage generator set (DG-14PP61114).

6. Provide PCMS cabinet (PCMS-14PP69124) for medium voltage generator (DG-14PP61114) including any related equipment and circuits.

7. Power circuits to equipment and systems installed under option 3.

d. CLIN 0005 OPTION 4 – Provide B-side UPS systems equipment in the Command Center. The scopes included in option 4 are:

1. Provide Command Center Ride Through UPS (UPS-14CC61101B) including related batteries, UPS input, and static switch feeders.

2. Provide Command Center Graceful Shutdown UPS (UPS-14CC61102B) including related batteries, UPS input, and static switch feeders.

3. Power circuits to equipment and systems installed under option 4.

e. CLIN 0006 OPTION 5 – Provide select B-side systems and equipment in the Power Plant and Command

Center. The scopes included in option 5 are:

1. Provide PCMS cabinet (PCMS-14PP69101B) for low voltage switchgear (LVS-14PP61101B) including any related equipment and circuits.

2. Provide medium voltage switchgear (MVS-14PP611101B) equipped with protective relaying, medium voltage circuit breakers, controls, instrumentation, and metering including related feeders; Space only for one medium voltage circuit breaker cubicle (52-T4B)

Amendment No. 0009 0011

3. Provide medium voltage feeder between sectionalizing cabinet (SECT-14ST61101) and medium voltage switchgear (MVS-14PP61101B).

4. Provide Power Plant transformer (XFMR-14PP61121B) including related feeder.

5. Provide low voltage switchgear (LVS-14PP61101B) equipped with main and distribution low voltage, draw-out type, power circuit breakers, controls, instrumentation, and metering including related feeders.

6. Provide low voltage tie feeder between low voltage switchgears (LVS-14PP61101A and LVS-

14PP61101B).

7. Provide low voltage normal supply ATS feeder between low voltage switchgear (LVS-14PP61101B) and motor control center (MCC-14PP61101B).

8. Provide low voltage alternate supply ATS feeder between low voltage switchgear (LVS-14PP61101B) and motor control center (MCC-14PP61101A).

9. Provide Command Center pad-mounted transformer (XFMR-14CC61101B) including related feeder.

Feeders from Power Plant Switchgear Building MVS to XFMR-14CC61101B primary and from

XFMR secondary to the Command Center LVS.

10. Provide DC Plant System consisting of DC/AC inverter (INV-14PP61101B), battery charger (BC-

14PP61101B), batteries (BATT-14PP61101B), AC branch circuit panelboard (UPP-14PP61101B), DC branch circuit panelboard (DCP-14PP61101B), control panel (CP-14PP61101B) and enclosed circuit breaker (ECB-14PP61101B).

11. Power circuits to equipment and systems installed under option 5.

6. The following notes apply to SLIN 0007AA, Furniture, Fixtures and Equipment (FF&E):

a. Government Estimated Amount for FF&E. The Government Estimate for FF&E, as shown above (SLIN

0007AB), includes the material cost, freight and installation charges. The Government Estimate has been identified to provide offerors with the projected magnitude of effort for FF&E. The Government Estimate includes the actual material cost including freight and installation charges and Prime Contractor’s proposed Handling and

Administrative Rate (HAR).

b. Prime Contractor Handling and Administration Rate (HAR). Offerors may propose a HAR fee in SLIN

0007AB, up to but not to exceed 5%, for the handling and administration of the FF&E. This fee will account for all administrative costs, overhead, bonding fees, administration of subcontractors, profit and any other costs associated with, related to the coordination, and processing of the procurement and installation of the FF&E. The prime contractor’s proposed HAR mark-up shall be applied to the Government Estimate to derive a total proposed price for

SLIN 0007AB.

c. The prime contractor’s HAR percentage rate will be incorporated into the contract as proposed and will not be adjusted regardless of fluctuations in the Government Estimate. The HAR is a fixed percentage rate. When the final FF&E package is priced, the contractor’s HAR percentage rate, as incorporated into the contract, shall be applied to the supplier/vendor quotes to derive a total proposed price for final negotiation of the planned modification.

d. It is anticipated that a planned modification will be awarded at least nine months prior to the completion of the work. The planned modification will be issued after receipt of appropriate funding. A minimum of nine months is required for the contractor to purchase, deliver and install the FF&E without impacting the overall completion date of the project. No schedule extensions will be granted if the modification is executed at least nine months prior to the contract completion date. If the Government decides to negotiate and award the modification with less than nine months prior to the contract completion date, the contractor may be entitled to a contract extension.

