About this file

1602000 C

View the file

Other files

File Type Posted
N6247013R30090019.pdf PDF
N6247013R30090018.pdf PDF
J-1800000-02.1 Bahrain_Final_Governing_Standards_March_2012.pdf PDF
J-1502000-12 Gym Equipment Inventory.xls XLS spreadsheet
1502000 C Facility Investment.doc DOC document
J-1800000-02.2 ISA_Spill_Prevention_and_Response_Plan.pdf PDF
Contractor Visas.03012011.pdf PDF
1800000 C Environmental.doc DOC document
Attachment J-0200000-04 ELINS.xlsx XLSX spreadsheet
0200000 J Management and Administration.doc DOC document
1604000 J Wastewater.doc DOC document
N6247013R30090017.pdf PDF
1800000 J Environmental.doc DOC document
1800000 C Environmental.doc DOC document
J-1700000-09 Fuel Farm Equipment Inventory.xls XLS spreadsheet
1300000 C Galley Isa.doc DOC document
1502000 C Facility Investment.doc DOC document
N6247013R30090016.pdf PDF
1502000 J Facility Investment.doc DOC document
J-1502000-03 Facilities Property Inventory.xlsx XLSX spreadsheet
1700000 C BSVE.doc DOC document
J-1503010-05 Custodial Frequencies.xlsx XLSX spreadsheet
N6247013R30090015.pdf PDF
N6247013R30090014.pdf PDF
J-0200000-04 FP IDIQ ELINS.xlsx XLSX spreadsheet
0200000 C Management and Administration.doc DOC document
J-1700000-05.1 POLICY AND GUIDELINES FOR WASH RACK.doc DOC document
J-1502000-08 Emergency Generator Inventory.xls XLS spreadsheet
1402000 C Bachelor Quarters and Laundry Services.doc DOC document
1700000 J BSVE.doc DOC document
Attachment J-0200000-04 ELINS.xlsx XLSX spreadsheet
1300000 J Galley.doc DOC document
0200000 J Management and Administration.doc DOC document
1300000 C Galley.doc DOC document
N6247013R30090013.pdf PDF
1606000 C Water.doc DOC document
1800000 C Environmental.doc DOC document
1503010 C Custodial.doc DOC document
J-1300000-06 Equipment List.xlsx XLSX spreadsheet
0200000 C Management and Administration.doc DOC document
Attachment J-1402000-02 Washers and Dryers.xlsx XLSX spreadsheet
1502000 C Facility Investment.doc DOC document
1800000 J Environmental.doc DOC document
N6247013R30090012.pdf PDF
RFP Attachment J.C-1 1300000 C Galley.doc DOC document
0200000_J_Management_and_Administration_Isa__23_May_2013.pdf PDF
RFP Attachment J.C-1 1503050 C Grounds Maint and Landscaping.doc DOC document
RFP Attachment J.C-1 1501000 J Facility Management.doc DOC document
RFP Attachment J.C-1 1700000 C BSVE.doc DOC document
N6247013R3009.pdf PDF
Show 40 more

Latest 50 of 156 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1602000 – Electrical

Table of Contents

Spec Item
Title
1
General Information
2
Management and Administration
1.1
Definitions and Acronyms
1.2
Personnel
1.2.1
Certification and Training
1.3
Special Requirements
1.3.1
Safety
1.4
References and Technical Documents
3
FFP Work
1.1
Operate Electrical Power Distribution Systems
1.2
Operation—Diesel/Gas
1.3
Preventive Maintenance
1.3.1
Electrical Power Distribution System
4
IDIQ Work

1602000 - Electrical

Spec Item
Title
Description
1
General Information
The Contractor shall provide all labor, management, supervision, tools, material, and equipment to continuously operate, maintain, and repair the electrical power generation plant and distribution systems located at Isa Air Base, Al Riffa Army Base and other locations within the Kingdom of Bahrain.

1602000 – Electrical

Spec Item
Title
Description
2
Management and Administration
1.1
Definitions and Acronyms
Definitions and Acronyms are listed in J-1602000-01.
1.2
Personnel
The Contractor shall provide personnel with the qualifications, technical knowledge, experience and skills required to efficiently operate, maintain and repair the electrical power generation plant and transmission and distribution systems.
1.2.1
Certification and Training
Electrical power generation plant operators shall comply with ASME and EPA certification guidance exhibiting knowledge and skills of, diesel driven electrical generation equipment and principles of electrical production.

High Voltage Certification and Training. All personnel that maintain and repair high voltage equipment and system (11 kV and above) shall be certified by the Government of BAHRAIN Ministry of Electricity and Water, Electricity Distribution Directorate (EDD).

1.3
Special Requirements
1.3.1
Safety
All the safety requirements of UFC 3-560-01 are applicable to this specification in addition to the safety standards of 0200000 Management and Administration.
1.4
References and Technical Documents
References and Technical Documents are listed in J-1602000-02.

1602000 – Electrical

Spec Item
Title
Performance Objective
Related Information
Performance Standard
3
FFP Work
The Contractor shall efficiently operate and maintain the electrical power generation plant and distribution systems to safely produce, transmit and distribute reliable electrical power to ensure all electrical requirements are continually met
The Contractor shall shut-down, restart, and perform operational checks on all equipment affected by both scheduled and unscheduled utility outages at no additional cost to the Government.

As described below, the Contractor shall develop, and submit to the KO for approval, SOPs identifying operator and technician responsibilities within 30 calendar days of contract start. And within five working days after making changes to any operating procedure, equipment, and components, the Contractor shall submit updated SOP(s) to the KO.

Contractor personnel operating and maintaining equipment shall understand and be knowledgeable of the SOPs that pertain to their area of assigned responsibility. Personnel under instruction operating equipment shall perform duties under the supervision of a qualified, knowledgeable individual.

The current electrical power generation and distribution systems description and inventory are provided in J-1602000-03.

The Contractor shall develop, and submit a list of critical spare parts, per Section F. The Contractor shall maintain such an inventory of critical spare parts required to keep the entire system in continuous service to meet electrical power demand requirements.

Electrical power is continuously and safely produced, transmitted and distributed and meets demand requirements.

1.1
Operate Electrical Power Distribution Systems
The Contractor shall efficiently and safely operate the electrical power distribution systems to ensure electrical power is provided to meet all demand requirements, 24 hours per day, seven days per week, throughout the contract period.
Systems equipment and components shall be efficiently and safely operated per ANSI, ASHRAE, IEEE, NEC, NESC, NFPA Standards, OMSI and other specific operating manuals, procedures, and instructions.

Operation of the electrical power distribution systems includes equipment and systems components, such as, generators, transformers, switchgear, medium and low voltage distribution lines, and includes tasks, such as, monitoring and regulation of equipment controls, maintaining operating records, logs, and reports, and examination, lubrication and minor adjustment of equipment and system components.

Systems equipment and components are efficiently, safely and continuously operated per operating criteria to produce electrical power to meet demand.

All required operating records, logs, reports, and procedures are current, detailed, and complete.

Unscheduled interruptions are minimized such that electrical power demand is met 99.9 percent of the time annually.

1.2
Operation—Diesel/Gas
The Contractor shall operate the diesel/gas generators to efficiently and safely produce electrical power to ensure demand requirements are met, 24 hours per day, seven days per week, throughout the contract period.

Operation consists of ensuring safe, reliable, efficient generation of electricity.

Operation of the diesel/gas generators includes equipment and system components, such as, engines, generators, energy monitoring and control systems, and includes tasks, such as, monitoring and regulation of equipment controls, refueling, maintaining operating records, logs (fuel consumption), and reports, and examination, lubrication and minor adjustment of equipment and system components.

Equipment and components shall be efficiently and safely operated per ANSI, ASHRAE, NEC, and NFPA Standards, OEM and other specific operating manuals, procedures, and instructions.

The Contractor shall ensure configuration drawings or diagrams are created and kept current.

All equipment and components are efficiently, safely and continuously operated per operating criteria to produce electrical power to meet demand.

Unscheduled interruptions are minimized such that electrical power demand is met 99.9 percent of the time annually.

1.3
Preventive Maintenance (PM) Program
The Contractor shall develop and implement a PM program for the distribution systems to ensure proper operation, to minimize breakdowns, and to maximize useful life.
The Contractor shall develop and submit a PM program, per Section F.

The Contractor is fully responsible for and shall perform any repairs, including replacement, discovered during scheduled maintenance work up to a total of $1,500 per occurrence in direct material and labor cost under FFP portion of the contract. Incidental repairs work performed under maintenance are not considered a trouble call.

Notification of repair work exceeding the incidental repairs limit shall be submitted to the KO within two hours of identification. Trouble calls or IDIQ work may be issued for repairs exceeding the incidental repairs limit.

The PM program shall provide an economical approach to manufacturers’ recommended procedures, OEM standards, and maintenance required to satisfy equipment warranties and keep facilities, ground structures, personal property equipment, and installed equipment and systems in normal working condition.

Excessive or repeated system or equipment breakdowns or deficiencies may indicate the need to adjust or modify the Contractor’s PM program. These changes will be made at no additional cost to the Government.

The Contractor shall submit a monthly preventive maintenance schedule, unaccomplished maintenance report, repair status report, and summary of maintenance and repair accomplished under the various maintenance programs report, per Section F.

Maintenance is accomplished in accordance with the Contractor’s PM program and work schedule.

PM is performed in accordance with manufacturers’ recommended procedures and OEM standards.

1.3.1
Electrical Power Distribution System
The Contractor shall maintain the electrical power distribution system to ensure continuous service, 24 hours a day, seven days a week.
The electrical distribution system description and inventory is provided in J-1602000-03.

The electrical power distribution system includes all equipment and system components, such as, transformers, switchgear, high voltage transmission lines, medium and low voltage distribution lines.

The Contractor shall perform all maintenance and repair work per applicable industry standards. At the minimum the standards shall include but not limited to all standards, requirements, and specifications; NETA MTS – 1997 “Maintenance Testing Specifications for Electrical Power Distribution Equipment and systems”; and NETA ATS – 1999 “Maintenance testing Specifications for Electrical Power Distribution Equipment and Systems”.

High voltage switching shall be the Contractor’s responsibility. The person performing the switching operation shall be certified by EDD (Electrical Distribution Directorate Bahrain).

The Contractor shall understand be knowledgeable of the PWBL SOP 001, Control of Hazardous Electrical Energy Lock Out/Tag Out (LOTO) system.

The Contractor shall provide all PPE where applicable.

The Contractor shall maintain these systems to provide continuous service, 24 hours a day, seven days a week.

Unscheduled interruptions are minimized such that electrical power demand is met 99.5 percent of the time annually.

PM is accomplished per the Contractor's program and work schedule.

1602000 – Electrical

Spec Item

Title
Performance Objective
Related Information
Performance Standard
4
IDIQ Work
IDIQ work may be ordered utilizing DoD EMALL in accordance with Section H or on a task order in accordance with the PROCEDURES FOR ISSUING ORDERS clause in Section G. The order will specify the exact locations and types of work to be accomplished. The period of performance will be specified in each order.
Refer to IDIQ ELINs for task listings, descriptions and related requirements. All periods of performance are measured from issue date of order to acceptance of the work. Performance Standards for IDIQ work will be the same as those in Spec Item 3 where applicable.

N62470-13-R-3009