This is Notice No. 14, a pre-proposal questions and answers document dated February 6, 2025, for RFP N62742-25-R-1301 regarding the FY25 MCON P-693 Pacific Deterrence Initiative: Guam Defense System Command Center project at Joint Region Marianas, Guam.

The document addresses three contractor questions: 1) Two separate requests to extend the proposal due date due to Amendment 11's release containing 59 revised drawings and specification revisions, which the Government denied, stating that most content implements previously provided guidance; 2) A technical question regarding UL Assembly CAJ-1226 for conduit penetration firestop systems, to which the Government responded that contractors may submit alternative UL assemblies as a variance and confirmed that the current assembly reference is acceptable since the floor thickness exceeds the minimum 4-1/2 inch requirement. The document includes supporting diagrams showing penetration firestop system classifications and a typical conduit penetration detail.

View the file

Other files

File Type Posted
Am-0011 Attachments 25-44.pdf PDF
Am-0011 Attachment 1_Revised Drawings dtd 1-28-2025.pdf PDF
Am-0011.pdf PDF
Am-0011 Attachments 2-24.pdf PDF
25-1301 CmdCtrl Notice13.pdf PDF
25-1301 CmdCtrl Notice12.pdf PDF
25-1301 CmdCtrl Notice11.pdf PDF
Am-0010 Attachment 2_Revised Drawings_Signed.pdf PDF
Am-0010.pdf PDF
25-1301 CmdCtrl Notice10.pdf PDF
25-1301 CmdCtrl Notice9.pdf PDF
Attachment 1_Revised Drawings_dtd 13 and 20 Dec 2024.pdf PDF
Am-0009.pdf PDF
Am-0008.pdf PDF
25-1301 CmdCtrl Notice8.pdf PDF
P693_Sign-in Sheets_Redacted.pdf PDF
Am-0007.pdf PDF
Am-0007 Attachment 1_Revised Drawings dtd 13 Dec 2024.pdf PDF
Am-0006 Attachment 1_Revised Drawings dtd 6 Dec 2024.pdf PDF
Am-0006.pdf PDF
25-1301 CmdCtrl Notice7.pdf PDF
Am-0005 Attachment 1_Revised Drawings dtd 11-22-2024.pdf PDF
Am-0005.pdf PDF
25-1301 CmdCtrl Notice6.pdf PDF
25-1301 CmdCtrl Notice5.pdf PDF
R-P693_Drawings_Final_Vol14.6_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.5_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.8_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.2_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.1_20241007.pdf PDF
25-1301 CmdCtrl Notice4.pdf PDF
R-P693_Drawings_Final_Vol14.7_20241007.pdf PDF
R-P693_Drawings_Final_Vol14.4_20241007.pdf PDF
Am-0004 Attachment 1_Revised Drawings dtd 11-15-2024.pdf PDF
25-1301 CmdCtr Notice3.pdf PDF
Am-0004.pdf PDF
Am-0003.pdf PDF
Am-0003 Attachment 1_Revised Drawings dtd 11-8-2024.pdf PDF
25-1301 CmdCtrl Notice2.pdf PDF
Am-0002.pdf PDF
Am-0001.pdf PDF
25-1301 CmdCtrl Notice1.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.1_20241007-Part3.pdf PDF
P693_Drawings_Final_Vol14.2_20241007-Part2.pdf PDF
P693_Drawings_Final_Vol14.7_20241007.pdf PDF
P693_Drawings_Final_Vol14.3_20241007.pdf PDF
25-1301 P-693 RFP.pdf PDF
P693_Specs_Final_Vol02_20241007.pdf PDF
P693_Drawings_Final_Vol14.6_20241007.pdf PDF
Show 40 more

Latest 50 of 63 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE NAVY

NAVAL FACILITIES ENGINEERING SYSTEMS COMMAND PACIFIC

258 MAKALAPA DR STE 100

PEARL HARBOR HI 96860-3134

RFP N62742-25-R-1301

Notice No. 14

6 February 2025

PRE-PROPOSAL QUESTIONS & ANSWERS

RFP N62742-25-R-1301

FY25 MCON P-693 PACIFIC DETERRENCE INITIATIVE: GUAM DEFENSE SYSTEM

COMMAND CENTER,

JOINT REGION MARIANAS, GUAM

NOTE: The following questions and answers are provided for INFORMATION ONLY. The

RFP remains unchanged unless it is amended in writing on a Standard Form 30.

533. We've received Amendment 11, which includes several specification revisions and 59 revised drawings. To ensure we can thoroughly review these changes and allow our vendors sufficient time to update their quotes accordingly, we'd like to inquire about the possibility of extending the proposal bid due date.

Could you please let us know if this is something that could be considered.

ANSWER: The Government has considered your request, and we are unable to extend the proposal due date. We understand that Amendment 0011 contained a large amount of information; however, most of the content implements guidance previously provided via Notices.

534. Reference Drawing 14CC-S-561

Drawing 14CC-S-561 Detail A1 demonstrates conduit penetration using UL Assembly C-

AJ-1226. Based on Penetration Firestop Systems. Letter “C” indicates a walls or floors, letter “A” indicates a concrete floor of 5 inches thick or less and letter “J” indicates a concrete/masonry wall of 8 inches thick or less, but the drawings show differently. The

Penetration Firestop Systems do not seem to match the construction requirements. Please indicate whether we are allowed to change the UL Assembly or offer engineering judgment to align it with the penetration firestop systems.

RFP N62742-24-R-1327

ANSWER: Contractor may submit alternative UL assemblies as a variance. Note: UL Assembly

C-AJ-1226 is manufacturer specific and specifies a minimum floor or wall assembly of 4-1/2 in.

The floor thickness exceeds this minimum value, in which the provided UL assembly reference on Detail A1 would be acceptable.

535. The release of Amendment 11 +/- 5 working days prior to the bid submission date offers little-to-no realistic expectation that the information can be disseminated and incorporated into the price proposal. Please extend the bid date by no less than 2 weeks in order to process and incorporate the information in Amendment 11 into the price proposal.

ANSWER: See answer to question 533.