7. DFARS 252.247-7023, TRANSPORTATION OF SUPPLIES BY SEA. Within 30 days of each shipment, the Contractor is required to provide an electronic copy of the carrier’s bill of lading to the Contracting Officer and to MARAD via email. MARAD email: Cargo.MARAD@dot.gov (attn.: MIL team). In addition, the Contractor shall notify the Contracting Officer when oceanic shipments have been initiated within 3 working days of shipment

RFP NO. N62742-25-R-1301

DOCUMENT 00 21 16

Amendment No. 0011

COMPLEMENTARY PRICING INFORMATION

DESCRIPTION PRICE

Command Center Subtotal of Base Price (CLIN 0001) is the price for the construction of the Command Center, complete to the 5-foot line outside of the building and in accordance with the drawings and specifications for WON 1812861 but not including work specified in any other items of the Complementary Pricing Information Sheet.

Power Generation Facility Subtotal of Base Price (CLIN 0001) is the price for the construction of the Power Generation Facility, complete to the 5-foot line outside of the building and in accordance with the drawings and specifications for WON 1812861 but not including work specified in any other items of the Complementary Pricing Information Sheet.

Switchgear Building Subtotal of Base Price (CLIN 0001) is the price for the construction of the Switchgear Building, complete to the 5-foot line outside of the building and in accordance with the drawings and specifications for WON 1812861 but not including work specified in any other items of the Complementary Pricing Information Sheet.

Fuel Storage Subtotal of Base Price (CLIN 0001) is the price for the Fuel Storage, complete to the 5-foot line outside of the building and in accordance with the drawings and specifications for WON 1812861 but not including work specified in any other items of the Complementary Pricing Information Sheet.

Entry Control Facility Subtotal of Base Price (CLIN 0001) is the price for the Entry Control Facility, complete to the 5-foot line outside of the building and in accordance with the drawings and specifications for WON 1812861 but not

Information Sheet.

Supporting Facilities Subtotal of Base Price (CLIN 0001) is the price for Supporting Facilities for the entire work for WON 1812861, complete to outside of the 5-foot line outside of the Command Center, Power Generator Facility, Switchgear Building, Fuel Storage, and Entry Control Facility, in accordance with the drawings and specifications, but not including work specified in any other item of the Complementary Pricing Information table.

Supporting Sitework Subtotal of Base Price (CLIN 0001) is the price for the supporting Sitework (work beyond the 5-foot line outside of the above facilities), complete in accordance with the drawings and specifications for WON 1812861 but not

Information Table.

TOTAL SHALL EQUAL ITEM CLIN 0001AA

of the PRICE PROPSAL SCHEDULE

NOTE: The Complementary Pricing Information is for Government information only.

FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER WON 1812861

DOCUMENT 00 21 16

Amendment No. 0011

DOCUMENT 00 21 16

INSTRUCTIONS TO PROPOSERS

1 2/25

1.1 NUMBER OF COPIES/TIME OF RECEIPT

a. PRICE PROPOSAL (PAPER): An original paper and one (1) paper copy of the price proposal shall be submitted on 13 February 2025, 2:00 p.m., H.S.T. in a sealed envelope and marked in the bottom right corner "PRICE PROPOSAL SUBMITTED UNDER RFP N62742-25-R-1301 - DO NOT OPEN IN MAILROOM." The PRICE PROPOSAL shall include the following:

(1) Pursuant to FAR 52.236-28(a) manually (wet signature) signed and completed SF 1442 (Solicitation, Offer and Award)(NOTE: SF1442 Block 14 shall include the offeror’s name and physical address exactly as shown in the System for Award Management registration. If mailing address is different from physical address, both addresses may be shown in Block 14, however both addresses shall be EXACTLY as shown in SAM)

(2) Signed and completed Bid Guarantee

(3) Representations and Certifications (See Document 00 45 00)(COMPLETE ALL PROVISIONS)

(4) Information required by paragraph 1.5, Pre-Award Survey/Responsibility Determination

(5) Information required by paragraph 1.6, Partnerships, Joint Ventures (JV), Limited Liability Companies

(LLC), Limited Partnerships (LP), Etc.

