About this file

This is a Pre-proposal Inquiry (PPI) Responses document that addresses contractor questions submitted during the solicitation phase of a federal construction project.

Three inquiries (PPIs 17, 18, and 19) requested extension of the proposal due date, citing the magnitude, size, complexity, and specialized nature of the construction project, as well as unanswered PPIs. All three requests were addressed through Amendment 0004. PPI 20 sought confirmation that copies of Prior Performance Questionnaires (PPQs) previously submitted to NAVFAC for prior solicitations could be included with the proposal to satisfy Factor 4 - Past Performance requirements; this request was confirmed. PPIs 21 and 22 posed identical questions regarding whether a second site visit would be permitted before the bid date, given that photographs were prohibited during the initial site visit and specialty subcontractors needed additional access for evaluation purposes. Both requests were denied, with the response stating that a second site visit is unable to be accommodated.

View the file

Other files

File Type Posted
N4008526R00040014 SF 30.pdf PDF
Amend 0014 Spec 1667770.pdf PDF
N4008526R00040013 SF 30.pdf PDF
N4008526R00040011 SF 30.pdf PDF
N4008526R00040012 SF 30.pdf PDF
1667770spc08.25.26.pdf PDF
N4008526R00040010 SF 30.pdf PDF
ATTACHMENT H - Price Proposal Form REV4.docx DOCX document
APPENDIX_D_Air Leakage Rate by Fan Pressurization.xlsx XLSX spreadsheet
ATTACHMENT V - SUBASEINST 8020.1G.pdf PDF
Amendment_0010_Drawings.pdf PDF
APPENDIX_C_Test Agency Qualification Sheet.docx DOCX document
APPENDIX_A_Air Leakage Test Form.docx DOCX document
APPENDIX_B_Air Leakage Test Results Form.docx DOCX document
P1102_GC101 - CONSTRUCTION PHASING PLAN - PHASE 1.pdf PDF
ATTACHMENT T - P1102_PROD.xlsx XLSX spreadsheet
1667770spc07.28.26_rev.pdf PDF
Revised Attachment H - Price Proposal Form REV 3.docx DOCX document
ATTACHMENT U - NLON Soil Management SOP_JUN25.pdf PDF
N4008526R00040009 SF 30.pdf PDF
N4008526R00040008 SF 30.pdf PDF
ATTACHMENT Q - NRZ_Checklist-POAM_Items.pdf PDF
P-1102_Amend 0007_Drawings2of3.pdf PDF
ATTACHMENT S - UPDATED Wage Determination.pdf PDF
P-1102_Amend 0007_Specifications.pdf PDF
P1102_Amend 0007_Drawings3of3.pdf PDF
ATTACHMENT R - Geo Inv Analytical Rep.pdf PDF
Revised Attachment H Price Proposal Form REV2.docx DOCX document
P-1102_Amend 0007_Drawings1of3.pdf PDF
N4008526R00040007 SF 30.pdf PDF
ATTACHMENT L - Explosive Safety-HERO training.pptx PPTX presentation
ATTACHMENT P - NAVSEA OP 5 REV 9.pdf PDF
JA ML-26-14 P1102 Rock Fall_Redacted.pdf PDF
JA ML-26-16 P1102 Interior Finishes_Redacted.pdf PDF
JA ML-26-15 P1102 Stormwater_Redacted.pdf PDF
P-1102_Amend 0006_Drawings_rev.pdf PDF
JA ML-26-12 P1102 ESS_Redacted.pdf PDF
ATTACHMENT N - NDDB Determination Renewal 16JAN2026.pdf PDF
JA ML-26-13 P1102 Fire Alarm_Redacted.pdf PDF
ATTACHMENT O - MK48 STORAGE FACILITY.pdf PDF
ATTACHMENT M - Permits Record of Decision (PROD).pdf PDF
N4008526R00040006 SF 30.pdf PDF
P1102_Amend 0006_Specifications_rev.pdf PDF
UPDATED ATTACHMENT H Price Proposal Form REV1.docx DOCX document
N4008526R00040005 SF 30.pdf PDF
Amendment N4008526R00040004 SF 30.pdf PDF
Attachment F-Small Business Participation Commitment.pdf PDF
Attachment G- Small Business Subcontracting Plan (SBSP) Rev.pdf PDF
N4008526R00040003 SF 30.pdf PDF
Amendment 0003PPIs.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2. Pre- proposal Inquiry Responses

PPI

Page Section Paragraph Question Response

Given the magnitude and complexity of this project, we request that the proposal due date be extended to May 14, 2026

See Amendment

Given the size, complexity and specialized construction of this project, please extend the proposal due date to June 14.

Given the size, complexity, scope and unanswered PPIs, please extend the proposal due date to June 14.

20 15 Factor 4 1

Please confirm that copies of PPQs filled out and submitted to NAVFAC for prior solicitations may be provided with the proposal to fulfill the requirements of Factor 4 - Past Performance.

Confirmed

Since photos were not allowed on the initial site visit, some of the specialty subcontractors were inquiring if a second site visit would be allowed before the bid date?

A second site visit is unable to be accommodated.

Since photos were not allowed on the initial site visit, some of the specialty subcontractors were inquiring if a second site visit would be allowed before the bid date?

A second site visit is unable to be accommodated.