This document comprises architectural and engineering drawings and specifications for the Weapons Magazine & Ordnance Operations Facility project (P-1102) at Naval Submarine Base New London, Groton, Connecticut, prepared by NAVFAC Mid-Atlantic.

The project involves a three-phase construction program to demolish existing magazines and construct new weapons storage facilities. Phase 1A includes demolition of magazines A98, A99, A110, and A111; rock blasting and excavation; construction of an Operations Building with associated utilities and parking; and installation of permanent storm water management facilities. Phase 1B requires installation of a Type H magazine with utility rerouting and temporary sediment traps converted to permanent storm water facilities. Phase 1C involves demolition of Building 524 and associated utilities. Phase 2 includes demolition of magazines A94-A97, construction of Type G magazines (G-001 and G-002), and construction of a Sentry Building. Phase 3 requires demolition of magazines A100-A109, construction of six CLWS magazines, and demolition of Building 393. The drawings specify construction phasing plans, site layout, grading and drainage, utility locations, structural details, material specifications, electrical systems including heat trace plans and telecommunications infrastructure, and foundation design incorporating ground improvement systems. Critical construction requirements include maintaining security and access to active magazines throughout all phases, completing explosive safety training for contractor personnel, prohibiting equipment fueling within the munitions compound, submitting spark-producing equipment for approval, and immediate cessation of work upon request from security or munitions staff. Foundation design accommodates compacted native soils with minimum 4,000 PSF bearing capacity, and concrete specifications range from 4,000 to 4,500 PSI with detailed reinforcement and cover requirements. Project approval is dated 05/27/2025, with amendments effective 05/19/2026.

View the file

Other files

File Type Posted
N4008526R00040014 SF 30.pdf PDF
Amend 0014 Spec 1667770.pdf PDF
N4008526R00040013 SF 30.pdf PDF
N4008526R00040011 SF 30.pdf PDF
N4008526R00040012 SF 30.pdf PDF
1667770spc08.25.26.pdf PDF
N4008526R00040010 SF 30.pdf PDF
ATTACHMENT H - Price Proposal Form REV4.docx DOCX document
APPENDIX_D_Air Leakage Rate by Fan Pressurization.xlsx XLSX spreadsheet
ATTACHMENT V - SUBASEINST 8020.1G.pdf PDF
Amendment_0010_Drawings.pdf PDF
APPENDIX_C_Test Agency Qualification Sheet.docx DOCX document
APPENDIX_A_Air Leakage Test Form.docx DOCX document
APPENDIX_B_Air Leakage Test Results Form.docx DOCX document
P1102_GC101 - CONSTRUCTION PHASING PLAN - PHASE 1.pdf PDF
ATTACHMENT T - P1102_PROD.xlsx XLSX spreadsheet
1667770spc07.28.26_rev.pdf PDF
Revised Attachment H - Price Proposal Form REV 3.docx DOCX document
ATTACHMENT U - NLON Soil Management SOP_JUN25.pdf PDF
N4008526R00040009 SF 30.pdf PDF
N4008526R00040008 SF 30.pdf PDF
ATTACHMENT Q - NRZ_Checklist-POAM_Items.pdf PDF
P-1102_Amend 0007_Drawings2of3.pdf PDF
ATTACHMENT S - UPDATED Wage Determination.pdf PDF
P-1102_Amend 0007_Specifications.pdf PDF
P1102_Amend 0007_Drawings3of3.pdf PDF
ATTACHMENT R - Geo Inv Analytical Rep.pdf PDF
Revised Attachment H Price Proposal Form REV2.docx DOCX document
N4008526R00040007 SF 30.pdf PDF
ATTACHMENT L - Explosive Safety-HERO training.pptx PPTX presentation
ATTACHMENT P - NAVSEA OP 5 REV 9.pdf PDF
JA ML-26-14 P1102 Rock Fall_Redacted.pdf PDF
JA ML-26-16 P1102 Interior Finishes_Redacted.pdf PDF
JA ML-26-15 P1102 Stormwater_Redacted.pdf PDF
P-1102_Amend 0006_Drawings_rev.pdf PDF
JA ML-26-12 P1102 ESS_Redacted.pdf PDF
ATTACHMENT N - NDDB Determination Renewal 16JAN2026.pdf PDF
JA ML-26-13 P1102 Fire Alarm_Redacted.pdf PDF
ATTACHMENT O - MK48 STORAGE FACILITY.pdf PDF
ATTACHMENT M - Permits Record of Decision (PROD).pdf PDF
N4008526R00040006 SF 30.pdf PDF
P1102_Amend 0006_Specifications_rev.pdf PDF
UPDATED ATTACHMENT H Price Proposal Form REV1.docx DOCX document
N4008526R00040005 SF 30.pdf PDF
Amendment N4008526R00040004 SF 30.pdf PDF
Attachment F-Small Business Participation Commitment.pdf PDF
Attachment G- Small Business Subcontracting Plan (SBSP) Rev.pdf PDF
Amendment 0004 PPIs.pdf PDF
N4008526R00040003 SF 30.pdf PDF
Amendment 0003PPIs.pdf PDF
Show 40 more