(6) Information required by paragraph 1.8, Complementary Pricing Information

b. TECHNICAL (FACTORS 1 THROUGH 5) (PAPER): An original paper and three (3) paper copies of the technical proposal for Factors 1, 3, 4, and through 5 shall be submitted on 13 February 2025, 2:00 p.m., H.S.T., and Factor 2 shall be submitted on 14 February 2025, 2:00 p.m., HST in a sealed envelope/package/box and marked in the bottom right corner "TECHNICAL PROPOSAL SUBMITTED UNDER RFP N62742-25-R-1301 - DO NOT OPEN IN MAILROOM." Identify the original proposal as "Original" on the cover of the proposal. The NON-PRICE PROPOSAL shall be submitted in a three-ring binder with table of contents and tabbed. The NON- PRICE PROPOSAL shall include the following:

(1) All information required by Factor 1, Experience

(2) All information required by Factor 2, Small Business Utilization and Participation

(3) All information required by Factor 3, Safety

(4) All information required by Factor 4, Management Plan

(5) All information required by Factor 5, Past Experience

c. SUBCONTRACTING PLAN (PAPER): An original paper and one (1) paper copy of the subcontracting plan shall be submitted by 14 February 2025, 2:00 p.m., H.S.T. in a sealed envelope/package/box and marked in the bottom right corner "SUBCONTRACTING PLAN SUBMITTED UNDER RFP N62742-25-R-1301 - DO NOT OPEN IN MAILROOM." Identify the original proposal as "Original" on the cover of the proposal.

(1) All information required by 1.7, Small Business Subcontracting Plan

FY25 MCON P-693 PDI: GUAM DEFENSE SYSTEM, COMMAND CENTER WON 1764210 1812861

DOCUMENT 00 45 00 TABLE OF CONTENTS

Amendment No. 0011

DOCUMENT 00 45 00

REPRESENTATIONS AND CERTIFICATIONS FOR CONTRACTING BY NEGOTIATION

5/24 2/25

1.1 SUMMARY

1.2 FAR 52.204-8, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024 JAN

2025)/DFARS 252.204-7007, ALTERNATE A (NOV OCT 2023)

1.3 FAR 52.204-22, ALTERNATIVE LINE ITEM PROPOSAL (JAN 2017)

1.4 FAR 52.204-24, REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO

SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021)

1.5 FAR 52.204-29, FEDERAL ACQUISITION SUPPLY CHAIN SECURITY ACT ORDERS—

REPRESENTATION AND DISCLOSURES (DEC 2023)

1.6 FAR 52.209-7, INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

1.7 FAR 52.209-13, VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS-CERTIFICATION

(NOV 2021)

1.8 FAR 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)

1.9 FAR 52.219-4, NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS

CONCERNS (OCT 2022)

1.10 DFARS 252.203-7005, REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD

OFFICIALS (SEP 2022)

1.11 DFARS 252.204-7008, COMPLIANCE WITH SAFEGUARDING COVERED DEFENSE INFORMATION

CONTROLS (OCT 2016)

1.12 DFARS 252.204-7016, COVERED DEFENSE TELECOMMUNICATIONS EQUIPMENT OR SERVICES

– REPRESENTATION (DEC 2019)

1.13 DFARS 252.204-7017, PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE

TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION (MAY 2021)

1.14 DFARS 252.204-7019, NOTICE OF NIST SP 800-171 DOD ASSESSMENT REQUIREMENTS (NOV

2023)

1.15 DFARS 252.219-7000, ADVANCING SMALL BUSINESS GROWTH (JUN 2023)

1.16 DFARS 252.223-7997, PROHIBITION ON PROCUREMENT OF CERTAIN ITEMS CONTAINING

PERFLUOROOCTANE SULFONATE OR PERFLUOROOCTANOIC ACID—REPRESENTATION—

REPRESENTATION (DEVIATION 2022-O0010) (SEP 2022)

1.17 DFARS 252.225-7018, PHOTOVOLTAIC DEVICES – CERTIFICATE (MAR 2024)

1.18 DFARS 252.225-7055, REPRESENTATION REGARDING BUSINESS OPERATIONS WITH THE

MADURO REGIME (MAY 2022)

1.19 DFARS 252.225-7057, PREAWARD DISCLOSURE OF EMPLOYMENT OF INDIVIDUALS WHO

WORK IN THE PEOPLE’S REPUBLIC OF CHINA (AUG 2022)

1.20 DFARS 252.225-7059, PROHIBITION ON CERTAIN PROCUREMENTS FROM THE XINJIANG

UYGHUR AUTONOMOUS REGION—CERTIFICATION (JUN 2023)

