About this file

This document is a Pre-proposal Inquiry (PPI) Responses table addressing bidder questions regarding a federal construction project for a weapons magazine facility.

The responses clarify several key project requirements and constraints. Regarding site conditions, bidders must refer to boring logs shown on drawings and bid accordingly, as a geotechnical report will not be provided. The design conforms to the Build America Buy America Act (BABA) with no waivers proposed or awarded. Unified Facilities Criteria (UFC) 3-520-01 applies to the project; however, UFGS Section 26 05 19.10.10 does not apply, and all work must follow the plans and specifications provided. The interested vendors list is available in Attachment K (P1102 Site Visit Log) and on sam.gov. The government declined to provide responder information from the Sources Sought phase for specialty items including interior finishes, stormwater management products, fire alarm systems, electronic security systems, and rock fall protection systems. Attachment H (P1102 Price Proposal Form) will become part of the final contract and defines scope elements related to rock and bid notes.

View the file

Other files

File Type Posted
N4008526R00040014 SF 30.pdf PDF
Amend 0014 Spec 1667770.pdf PDF
N4008526R00040013 SF 30.pdf PDF
N4008526R00040011 SF 30.pdf PDF
N4008526R00040012 SF 30.pdf PDF
APPENDIX_D_Air Leakage Rate by Fan Pressurization.xlsx XLSX spreadsheet
ATTACHMENT H - Price Proposal Form REV4.docx DOCX document
N4008526R00040010 SF 30.pdf PDF
1667770spc07.28.26_rev.pdf PDF
ATTACHMENT T - P1102_PROD.xlsx XLSX spreadsheet
P1102_Amend 0007_Drawings3of3.pdf PDF
P-1102_Amend 0007_Drawings2of3.pdf PDF
ATTACHMENT R - Geo Inv Analytical Rep.pdf PDF
ATTACHMENT Q - NRZ_Checklist-POAM_Items.pdf PDF
Revised Attachment H Price Proposal Form REV2.docx DOCX document
JA ML-26-16 P1102 Interior Finishes_Redacted.pdf PDF
JA ML-26-15 P1102 Stormwater_Redacted.pdf PDF
JA ML-26-13 P1102 Fire Alarm_Redacted.pdf PDF
JA ML-26-12 P1102 ESS_Redacted.pdf PDF
ATTACHMENT N - NDDB Determination Renewal 16JAN2026.pdf PDF
ATTACHMENT L - Explosive Safety-HERO training.pptx PPTX presentation
P-1102_Amend 0006_Drawings_rev.pdf PDF
ATTACHMENT O - MK48 STORAGE FACILITY.pdf PDF
N4008526R00040005 SF 30.pdf PDF
Amendment 0004 PPIs.pdf PDF
Attachment G- Small Business Subcontracting Plan (SBSP) Rev.pdf PDF
Attachment K - P1102 Site Visit Log.pdf PDF
Amendment 0002 PPIs.pdf PDF
N4008526R00040002 SF 30.pdf PDF
Attachment I - Site Visit Map.pdf PDF
N4008526R00040001 SF 30.pdf PDF
Attachment D - Past Performance Questionnaire.pdf PDF
FINAL DESIGN_1667770dwg2of3Operations.pdf PDF
FINAL DESIGN_1667770dwg2of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg2of4Site.pdf PDF
FINAL DESIGN_1667770dwg3of4Site.pdf PDF
P-1102_1667770spc1of3.pdf.pdf PDF
P-1102_1667770spc3of3.pdf.pdf PDF
Solicitation - N4008526R0004.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Attachment F - Small Business Participation Commitment.pdf PDF
FINAL DESIGN_1667770dwg1of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeG.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeH.pdf PDF
Attachment C - Construction Experience Project Data.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.pdf PDF
FINAL DESIGN_1667770dwg1of3Operations.pdf PDF
FINAL DESIGN_1667770dwg1of4Site.pdf PDF
FINAL DESIGN_1667770dwg4of4Site.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. Pre- proposal Inquiry Responses

PPI

Page Section Paragraph Question Response

10 B-102

Can a top bedrock elevation plan, similar to the one given on sheet B- 102, be provided for the area around existing building 524 and proposed operations building?

Refer to boring logs shown on drawings and bid accordingly.

We are unable to locate the Geotech report. Can you please provide the document?

Geotechnical report will not be provided - please bid per drawings and specifications.

Electrical

Regarding the Build America Buy America Act (BABA), please confirm the products in this design and that are specified comply with all BABA requirements or otherwise please: 1. Identify all General Applicability Waivers related to any products, categories of products or manufactured products specified for this project. 2. Name all project level waivers that have been proposed and/or awarded for this project.

Yes, the design conforms to BABA. No waivers have been proposed.

13 Electrical

Because this facility is owned by the United Stated Federal Government, and is utilized as a Weapons Magazine Facility, we understand that Unified Facilities Criteria ("UFC) 3-520-01 and Unified Facilities Guide Specifications (UFGS) Section 26 05 19.10.10 shall apply for purposes of competitive bidding and project execution. To ensure that the project is bid and constructed in accordance with the applicable regulations and requirements, please confirm that UFC 3-520-01 and

UFC 3-520-01

applies to this project. UFGS Section 26 05

19.10.10 does not apply to this project. All work must be performed in accordance with the plans and

UFGS Section 26 05 19.10.10 shall apply to this project. Specifically, please confirm that bidders are permitted to utilize the type(s) of material(s) described in UFC 3-520- 01 and Section 26 05 19.10.10 applicable to their scope of work despite any potentially contradictory provisions in the design plans and

14 Electrical

Is there a plan holders list or interested contractors list for this project? I didn't see anything posted on the Sam.gov website with this information.

Please see Attachment K - P1102 Site Visit Log for an interested vendors list. An interested vendors list is also available on sam.gov under the subject solicitation.

During the Sources Sought Phase several Sources Sought were posted to Sam.gov for specialty items: 1) 30 Interior finish items; 2) Contech stormwater management products;

3) Fire alarm radio transmitter - STAR software by Kingfisher Co.;

4) Electronic Security System; 5) Geobrugg's TECO rock fall system.

Can the responders to each sources sought be provided to offerors?

The requested information is unable to be provided.

Attachment

H

Ref. Attachment H Bid Price Schedule - This document appears to contain language that will determine the scope of work (Rock, Bid Notes, etc.). Will this document become part of the final contract?

Attachment H - P1102 Price Proposal Form will become part of the final contract.

File details come from the government source that posted it. Updated .