Latest 50 of 81 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SAN

SAN

W

W

W

W

SD

SD

SD

X

X X X

X X

X X X

X X

X

GENERAL SHEET NOTES

GRAPHIC SCALE

PHASING NOTES

5/

/2

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

PH

AS

E

CO

NS

TR

UC

TI

O

N

PH

AS

IN

G P

LA

N

GC101

OPERATIONS

BUILDING

EXST-001

(A114)TYPE H-001

PHASE 1A

1. PROVIDE TEMPORARY CONSTRUCTION ACCESS AND SECURITY FENCING

TO ENSURE A SECURE PERIMETER AROUND EXISTING MAGAZINES TO

REMAIN IN PLACE DURING PHASE 1 OPERATIONS (MAGAZINES A94-A97,

A-100-A104, A105-A109, A113, AND A114). REFER TO CIVIL DETAIL A1/CS504

FOR SECURITY FENCING INFORMATION.

2. DEMOLISH EXISTING MAGAZINES A98, A99, A110, AND A111 INCLUDING

ASSOCIATED PAVEMENTS AND UTILITIES. INSTALL TEMPORARY

SEDIMENT TRAPS 1 AND 3

3. ROCK BLASTING AND EXCAVATION FOR OPERATIONS BUILDING AND

NEAR MAGAZINES A98, A99, A110, AND A111.

4. CONSTRUCT PERMANENT STORM WATER FACILITY A EAST OF EXST-001

(A114). MAINTAIN TREATMENT CHAMBERS OFFLINE UNTIL FINAL SITE

STABILIZATION.

5. OPERATIONS BUILDING CONSTRUCTION INCLUDING SITE PREPARATION,

DRAINAGE INFRASTRUCTURE, UTILITY INSTALLATION, ACCESS ROAD, AND

PARKING LOT. CONVERT TEMPORARY SEDIMENT TRAP 1 TO PERMANENT

STORM WATER FACILITY. MAINTAIN TREATMENT CHAMBERS OFFLINE

UNTIL FINAL SITE STABILIZATION.

6. TRANSFER OF PERSONNEL TO OPERATIONS BUILDING.

PHASE 1B

1. INSTALL TEMPORARY SEDIMENT TRAP 2. REROUTE AND DEMOLISH

EXISTING UTILITIES NECESSARY TO CONSTRUCT TYPE H MAGAZINE.

2. SITE PREPARATION, UTILITY INSTALLATION, AND CONSTRUCTION OF

TYPE H MAGAZINE. CONVERT TEMPORARY SEDIMENT TRAP 2 TO

PERMANENT STORM WATER FACILITY. MAINTAIN TREATMENT

CHAMBERS OFFLINE UNTIL FINAL SITE STABILIZATION.

