About this file

1604000 J

View the file

Other files

File Type Posted
N6247013R30090019.pdf PDF
N6247013R30090018.pdf PDF
J-1800000-02.1 Bahrain_Final_Governing_Standards_March_2012.pdf PDF
J-1502000-12 Gym Equipment Inventory.xls XLS spreadsheet
1502000 C Facility Investment.doc DOC document
J-1800000-02.2 ISA_Spill_Prevention_and_Response_Plan.pdf PDF
Contractor Visas.03012011.pdf PDF
1800000 C Environmental.doc DOC document
Attachment J-0200000-04 ELINS.xlsx XLSX spreadsheet
0200000 J Management and Administration.doc DOC document
1604000 J Wastewater.doc DOC document
N6247013R30090017.pdf PDF
1800000 J Environmental.doc DOC document
1800000 C Environmental.doc DOC document
J-1700000-09 Fuel Farm Equipment Inventory.xls XLS spreadsheet
1300000 C Galley Isa.doc DOC document
1502000 C Facility Investment.doc DOC document
N6247013R30090016.pdf PDF
1502000 J Facility Investment.doc DOC document
J-1502000-03 Facilities Property Inventory.xlsx XLSX spreadsheet
1700000 C BSVE.doc DOC document
J-1503010-05 Custodial Frequencies.xlsx XLSX spreadsheet
1602000_C_Electrical.doc DOC document
N6247013R30090015.pdf PDF
N6247013R30090014.pdf PDF
J-0200000-04 FP IDIQ ELINS.xlsx XLSX spreadsheet
0200000 C Management and Administration.doc DOC document
J-1700000-05.1 POLICY AND GUIDELINES FOR WASH RACK.doc DOC document
J-1502000-08 Emergency Generator Inventory.xls XLS spreadsheet
1402000 C Bachelor Quarters and Laundry Services.doc DOC document
1700000 J BSVE.doc DOC document
Attachment J-0200000-04 ELINS.xlsx XLSX spreadsheet
1300000 J Galley.doc DOC document
0200000 J Management and Administration.doc DOC document
1300000 C Galley.doc DOC document
N6247013R30090013.pdf PDF
1606000 C Water.doc DOC document
1800000 C Environmental.doc DOC document
1503010 C Custodial.doc DOC document
J-1300000-06 Equipment List.xlsx XLSX spreadsheet
0200000 C Management and Administration.doc DOC document
Attachment J-1402000-02 Washers and Dryers.xlsx XLSX spreadsheet
1502000 C Facility Investment.doc DOC document
1800000 J Environmental.doc DOC document
N6247013R30090012.pdf PDF
RFP Attachment J.C-1 1300000 C Galley.doc DOC document
0200000_J_Management_and_Administration_Isa__23_May_2013.pdf PDF
RFP Attachment J.C-1 1503050 C Grounds Maint and Landscaping.doc DOC document
RFP Attachment J.C-1 1501000 J Facility Management.doc DOC document
RFP Attachment J.C-1 1700000 C BSVE.doc DOC document
Show 40 more

Latest 50 of 156 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION J

DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

TABLE OF CONTENTS

ATTACHMENT NUMBER
ATTACHMENT TITLE
J-1604000-01
Definitions and Acronyms
J-1604000-02
References and Technical Documents
J-1604000-03
Wastewater Treatment Plant and Collection System Description and Inventory
J-1604000-04
Wastewater Removal

