Attachment F-Small Business Participation Commitment.pdf

PDF 159 KB Posted

Attached to
Design-Bid-Build, P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation number
N4008526R0004
Issued by

About this file

This is a Small Business Participation Commitment Document (SBPCD) template for RFP N40085-26-R-0004 concerning the P1102 Weapons Magazine & Ordnance Operations Facility in New London, CT. The form is mandatory for all offerors, both large and small businesses, and serves as the sole evaluation document for Factor 5 (Small Business Utilization and Participation).

All offerors must complete Section 2 identifying their business size and applicable socioeconomic categories (SDB, WOSB, EDWOSB, HUBZone SB, VOSB, SDVOSB). Section 3 requires disclosure of total contract value, self-performed work, and subcontracted work. Section 4 mandates completion of a participation table showing dollar values and percentages of total contract value allocated to small businesses, with a minimum 20% small business participation requirement. When the minimum is not met, detailed justification is required. Offerors must identify subcontractors with firm commitments (evidenced by written teaming agreements, joint venture agreements, mentor-protégé agreements, or signed commitment letters) in a supporting table. Section 5 requires explanation if no subcontractors with firm commitments are identified and how the offeror will achieve proposed small business participation. Section 6 applies only to large business offerors intending not to subcontract, requiring detailed explanation of why subcontracting would not result in efficient contract performance. Small businesses planning to self-perform 100% are exempt from providing explanation. All dollar amounts must be rounded to the nearest whole dollar and percentages to the nearest tenth of a percent.

View the file

Other files

File Type Posted
Amend 0014 Spec 1667770.pdf PDF
N4008526R00040013 SF 30.pdf PDF
N4008526R00040012 SF 30.pdf PDF
N4008526R00040010 SF 30.pdf PDF
APPENDIX_A_Air Leakage Test Form.docx DOCX document
APPENDIX_B_Air Leakage Test Results Form.docx DOCX document
APPENDIX_C_Test Agency Qualification Sheet.docx DOCX document
Amendment_0010_Drawings.pdf PDF
ATTACHMENT T - P1102_PROD.xlsx XLSX spreadsheet
ATTACHMENT U - NLON Soil Management SOP_JUN25.pdf PDF
N4008526R00040009 SF 30.pdf PDF
N4008526R00040008 SF 30.pdf PDF
Revised Attachment H Price Proposal Form REV2.docx DOCX document
P-1102_Amend 0007_Drawings1of3.pdf PDF
ATTACHMENT S - UPDATED Wage Determination.pdf PDF
N4008526R00040007 SF 30.pdf PDF
ATTACHMENT O - MK48 STORAGE FACILITY.pdf PDF
ATTACHMENT M - Permits Record of Decision (PROD).pdf PDF
UPDATED ATTACHMENT H Price Proposal Form REV1.docx DOCX document
P1102_Amend 0006_Specifications_rev.pdf PDF
N4008526R00040006 SF 30.pdf PDF
JA ML-26-14 P1102 Rock Fall_Redacted.pdf PDF
ATTACHMENT P - NAVSEA OP 5 REV 9.pdf PDF
N4008526R00040005 SF 30.pdf PDF
Attachment G- Small Business Subcontracting Plan (SBSP) Rev.pdf PDF
Amendment N4008526R00040004 SF 30.pdf PDF
Attachment K - P1102 Site Visit Log.pdf PDF
Amendment 0003PPIs.pdf PDF
N4008526R00040003 SF 30.pdf PDF
N4008526R00040002 SF 30.pdf PDF
N4008526R00040001 SF 30.pdf PDF
Attachment J - SECNAV 5512.pdf PDF
Solicitation - N4008526R0004.pdf PDF
Attachment B - PIEE Vendor Access Instructions.pdf PDF
Attachment E - Historical Small Business Utilization.pdf PDF
Attachment F - Small Business Participation Commitment.pdf PDF
FINAL DESIGN_1667770dwg1of2Sentry.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeG.pdf PDF
FINAL DESIGN_1667770dwg1of1TypeH.pdf PDF
Attachment C - Construction Experience Project Data.pdf PDF
Attachment G - Individual Small Business Subcontracting Plan.pdf PDF
FINAL DESIGN_1667770dwg1of3Operations.pdf PDF
FINAL DESIGN_1667770dwg1of4Site.pdf PDF
FINAL DESIGN_1667770dwg4of4Site.pdf PDF
Attachment A - Pre Proposal Inquiry Log.xlsx XLSX spreadsheet
Attachment H - P1102 Price Proposal Form.pdf PDF
FINAL DESIGN_1667770dwg1of2CLWS.pdf PDF
FINAL DESIGN_1667770dwg2of2CLWS.pdf PDF
FINAL DESIGN_1667770dwg3of3Operations.pdf PDF
P-1102_1667770spc2of3.pdf.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment F – SBPCD, Page 1 of 3 (Rev 10/2022)

(ATTACHMENT F)

SMALL BUSINESS PARTICIPATION

COMMITMENT DOCUMENT (SBPCD)

OFFEROR’S NAME

ADDRESS

RFP N40085-26-R-0004

P1102 Weapons Magazine & Ordnance Operations Facility New London, CT

Date Prepared

1. Instructions. The SBPCD includes the minimum level of commitment to subcontract with the

SBs identified herein. This form is to be completed by ALL offerors (both large AND small businesses) in order to provide supporting information for evaluation of Factor 5, Small Business Utilization and Participation. This is the only form that will be evaluated to determine the offeror’s small business participation commitment. Information provided in a different format and/or on a form created by the offeror will not be evaluated. Attachments or addendums to this form will not be evaluated. Round dollars to nearest whole dollar and percentages to the nearest tenth of a percent.

2. Offeror Information. Prime contractor size based on the NAICS Code identified in the solicitation (check one):

☐ Large Business (LB) ☐ Small Business (SB)

For offerors that identify as a SB, check all applicable socioeconomic categories that apply or check “None” if the offeror does not qualify under any of the socioeconomic categories:

☐ Small Disadvantaged Business (SDB)

☐ Woman-Owned Small Business (WOSB) ☐ Economically Disadvantaged Woman-Owned Small Business (EDWOSB) ☐ Historically Underutilized Business Zone Small Business (HUBZone SB) ☐ Veteran-Owned Small Business (VOSB) ☐ Service-Disabled Veteran-Owned Small Business (SDVOSB)

☐ None

3. Subcontracting Breakdown.

a. Total contract value (TCV)(including options) $

b. Total value of the work to be self-performed by the prime offeror $

c. Total value of work to be subcontracted $ _____

Attachment F – SBPCD, Page 2 of 3

4. Small Business Participation.

a. Complete the participation table below with dollars and % of total contract value to be subcontracted.

Small Business Participation (Including Small Business prime offeror’s participation)

Business Category Dollar Value % of TCV Total Small Business (SB) (including all SB socio-economic categories and work self-performed as a SB) The minimum total small business subcontracting requirement for this contract is 20%. If this minimum small business participation requirement is not met, a detailed explanation is required below.

Small Disadvantaged Business (SDB) $ % Woman-Owned Small Business (WOSB) $ % Historically Underutilized Business Zone Small Business (HUBZone) $ % Veteran-Owned Small Business (VOSB) $ % Service-Disabled Veteran-Owned Small Business (SDVOSB) $ %

If the offeror has not proposed a minimum of 20% for small business participation, provide a detailed explanation:

b. To the greatest extent possible, the table below should identify SBs where firm commitments are in place, to support the minimum small business participation requirement identified in paragraph 4.a (above). If subcontracting firm commitments are NOT in place, do not add the subcontractor to the table below. A SB commitment is a written agreement between a prime and small business to work together on this contract. This commitment in writing is considered the nature of commitment, which can include written teaming agreement, joint venture agreement, mentor-protégé agreement, written/signed letter of commitment from the small business, etc. This table can be expanded as needed.

Company Name Small Business Category(ies)*

Products/Services, including type & variety of work Nature of Commitment

Attachment F – SBPCD, Page 3 of 3

*SB, SBD, WOSB, HUBZone SB, VOSB, SDVOSB

5. Explanation/Rationale. If no subcontractors are identified in paragraph 4.b. above, provide detailed explanation for why subcontractors are not identified with firm commitments AND how your firm will be able to achieve the proposed small business participation.

6. If a LB offeror does not intend to subcontract, provide a detailed explanation why subcontracting would not result in efficient contract performance. SBs intending to 100% self-perform are not required to provide an explanation.

(ATTACHMENT F)
RFP N40085-26-R-0004
P1102 Weapons Magazine & Ordnance Operations Facility

File details come from the government source that posted it. Updated .