PHASE 1C

1. DEMOLITION OF EXISTING BUILDING 524, UTILITIES, AND PAVEMENTS.

A1 CONSTRUCTION PHASING PLAN - PHASE 1

1" = 100'

ROCK BLASTING AND

EXCAVATION AREA (PHASE 1A)

A99 A110

A111A98

STORM WATER

FACILITY A

ROCK BLASTING AND

EXCAVATION

EXISTING

BUILDING 524

1. REFER TO SHEETS C-001 TO C-004 FOR ADDITIONAL NOTES, EROSION

CONTROL SEQUENCING, CONTRACTOR LAY DOWN AREA, AND SITE

ACCESS.

2. REFER TO SHEETS CD100 TO CD103 FOR SITE DEMOLITION

INFORMATION.

3. REFER TO SHEETS CS100 TO CS103 FOR SITE LAYOUT INFORMATION.

4. REFER TO SHEETS CG100 TO CG103 FOR SITE GRADING AND

DRAINAGE INFORMATION.

5. REFER TO SHEETS CU100 TO CU103 FOR SITE UTILITY INFORMATION.

6. MAINTAIN ACCESS AND FUNCTIONALITY OF MAGAZINES TO REMAIN

DURING PHASE 1 OPERATIONS INCLUDING POWER, SECURITY

FEATURES, GROUNDING GRID, AND INTRUSION DETECTION SYSTEM.

7. TEMPORARY SECURITY FENCE MUST BE INSTALLED PRIOR TO

DEMOLITION OF EXISTING PERIMETER FENCE AND BE FULLY

GROUNDED AND BONDED.

8. CONTRACTOR MUST IMMEDIATELY CEASE BLASTING, EXCAVATION,

DEMOLITION, CONSTRUCTION ACTIVITIES, AND VACATE THE SITE AT

THE REQUEST OF SECURITY FORCES, MUNITIONS STAFF, OR

CONTRACTING OFFICER TO FACILITATE NORMAL OPERATIONS AND

SECURITY DRILLS ON SITE. CONSTRUCTION AND DEMOLITION

ACTIVITIES, INCLUDING SITE ACCESS, WILL ONLY BE ALLOWED TO

RESUME UPON VERBAL APPROVAL OF SECURITY FORCES, MUNITIONS

STAFF, OR THE CONTRACTING OFFICER.

9. THE GOVERNMENT WILL MAINTAIN ACCESS CONTROL TO ACTIVE

MAGAZINES (MAGAZINES NOT SCHEDULED FOR DEMOLITION DURING

PHASE 1). DO NOT BLOCK THE ENTRANCE TO OR OTHERWISE IMPEDE

GOVERNMENT ACCESS TO ACTIVE MAGAZINES. THE CONTRACTOR

WILL NOT HAVE FREE ACCESS TO ACTIVE MAGAZINES FOR THE

DURATION OF CONSTRUCTION.

10. CONTRACTOR EMPLOYEES, INCLUDING SUBCONTRACTORS, MUST

COMPLETE EXPLOSIVE SAFETY TRAINING PRIOR TO SITE ACCESS.

11. EQUIPMENT FUELING WITHIN THE MUNITIONS COMPOUND IS STRICTLY

PROHIBITED, FUELING MUST ONLY OCCUR WITHIN THE CONTRACTOR

LAY DOWN AND STAGING AREA.

12. SUBMIT LIST OF SPARK PRODUCING EQUIPMENT, OR EQUIPMENT

UTILIZING PROPANE GAS, TO THE CONTRACTING OFFICER FOR

APPROVAL PRIOR TO USE ON SITE.