ATTACHMENT J-1604000-01

DEFINITIONS AND ACRONYMS

Definitions

Equipment, Collateral
Encompasses built-in and large substantially affixed equipment/property that is normally acquired and installed as part of a facility project.
Equipment, Installed
Encompasses building-type equipment, built-in equipment, and large, substantially affixed equipment/property, and is normally acquired and installed as part of a facility project. Installed equipment is normally required to make a facility useful and operable. Removing such equipment would impair the usefulness, safety, or environment of the facility or the facility restoration work required after its removal, is substantial.
Equipment, Personal Property
Personal property equipment includes all equipment other than collateral equipment. Such equipment, when acquired and used in a facility or a test apparatus, can be severed and removed aster erection or installation without substantial loss of value or damage thereto or to the premises where installed.
Facilities Life Cycle
A facilities life cycle is divided into four stages, requirements (planning and design), acquisition (construction and acceptance), stewardship (operations, maintenance and repair), and disposal.
Facilities Maintenance Management
The planning, prioritizing, organizing, controlling, reporting, evaluating, and adjusting of facilities maintenance operations to support the CNO/NAVFAC facilities policy and objectives and satisfy customers’ facility needs. Defined by the International Facility Management Association as “the practice of coordinating the physical workplace with the people and work of the organization.”
Integrated Maintenance Plan
IMP is a recurring state-of-the-art, reliability-centered inspection, testing, maintenance and repair program that determines best practices for managing the functions and consequences of failures of facilities equipment and system components. IMP encompasses accepted commercial practices, including reactive, preventive, predictive and proactive maintenance, into one optimal program. The IMP approach gives the Contractor full responsibility to maintain systems and equipment and perform repairs whenever necessary to ensure equipment and systems are operational and remain in a constant state of readiness.
Life-Cycle Costs
A form of economic analysis that considers the total cost of owning, operating, and maintaining a building or system over its useful life.
Repair
Repair is the restoration of facilities or equipment to such a condition that it may be effectively utilized for its designated purposes by overhaul, reconstruction, or replacement of constituent parts or materials which have deteriorated by action of the elements or usage, and which have not been corrected through maintenance. This term also applies to replacement of the entire unit or system if beyond economical repair. The intent of repair is to have the equipment at normal working condition.
Replacement
Replacement, as a distinct work element, is confined to a program of planned replacement of a facility or its components. It may be further limited to major components such as air conditioning compressors, furnaces or hot water heaters. Replacement is performed when the equipment has reached the end of its useful life; when it no longer can perform due to degradation of its internal components and repair is no longer cost effective. Included under the replacement would be the major rebuilding of any component, since rebuilding also restores performance.
Restoration
Restoration of real property to such a condition that it can be used for its intended purpose. Includes repair or replacement work to restore facilities damaged by inadequate sustainment, excessive age, natural disaster, fire, accident or other causes.
Sustainment
Maintenance and repair activities necessary to keep a typical inventory of facilities in “normal working condition”. Sustainment includes regularly scheduled maintenance as well as cyclical major repairs or replacement of components that occur periodically over the expected service life of the facilities.
SCADA
A version of telemetry commonly used in wide-area industrial applications, such as electrical power generation and distribution and water distribution, which includes supervisory control of remote stations as well as data acquisition from those stations over a bidirectional communications link.
Acronym
Title
ANSI
American National Standards Institute
ASHRAE
American Society of Heating, Refrigerating and Air-Conditioning Engineers
ASME
American Society of Mechanical Engineers
BOD
Biochemical Oxygen Demand
COD
Chemical Oxygen Demand
DoD FGS
Department of Defense Environmental Final Governing Standards
MACP
Manhole Assessment and Certification Program
NASSCO
National Association of Sewer Service Companies
NPDES
National Pollutant Discharge Elimination System
OEBGD
Overseas Environmental Guidance Document
PACP
Pipeline Assessment and Certification Program
SCADA
Supervisory Control and Data Acquisition
SRM
Sustainment, Restoration and Modernization
TSS
Total Suspended Solids
UFC
Unified Facilities Criteria
WEF
Water Environmental Federation
WWTP
Wastewater Treatment Plant

ATTACHMENT 1604000-02

REFERENCES AND TECHNICAL DOCUMENTS

Reference
Title
DoD 4715.05-G
Overseas Environmental Guidance Document
EI 11C201
Wastewater Collection and Pumping
MO-209
Engineering Criteria
MIL-HDBK-1005/9
Industrial and Oily Wastewater Control
UFC 3-240-02N
Wastewater Treatment Systems
UFC 3-240-04A
Wastewater Collection
UFC 3-240-07FA
Sanitary and Industrial Wastewater Collection: Gravity Sewers and Appurtenances
UFC 3-240-09FA
Domestic Wastewater Treatment
UFC 4-832-01N
Design: Industrial and Oily Wastewater Control

Non-Government Publications.

National Association of Sewer Service Companies, (NASSCO)

11521 Cronridge Drive, Suite J, Ownings, MD 21117

American National Standards Institute, Inc. (ANSI)

11 West 42nd Street, New York, NY 10036

ATTACHMENT J-1604000-03

WASTEWATER TREATMENT PLANT AND COLLECTION SYSTEM DESCRIPTION AND INVENTORY

The wastewater collection system on the LSA consists of gravity and force mains that direct the flow to a series of holding tanks located within and outside of the U.S. compound. These tanks are pumped out by contracted vendors, and the wastewater is trucked off site for treatment and disposal. There is no existing integrated wastewater collection system in the Flightline area. The existing ablution units in the Flightline are serviced by stand alone wastewater holding tanks serviced by commercial vendors.

