N4008526R00040012 SF 30.pdf
PDF 726 KB Posted
- Solicitation number
- N4008526R0004
About this file
This is Standard Form 30 (Amendment of Solicitation/Modification of Contract) Amendment 0012 for a Design-Bid-Build (DBB) project issued by the Naval Facilities Systems Command Mid-Atlantic.
The amendment modifies solicitation N4008526R0004, dated 02 March 2026, for the P1102 Weapons Magazine & Ordnance Operations Facility at Naval Submarine Base, New London, Connecticut (Project Number 1667770). The amendment was issued on 14 September 2026 by NAVFACSYSCOM Mid-Atlantic (Code N40085) and is administered by the same office. The contracting officer is Kristy L. Gerrek. The amendment is not extended and incorporates updated and additional Pre-Proposal Information (PPI) responses. PPI Response 485 addresses contractor concerns regarding milestone scheduling, specifically regarding Milestone 1 (construction of a 10,500 SF Operations Building) and Milestone 5 (installation of six CLWS magazines requiring DALT, TAB, and PVT). The Government's response explains that the 650-calendar-day allocation for Milestone 1 (436 days after removing 214-day blasting restrictions) provides approximately 14.3 months for construction and represents an aggressive but achievable schedule. Milestone 5's 285-day duration reflects an aggressive 10-month schedule to avoid the no-blasting window. PPI Response 515 clarifies that a second copy of Standard Form 1442, page 2 is acceptable to acknowledge amendments beyond number 10, as the form only provides space for 10 amendments. All correspondence regarding this solicitation shall be directed via email to Angie Clifton at angela.j.clifton2.civ@us.navy.mil.
View the file
Other files
Show 40 more
Latest 50 of 81 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Block 14 (Description of Amendment/Modification): N40085-26-R-0004, Design-Bid-Build (DBB), P1102 WEAPONS MAGAZINE &
ORDNANCE OPERATIONS FACILITY, NAVAL SUBMARINE BASE, NEW LONDON, CONNECTICUT
SECTION SF30 BLOCK 14 CONTINUATION PAGE
ALL CORRESPONDENCE REGARDING THIS SOLICITATION SHALL BE DIRECTED VIA EMAIL TO ANGIE CLIFTON AT ANGELA.J.
CLIFTON2.CIV@US.NAVY.MIL.
This amendment is issued to incorporate the following:
1. Provide Updated and additional PPI responses
Section 00 73 00 - Supplementary Conditions
The following attachments were added:
Amend 0012 Continuation Page
N4008526R00040012
SECTION SF30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
The following have been added by full text:
AMENDMENT 0012
This amendment is issued to incorporate the following:
1. Provide Updated and additional PPI Responses (enclosed)
1. Provide Updated and additional PPI Responses (enclosed)
PPI # Page Section Paragraph Question Response updated
PPI 485 requested an additional 215 days for the blasting restriction caused by the December 16th award date. Milestone 1 was only extended by 92 days causing it still to be very difficult to achieve that milestone.
Is there a reason that milestone 1 was not extended a full 215 days?
Milestone 5 now is only 285 days compared to 486 days in amendment 0009.
This timeline is now very aggressive to complete installation of
(6) CLWS magazines that require DALT, TAB, and PVT. The shortened duration of multiple milestones is causing the schedule to be further compressed and potentially not achievable.
Removing the 214 calendar days due to the blasting restrictions from the 650 calendar days allotted to complete Milestone 1 leaves 436 calendar days or roughly 14.3 Months to construct the 10,500 SF OPS Building. Increasing Milestone 1 by 215 calendar days would result in a 25.4-month construction duration which would extend the project schedule.
The previous 486 calendar day requirement was due to the rock excavation falling in the “no blasting” window. This milestone is on the lower bound of an aggressive schedule approximately 10-months (aggressive would be in the 10 to 12-month range); the Government went with this approach to try and avoid the no blasting window.
515 2 19 1
Standard Form 1442, Section 19, requires acknowledgement of amendments. There are spaces available for acknowledgement of 10 amendments.
Eleven (11) amendments have been issued to date. Should a second copy of Form 1442 page 2 be provided to acknowledge amendments beyond number 10?
Yes, that is acceptable.
| IDCode: J |
| Page: 1 |
| Pages: 4 |
| AmendNo: 0012 |
| EffDate: 14 Sep 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: 1667770 |
| IssCode: N40085 |
| AdmCode: |
| IssuedBy: NAVFACSYSCOM MID-ATLANTIC |
9324 VIRGINIA AVENUE, NORFOLK VA 23511-0395
NORFOLK, VA 23511-0395
UNITED STATES
Angela Clifton, Email: angela.j.clifton2.civ@us.navy.mil Telephone: 757-341-0692 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N4008526R0004 |
| SolDate: 02 Mar 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: Off |
| OffrNoEx: 1 |
| NoCopies: 1 |
| ApprData: See Section 00 70 00 - Conditions of the Contract |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: See Schedule |
| ContNameTitle: |
| CoNameTitle: KRISTY L. GERREK |
| ContDate: |
| CODate: 14 Sep 2026 |
File details come from the government source that posted it. Updated .