TEMPORARY SEDIMENT TRAP 1

(PHASE 1A) & PERMANENT STORM

WATER FACILITY C (PHASE 1A)

ROCK BLASTING AND

EXCAVATION AREA (PHASE 1A)

EXST-002

(A113)

PHASE 1A

TEMPORARY SEDIMENT TRAP 2 (PHASE 1B)

& PERMANENT STORM WATER

MANAGEMENT FACILITY B (PHASE 1B)

PHASE 1A

PHASE 1B

DEMOLITION OF

BUILDING 524 (PHASE 1C)

CONTRACTOR

TRAILER LOCATION

EXISTING MAGAZINE

COMPOUND ENTRY GATE

EXISTING

BLDG 393

TEMPORARY SECURITY FENCE

SECURITY FENCE

EXISTING MUNITIONS

COMPOUND ENTRY GATE,

CONTRACTOR ACCESS POINT

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

MI

D-

AT

LA

NT

IC

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N G

RO

TO

N, C

O

NN

EC

TI

CU

T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

SI

TE

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

TEMPORARY SEDIMENT TRAP 3 (PHASE 1A)

A94

A95

A96

A97

A100 A109

A101 A108

A102 A107

A103 A106

A104 A105

CONSTRUCTION OF

OPERATIONS BUILDING (PHASE 1A)

SAN

W

W

W

W

SAN

SAN

SAN

W

W

W

W

SD

X X X

X X

X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X X

X

GENERAL SHEET NOTES

GRAPHIC SCALE

5/

/2

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

PH

AS

E

CO

NS

TR

UC

TI

O

N

PH

AS

IN

G P

LA

N

GC102

A1 CONSTRUCTION PHASING PLAN - PHASE 2

1" = 100'

A94

A95

A96

PHASING NOTES

PHASE 2

1. MAINTAIN TEMPORARY CONSTRUCTION ACCESS AND PROVIDE

TEMPORARY SECURITY FENCING TO ENSURE A SECURE PERIMETER

AROUND EXISTING MAGAZINES TO REMAIN IN PLACE DURING PHASE 2

OPERATIONS (A100-A104, A105-A109, A113, A114, AND TYPE H-001).

REFER TO CIVIL DETAIL A1/CS504 FOR SECURITY FENCING

INFORMATION.

2. DEMOLISH PAVEMENT WEST OF EXST-002 (A113), INSTALL TEMPORARY

SEDIMENT TRAP 4.

3. DEMOLISH EXISTING MAGAZINES A94, A95, A96, AND A97 INCLUDING

ASSOCIATED PAVEMENTS AND UTILITIES.

4. ROCK BLASTING AND EXCAVATION FOR TYPE G MAGAZINES NEAR

MAGAZINES A94, A95, A96, AND A97.

5. CONSTRUCT TYPE G MAGAZINES (TYPE G-001 AND TYPE G-002)

ADJACENT TO EXST-002 (A113), INCLUDING ASSOCIATED PAVEMENTS

AND UTILITIES. REPLACE EXST-002 GROUND RING DURING PAVEMENT

DEMOLITION AND REPLACEMENT ASSOCIATED WITH TYPE G MAGAZINE

CONSTRUCTION.

6. SITE PREPARATION, INCLUDING UTILITY INSTALLATION, AND

CONSTRUCTION OF SENTRY BUILDING. INSTALLATION OF POWER AND

TELECOMMUNICATIONS EQUIPMENT AND INTRUSION DETECTION

SYSTEM IN SENTRY BUILDING.

1. REFER TO SHEETS C-001 TO C-004 FOR ADDITIONAL NOTES, EROSION

CONTROL SEQUENCING, CONTRACTOR LAY DOWN AREA, AND SITE

ACCESS.

2. REFER TO SHEETS CD100 TO CD103 FOR SITE DEMOLITION

INFORMATION.

3. REFER TO SHEETS CS100 TO CS103 FOR SITE LAYOUT INFORMATION.

4. REFER TO SHEETS CG100 TO CG103 FOR SITE GRADING AND

DRAINAGE INFORMATION.