1.21 DFARS 252.225-7973, PROHIBITION ON THE PROCUREMENT OF FOREIGN-MADE UNMANNED

AIRCRAFT SYSTEMS—REPRESENTATION (AUG 2024) (DEVIATION 2024-O0014)

1.22 DFARS 252.225-7966, PROHIBITION REGARDING RUSSIAN FOSSIL FUEL BUSINESS

OPERATION-REPRESENTATION (DEVIATION 2024-O0006, REVISION 1) (MAR 2024)

1.23 DFARS 252.236-7010, OVERSEAS MILITARY CONSTRUCTION – PREFERENCE FOR UNITED

STATES FIRMS (JAN 1997)

1.24 DFARS 252.239-7098, PROHIBITION ON CONTRACTING TO MAINTAIN OR ESTABLISH A

COMPUTER NETWORK UNLESS SUCH NETWORK IS DESIGNED TO BLOCK ACCESS TO

CERTAIN WEBSITES—REPRESENTATION (DEVIATION 2021-O0003) (APR 2021)

1.25 DFARS 252.247-7022, REPRESENTATION OF EXTENT OF TRANSPORTATION BY SEA (JUN 2019)

-- End Document Table of Contents--

DOCUMENT 00 45 00

Amendment No. 0011

DOCUMENT 00 45 00

REPRESENTATIONS AND CERTIFICATIONS FOR CONTRACTING BY NEGOTIATION

5/24 2/25

Request for Proposal No.: RFP N62742-25-R-1301

Name and Address of Offeror:

Business Phone: ( ) Facsimile Phone: ( )

CEC/UEI Number: TIN NUMBER:

CAGE Number: Email Address:

1.1 SUMMARY

The following clauses are from the Federal Acquisition Regulations (FAR) and Department of Defense Federal

Acquisition Regulation Supplement (DFARS). Complete the paragraphs below, and return with the proposal.

1.2 FAR 52.204-8, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2024 JAN 2025) /

DFARS 252.204-7007, ALTERNATE A (NOV OCT 2023)

(a) (1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.

(2) The small business size standard is $45.0 million.

(3) The small business size standard for a concern that submits an offer, other than on a construction or service acquisition, but proposes to furnish an end item that it did not itself manufacture, process, or produce is 500 employees, or 150 employees for information technology value-added resellers under NAICS code 541519 if the acquisition—

(i) Is set aside for small business and has a value above the simplified acquisition threshold;

(ii) Uses the HUBZone price evaluation preference regardless of dollar value, unless the offeror waives the price evaluation preference; or

(iii) Is an 8(a), HUBZone, service-disabled veteran-owned, economically disadvantaged women-owned, or women-owned small business set-aside or sole-source award regardless of dollar value.

(b)(1) If the provision at FAR 52.204-7, System for Award Management, is included in this solicitation, paragraph (e) of this provision applies.

(2) If the provision at FAR 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

___ (i) Paragraph (d) applies.

Amendment No. 0011

___ (ii) Paragraph (d) does not apply and the Offeror has completed the individual representations and certifications in the solicitation.

(c)

(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:

(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless–

(A) The acquisition is to be made under the simplified acquisition procedures in part 13;

(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures;

or

(C) The solicitation is for utility services for which rates are set by law or regulation.

(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal

Transactions. This provision applies to solicitations expected to exceed $150,000.

(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality

Agreements or Statements-Representation. This provision applies to all solicitations.

(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.

(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that-

(A) Are not set aside for small business concerns;

(B) Exceed the simplified acquisition threshold; and

(C) Are for contracts that will be performed in the United States or its outlying areas.

(vi) 52.204-26, Covered Telecommunications Equipment or Services-Representation. This provision applies to all solicitations.

(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations-Representation.

(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.

(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a

Felony Conviction under any Federal Law. This provision applies to all solicitations.

(x) 52.214-14, Place of Performance-Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.

(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.

(xii) 52.219-1, Small Business Program Representations (Basic, Alternates I, and II). This provision applies to solicitations when the contract is for supplies to be delivered or services to be performed in the United

States or its outlying areas, or when the contracting officer has applied part 19 in accordance with 19.000(b)(1)(ii).

https://www.acquisition.gov/far/part-52#FAR_52_203_2 https://www.acquisition.gov/far/part-13#FAR_Part_13 https://www.acquisition.gov/far/part-52#FAR_52_203_11…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .