This is a Construction Phasing Plan drawing for a Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base New London in Groton, Connecticut. The project, designated P-1102, is being executed by NAVFAC Mid-Atlantic and is managed by contractor Jacobs Engineering.

Phase 1 construction is divided into three subphases (1A, 1B, and 1C) and includes multiple critical activities: Phase 1A involves constructing north and south wetland mitigation areas, establishing temporary security fencing around existing magazines (A94-A97, A100-A109, A113, A114) to remain operational, demolishing four existing magazines (A98, A99, A110, A111) with associated utilities and pavements, performing rock blasting and excavation for the operations building, constructing a permanent stormwater facility east of existing structure A114, and completing the operations building with site preparation, drainage infrastructure, utility installation, access roads, and parking. Phase 1B includes installing temporary sediment traps, rerouting and demolishing existing utilities, and constructing a Type H magazine structure. Phase 1C involves demolition of existing Building 524 and associated utilities and pavements. Critical restrictions include that contractor employees must complete explosive safety training prior to site access, equipment fueling is prohibited within the munitions compound, contractors must submit spark-producing equipment for approval, all construction activities must cease immediately upon request by security forces or the contracting officer, active magazine access remains under government control, and temporary security fencing must be installed and fully grounded before existing perimeter fence demolition. The drawing was approved on May 27, 2025, with revisions noted for Amendments 1 and 2 dated May 19, 2026, and June 26, 2026, respectively.

View the file

Other files

File Type Posted
N4008526R00040014 SF 30.pdf PDF
Amend 0014 Spec 1667770.pdf PDF
N4008526R00040013 SF 30.pdf PDF
N4008526R00040011 SF 30.pdf PDF
N4008526R00040012 SF 30.pdf PDF
APPENDIX_D_Air Leakage Rate by Fan Pressurization.xlsx XLSX spreadsheet
ATTACHMENT H - Price Proposal Form REV4.docx DOCX document
N4008526R00040010 SF 30.pdf PDF
1667770spc07.28.26_rev.pdf PDF
ATTACHMENT T - P1102_PROD.xlsx XLSX spreadsheet
P1102_Amend 0007_Drawings3of3.pdf PDF
P-1102_Amend 0007_Drawings2of3.pdf PDF
ATTACHMENT R - Geo Inv Analytical Rep.pdf PDF
ATTACHMENT Q - NRZ_Checklist-POAM_Items.pdf PDF
Revised Attachment H Price Proposal Form REV2.docx DOCX document
JA ML-26-16 P1102 Interior Finishes_Redacted.pdf PDF
JA ML-26-15 P1102 Stormwater_Redacted.pdf PDF
JA ML-26-13 P1102 Fire Alarm_Redacted.pdf PDF
JA ML-26-12 P1102 ESS_Redacted.pdf PDF
ATTACHMENT N - NDDB Determination Renewal 16JAN2026.pdf PDF
ATTACHMENT L - Explosive Safety-HERO training.pptx PPTX presentation
P-1102_Amend 0006_Drawings_rev.pdf PDF
ATTACHMENT O - MK48 STORAGE FACILITY.pdf PDF
N4008526R00040005 SF 30.pdf PDF
Amendment 0004 PPIs.pdf PDF
Attachment G- Small Business Subcontracting Plan (SBSP) Rev.pdf PDF
Attachment K - P1102 Site Visit Log.pdf PDF
Amendment 0002 PPIs.pdf PDF
N4008526R00040002 SF 30.pdf PDF
Attachment I - Site Visit Map.pdf PDF
N4008526R00040001 SF 30.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
FINAL DESIGN_1667770dwg2of3Operations.pdf PDF
FINAL DESIGN_1667770dwg2of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg2of4Site.pdf PDF
FINAL DESIGN_1667770dwg3of4Site.pdf PDF
P-1102_1667770spc1of3.pdf.pdf PDF
P-1102_1667770spc3of3.pdf.pdf PDF
Solicitation - N4008526R0004.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Attachment F - Small Business Participation Commitment.pdf PDF
FINAL DESIGN_1667770dwg1of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeG.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeH.pdf PDF
Attachment C - Construction Experience Project Data.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.pdf PDF
FINAL DESIGN_1667770dwg1of3Operations.pdf PDF
FINAL DESIGN_1667770dwg1of4Site.pdf PDF
FINAL DESIGN_1667770dwg4of4Site.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5 110

SAN

SAN

SAN

W

W

W

W

SD

SD

SD

X

X X X

X X

X X X

X X

X

GENERAL SHEET NOTES

GRAPHIC SCALE

PHASING NOTES

6/

/2

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

5/

/2

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

PH

AS

E

CO

NS

TR

UC

TI

O

N

PH

AS

IN

G P

LA

N

GC101

OPERATIONS

BUILDING

EXST-001

(A114)TYPE H-001

PHASE 1A

1. CONSTRUCT NORTH AND SOUTH WETLAND MITIGATION AREAS.

2. PROVIDE TEMPORARY CONSTRUCTION ACCESS AND SECURITY FENCING

TO ENSURE A SECURE PERIMETER AROUND EXISTING MAGAZINES TO

REMAIN IN PLACE DURING PHASE 1 OPERATIONS (MAGAZINES A94-A97,

A-100-A104, A105-A109, A113, AND A114). REFER TO CIVIL DETAIL A1/CS504

FOR SECURITY FENCING INFORMATION.

3. DEMOLISH EXISTING MAGAZINES A98, A99, A110, AND A111 INCLUDING

ASSOCIATED PAVEMENTS AND UTILITIES. INSTALL TEMPORARY

SEDIMENT TRAPS 1 AND 3

4. ROCK BLASTING AND EXCAVATION FOR OPERATIONS BUILDING AND

NEAR MAGAZINES A98, A99, A110, AND A111.

5. CONSTRUCT PERMANENT STORM WATER FACILITY A EAST OF EXST-001

(A114). MAINTAIN TREATMENT CHAMBERS OFFLINE UNTIL FINAL SITE

STABILIZATION.

6. OPERATIONS BUILDING CONSTRUCTION INCLUDING SITE PREPARATION,

DRAINAGE INFRASTRUCTURE, UTILITY INSTALLATION, ACCESS ROAD, AND

PARKING LOT. CONVERT TEMPORARY SEDIMENT TRAP 1 TO PERMANENT

STORM WATER FACILITY. MAINTAIN TREATMENT CHAMBERS OFFLINE

UNTIL FINAL SITE STABILIZATION.

7. TRANSFER OF PERSONNEL TO OPERATIONS BUILDING.

PHASE 1B

1. INSTALL TEMPORARY SEDIMENT TRAP 2. REROUTE AND DEMOLISH

EXISTING UTILITIES NECESSARY TO CONSTRUCT TYPE H MAGAZINE.

2. SITE PREPARATION, UTILITY INSTALLATION, AND CONSTRUCTION OF

TYPE H MAGAZINE. CONVERT TEMPORARY SEDIMENT TRAP 2 TO

PERMANENT STORM WATER FACILITY. MAINTAIN TREATMENT

CHAMBERS OFFLINE UNTIL FINAL SITE STABILIZATION.

PHASE 1C

1. DEMOLITION OF EXISTING BUILDING 524, UTILITIES, AND PAVEMENTS.

A1 CONSTRUCTION PHASING PLAN - PHASE 1

1" = 100'

ROCK BLASTING AND

EXCAVATION AREA (PHASE 1A)

A99 A110

A111A98

STORM WATER

FACILITY A

ROCK BLASTING AND

EXCAVATION

EXISTING

BUILDING 524

1. REFER TO SHEETS C-001 TO C-004 FOR ADDITIONAL NOTES, EROSION

CONTROL SEQUENCING, CONTRACTOR LAY DOWN AREA, AND SITE

ACCESS.

2. REFER TO SHEETS CD100 TO CD103 FOR SITE DEMOLITION

INFORMATION.

3. REFER TO SHEETS CS100 TO CS103 FOR SITE LAYOUT INFORMATION.

4. REFER TO SHEETS CG100 TO CG103 FOR SITE GRADING AND

DRAINAGE INFORMATION.

5. REFER TO SHEETS CU100 TO CU103 FOR SITE UTILITY INFORMATION.

6. REFER TO SHEET CE001 TO CE502 FOR WETLAND MITIGATION

INFORMATION.

7. MAINTAIN ACCESS AND FUNCTIONALITY OF MAGAZINES TO REMAIN

DURING PHASE 1 OPERATIONS INCLUDING POWER, SECURITY

FEATURES, GROUNDING GRID, AND INTRUSION DETECTION SYSTEM.

8. TEMPORARY SECURITY FENCE MUST BE INSTALLED PRIOR TO

DEMOLITION OF EXISTING PERIMETER FENCE AND BE FULLY

GROUNDED AND BONDED.

9. CONTRACTOR MUST IMMEDIATELY CEASE BLASTING, EXCAVATION,

DEMOLITION, CONSTRUCTION ACTIVITIES, AND VACATE THE SITE AT

THE REQUEST OF SECURITY FORCES, MUNITIONS STAFF, OR

CONTRACTING OFFICER TO FACILITATE NORMAL OPERATIONS AND

SECURITY DRILLS ON SITE. CONSTRUCTION AND DEMOLITION

ACTIVITIES, INCLUDING SITE ACCESS, WILL ONLY BE ALLOWED TO

RESUME UPON VERBAL APPROVAL OF SECURITY FORCES, MUNITIONS

STAFF, OR THE CONTRACTING OFFICER.

10. THE GOVERNMENT WILL MAINTAIN ACCESS CONTROL TO ACTIVE

MAGAZINES (MAGAZINES NOT SCHEDULED FOR DEMOLITION DURING

PHASE 1). DO NOT BLOCK THE ENTRANCE TO OR OTHERWISE IMPEDE

GOVERNMENT ACCESS TO ACTIVE MAGAZINES. THE CONTRACTOR

WILL NOT HAVE FREE ACCESS TO ACTIVE MAGAZINES FOR THE

DURATION OF CONSTRUCTION.

11. CONTRACTOR EMPLOYEES, INCLUDING SUBCONTRACTORS, MUST

COMPLETE EXPLOSIVE SAFETY TRAINING PRIOR TO SITE ACCESS.

12. EQUIPMENT FUELING WITHIN THE MUNITIONS COMPOUND IS STRICTLY

PROHIBITED, FUELING MUST ONLY OCCUR WITHIN THE CONTRACTOR

LAY DOWN AND STAGING AREA.

13. SUBMIT LIST OF SPARK PRODUCING EQUIPMENT, OR EQUIPMENT

UTILIZING PROPANE GAS, TO THE CONTRACTING OFFICER FOR

APPROVAL PRIOR TO USE ON SITE.

TEMPORARY SEDIMENT TRAP 1

(PHASE 1A) & PERMANENT STORM

WATER FACILITY C (PHASE 1A)

ROCK BLASTING AND

EXCAVATION AREA (PHASE 1A)

EXST-002

(A113)

TEMPORARY SEDIMENT TRAP 2 (PHASE 1B)

& PERMANENT STORM WATER

MANAGEMENT FACILITY B (PHASE 1B)

PHASE 1A

PHASE 1B

DEMOLITION OF

BUILDING 524 (PHASE 1C)

CONTRACTOR

TRAILER LOCATION

EXISTING MAGAZINE

COMPOUND ENTRY GATE

EXISTING

BLDG 393

TEMPORARY SECURITY FENCE

SECURITY FENCE

EXISTING MUNITIONS

COMPOUND ENTRY GATE,

CONTRACTOR ACCESS POINT

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

MI

D-

AT

LA

NT

IC

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N G

RO

TO

N, C

O

NN

EC

TI

CU

T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

SI

TE

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

TEMPORARY SEDIMENT

TRAP 3 (PHASE 1A)

A94

A95

A96

A97

A100 A109

A101 A108

A102 A107

A103 A106

A104 A105

CONSTRUCTION OF

OPERATIONS BUILDING (PHASE 1A)

PHASE 1A PHASE 1A

NORTH WETLAND

MITIGATION AREA

SOUTH WETLAND

MITIGATION AREA

Sheets and Views
GC101 - CONSTRUCTION PHASING PLAN - PHASE 1
2026-06-25T11:14:16-0400
Joshua D Corum
I am approving this document
2026-06-29T13:56:40-0400
Norfolk, VA
James E. Donahue, R.A.
I, James E. Donahue, R.A., am signing this document to confirm that it has been reviewed.

2026-06-29T13:57:13-0400

File details come from the government source that posted it. Updated .