5. REFER TO SHEETS CU100 TO CU103 FOR SITE UTILITY INFORMATION.

6. MAINTAIN ACCESS AND FUNCTIONALITY OF NEWLY CONSTRUCTED

MAGAZINES AND MAGAZINES TO REMAIN DURING PHASE 2

OPERATIONS INCLUDING POWER, SECURITY FEATURES, GROUNDING

GRID, AND INTRUSION DETECTION SYSTEM.

7. TEMPORARY SECURITY FENCE MUST BE INSTALLED PRIOR TO

DEMOLITION OF EXISTING PERIMETER FENCE AND BE FULLY

GROUNDED AND BONDED.

8. CONTRACTOR MUST IMMEDIATELY CEASE BLASTING, EXCAVATION,

DEMOLITION, CONSTRUCTION ACTIVITIES, AND VACATE THE SITE AT

THE REQUEST OF SECURITY FORCES, MUNITIONS STAFF, OR

CONTRACTING OFFICER TO FACILITATE NORMAL OPERATIONS AND

SECURITY DRILLS ON SITE. CONSTRUCTION AND DEMOLITION

ACTIVITIES, INCLUDING SITE ACCESS, WILL ONLY BE ALLOWED TO

RESUME UPON VERBAL APPROVAL OF SECURITY FORCES, MUNITIONS

STAFF, OR THE CONTRACTING OFFICER.

9. THE GOVERNMENT WILL MAINTAIN ACCESS CONTROL TO ACTIVE

MAGAZINES (MAGAZINES NOT SCHEDULED FOR DEMOLITION DURING

PHASE 1). THE CONTRACTOR WILL NOT BLOCK THE ENTRANCE TO OR

OTHERWISE IMPEDE GOVERNMENT ACCESS TO ACTIVE MAGAZINES.

THE CONTRACTOR WILL NOT HAVE FREE ACCESS TO ACTIVE

MAGAZINES FOR THE DURATION OF CONSTRUCTION.

10. CONTRACTOR EMPLOYEES, INCLUDING SUBCONTRACTORS, MUST

COMPLETE EXPLOSIVE SAFETY TRAINING PRIOR TO SITE ACCESS.

11. EQUIPMENT FUELING WITHIN THE MUNITIONS COMPOUND IS STRICTLY

PROHIBITED, FUELING MUST ONLY OCCUR WITHIN THE CONTRACTOR

LAY DOWN AND STAGING AREA.

12. SUBMIT LIST OF SPARK PRODUCING EQUIPMENT, OR EQUIPMENT

UTILIZING PROPANE GAS, TO THE CONTRACTING OFFICER FOR

APPROVAL PRIOR TO USE ON SITE.

A97

TYPE G-002

TYPE G-001

PHASE 2

EXST-001

(A114)

EXST-002

(A113)

OPERATIONS

BUILDING

TYPE H-001

STORM WATER

FACILITY A

STORM WATER

FACILITY B

PERMANENT STORM

WATER FACILITY C

EXISTING

BUILDING 393

SENTRY BUILDING

CONTRACTOR

TRAILER LOCATION

EXISTING MAGAZINE

COMPOUND ENTRY GATE

TEMPORARY SECURITY FENCE

PERMANENT SECURITY FENCE

TEMPORARY SECURITY FENCE

WITH CONTRACTOR

ACCESS GATE, REFER TO

DETAIL A2/CS503

EXISTING MUNITIONS

COMPOUND ENTRY GATE,

CONTRACTOR ACCESS POINT

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

MI

D-

AT

LA

NT

IC

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N G

RO

TO

N, C

O

NN

EC

TI

CU

T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

SI

TE

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

TEMPORARY SEDIMENT TRAP 4

A100 A109

A101 A108

A102 A107

A103 A106

A104 A105

SAN

W

W

W

W

SAN

SAN

SAN

W

W

W

W

SD

SD

SD XXX

X X

X X

X X

X X

X X

X X

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

X X

X

X

X

X X

X

X

X X

X X

X X

X

X X

XXXX

X

X

XX

X X

X X

X X

X X

X

X X

X

SD

GENERAL SHEET NOTES

GRAPHIC SCALE

5/

/2

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

PH

AS

E

PL

AN

CO

NS

TR

UC

TI

O

N

PH

AS

IN

G P

LA

N

GC103

A1 CONSTRUCTION PHASING PLAN - PHASE 3

1" = 100'