In the former WRM area north of Broadway Road (the Main Access Road), approximately 979 meters of 4 inch gravity sewer were installed in 2003 that direct the wastewater to a lift station in the southeastern corner of the former WRM area. The pumps and force main from this lift station have not been installed.

The area south of Broadway Road known as the Exercise Area, there are two lift stations with force mains that manifold together into a single main that discharges into the aforementioned holding tanks outside of the U.S. compound. The easternmost lift station is now abandoned but formerly collected wastewater from a group of nearby ablution units. It was noted that the gravity lines from the latrine RLBs to the lift station have a very shallow grade that has a history of clogging. The larger lift station has a storage capacity of 50,000 gallons. It receives wastewater flow via a 4 inch gravity line that services a row of 8 ablution units, the medical clinic and the office building 6000.

There is no on-site wastewater treatment available. The existing holding tanks must be pumped daily, and there is evidence that the tanks have overflowed. Public Works personnel have reported that they are averaging about 1 million gallons per month of wastewater removal.

ATTACHMENT J-1604000-04

WASTEWATE REMOVAL

Site
Facility Number
Description and Location
Number of Porta Potties
Porta Potties Serviced
Total Gallons Removed from Wastewater Receiving Site Per Month
Isa LSA
2248
Ablution/latrine - Bottom of LSA

Approximately 77,500 Gallons

Isa LSA
2448
Ablution/latrine - Bottom of LSA

Approximately 77,500 Gallons

Isa LSA
2648
Ablution/latrine - Bottom of LSA

Approximately 77,500 Gallons

Isa LSA
2748
Ablution/latrine - Bottom of LSA

Approximately 77,500 Gallons

Isa LSA
N/A
Porta Potties
23 on site
1 X Daily
Approximately 34,500 Gallons
Isa PAT Site
2004
Ablution Unit - Female - Main Compound Area
3 at ECP
1 X Every Three Days
Approximately 20,000 Gallons
Riffa PAT Site
3004
Ablution Unit - Female - Main Compound Area
3 at ECP
1 X Every Three Days
Approximately 20,000 Gallons
Riffa PAT Site
3005
Ablution Unit - Male - Main Compound Area
6 at Ablution Units
1 X Every Three Days
Approximately 20,000 Gallons
Riffa PAT Site
N/A
Porta Potties
9 on site
1 X Daily
Approximately 14,000 Gallons
RAYDOME
8001
Ablution/latrine RAYDOME
1 at Ablution Unit
USMC LSA
9801
Marine Site Porta Potties
3 By Offices
1 X Daily
Approximately 750,000 Gallons
USMC Flight Line
N/A
Porta Potties
7 on site
1 X Daily
Approximately 10,500 Gallons
Isa Fuel Farm
4452
Ablution/latrine Fuel Farm-

Approximately 77,500 Gallons

Isa Flight Line
5029
Male Ablution/latrine Flight Line

Approximately 77,500 Gallons

Isa Flight Line
5030
Female Ablution/latrine Flight Line

Approximately 77,500 Gallons

Isa Flight Line & Fuel Farm
N/A
Latrines
13 on site
1 X Daily
Approximately 20,000 Gallons
Isa Flight Line
N/A
Fire Station #2 Flight Line
1 X Every Three days
Approximately 20,000 Gallons
USMC Flight Line (Isa)
5201
Male Ablution/latrine

Approximately 77,500 Gallons

USMC Flight Line (Isa)
5202
Male Ablution/latrine

Approximately 77,500 Gallons

USMC Flight Line (Isa)
5203
Male Ablution/shower

Approximately 77,500 Gallons

USMC Flight Line (Isa)
5204
Male Ablution/shower

Approximately 77,500 Gallons

USMC Flight Line (Isa)
5205
Female Ablution/latrine

Approximately 77,500 Gallons

USMC Flight Line (Isa)
5206
Female Ablution/Shower

Approximately 77,500 Gallons

USMC Flight Line (Isa)
N/A
Porta Potties
7 on site
1 X Daily
Approximately 10,000 Gallons

N62470-13-R-3009

File details come from the government source that posted it. Updated .