PHASING NOTES

PHASE 3

1. PROVIDE TEMPORARY CONSTRUCTION ACCESS AND SECURITY

FENCING TO ENSURE A SECURE PERIMETER AROUND EXISTING

MAGAZINES TO REMAIN IN PLACE DURING PHASE 3 OPERATIONS (A113,

A114, TYPE H-001, TYPE G-001, AND TYPE G-002). REFER TO CIVIL

DETAIL A1/CS504 FOR SECURITY FENCING INFORMATION.

2. DEMOLISH EXISTING PAVEMENT EAST OF MAGAZINE A105 AND INSTALL

TEMPORARY SEDIMENT TRAP 5.

3. DEMOLISH EXISTING MAGAZINES A100 TO A104 AND A105 TO A109

INCLUDING ASSOCIATED PAVEMENTS AND UTILITIES.

4. CONSTRUCT SIX (6) CLWS MAGAZINES INCLUDING UTILITIES AND

ASSOCIATED PAVEMENT. ENSURE TYPE H MAGAZINE IS COMPLETE

AND OPERATIONAL AND EXST-001 IS EMPTY PRIOR TO DEMOLITION

AND REPLACEMENT OF EXST-001 CONCRETE APRON. REPLACE

EXST-001 GROUND RING DURING PAVEMENT DEMOLITION AND

REPLACEMENT.

5. DEMOLISH EXISTING BUILDING 393 INCLUDING ASSOCIATED UTILITIES

AND PAVEMENTS. ENSURE POWER EQUIPMENT AND INTRUSION

DETECTION SYSTEM HAVE BEEN RELOCATED AND ARE OPERATIONAL

PRIOR TO DEMOLITION OF BUILDING 393.

1. REFER TO SHEETS C-001 TO C-004 FOR ADDITIONAL NOTES, EROSION

CONTROL SEQUENCING, CONTRACTOR LAY DOWN AREA, AND SITE

ACCESS.

2. REFER TO SHEETS CD100 TO CD103 FOR SITE DEMOLITION

INFORMATION.

3. REFER TO SHEETS CS100 TO CS103 FOR SITE LAYOUT INFORMATION.

4. REFER TO SHEETS CG100 TO CG103 FOR SITE GRADING AND

DRAINAGE INFORMATION.

5. REFER TO SHEETS CU100 TO CU103 FOR SITE UTILITY INFORMATION.

6. MAINTAIN ACCESS AND FUNCTIONALITY OF MAGAZINES

CONSTRUCTED DURING PHASE 1 AND 2 OPERATIONS INCLUDING

POWER, SECURITY FEATURES, GROUNDING GRID, AND INTRUSION

DETECTION SYSTEM.

7. TEMPORARY SECURITY FENCE MUST BE INSTALLED PRIOR TO

DEMOLITION OF EXISTING PERIMETER FENCE AND BE FULLY

GROUNDED AND BONDED.

8. CONTRACTOR MUST IMMEDIATELY CEASE BLASTING, EXCAVATION,

DEMOLITION, CONSTRUCTION ACTIVITIES, AND VACATE THE SITE AT

THE REQUEST OF SECURITY FORCES, MUNITIONS STAFF, OR

CONTRACTING OFFICER TO FACILITATE NORMAL OPERATIONS AND

SECURITY DRILLS ON SITE. CONSTRUCTION AND DEMOLITION

ACTIVITIES, INCLUDING SITE ACCESS, WILL ONLY BE ALLOWED TO

RESUME UPON VERBAL APPROVAL OF SECURITY FORCES, MUNITIONS

STAFF, OR THE CONTRACTING OFFICER.

9. THE GOVERNMENT WILL MAINTAIN ACCESS CONTROL TO ACTIVE

MAGAZINES (MAGAZINES CONSTRUCTED DURING PHASE 1 AND 2). THE

CONTRACTOR WILL NOT BLOCK THE ENTRANCE TO OR OTHERWISE

IMPEDE GOVERNMENT ACCESS TO ACTIVE MAGAZINES. THE

CONTRACTOR WILL NOT HAVE FREE ACCESS TO ACTIVE MAGAZINE

FOR THE DURATION OF CONSTRUCTION.

10. CONTRACTOR EMPLOYEES, INCLUDING SUBCONTRACTORS, MUST

COMPLETE EXPLOSIVE SAFETY TRAINING PRIOR TO SITE ACCESS.

11. EQUIPMENT FUELING WITHIN THE MUNITIONS COMPOUND IS STRICTLY

PROHIBITED, FUELING MUST ONLY OCCUR WITHIN THE CONTRACTOR

LAY DOWN AND STAGING AREA.

12. SUBMIT LIST OF SPARK PRODUCING EQUIPMENT, OR EQUIPMENT

UTILIZING PROPANE GAS, TO THE CONTRACTING OFFICER FOR

APPROVAL PRIOR TO USE ON SITE.

A100

A101

A102

A103

A104 A105

A106

A107

A108

A109

CLWS-001

CLWS-002

CLWS-003

CLWS-004

CLWS-005

CLWS-006

PHASE 3

EXST-001

(A114)

EXST-002 (A113)

OPERATIONS

BUILDING

TYPE H-001

STORM WATER

FACILITY A

STORM FACILITY B

STORM WATER

MANAGEMENT FACILITY C

TYPE G-001

TYPE G-002

EXISTING

BUILDING 393

SENTRY BUILDING

EXISTING MAGAZINE

COMPOUND ENTRY GATE

TEMPORARY SECURITY FENCE

PERMANENT SECURITY FENCE

TEMPORARY SECURITY FENCE

MAGAZINE COMPOUND

ENTRY GATE

EXISTING MUNITIONS

COMPOUND ENTRY GATE,

CONTRACTOR ACCESS POINT

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

MI

D-

AT

LA

NT

IC

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N G

RO

TO

N, C

O

NN

EC

TI

CU

T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

SI

TE

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

TEMPORARY SEDIMENT TRAP 5

TEMPORARY SEDIMENT TRAP 2

CONTRACTOR

TRAILER LOCATION

CT-12

CRYSTAL LAKE RD

MILITARY HW

Y / SHARK BLVD

WAHOO AVE

TANG AVE

TRITON AVE

GRAPHIC SCALE

PROJECT AREA

ALPHA LOT

GATE 7

COMMERCIAL

INSPECTION

GENERAL SHEET NOTES

1. AERIAL IMAGERY PROVIDED BY MICROSOFT CORPORATION.

2. EQUIPMENT AND MATERIAL STORAGE AREA IS DESIGNATED ON THIS

SHEET. SECURE EQUIPMENT AND STORED MATERIALS. NO COVERED

STORAGE IS AVAILABLE.

3. VERIFY CONSTRUCTION TRAILER SITE FOR SUITABILITY, SIZE AND

FITMENT OF TRAILERS, FENCING, AND ELECTRICAL TIE IN FEASIBILITY.

4. LOCATE GENERAL CONSTRUCTION LAY DOWN AREA WITHIN THE

WEAPONS COMPOUND AREA TO THE MAXIMUM EXTENT POSSIBLE

WITHOUT IMPACT TO WEAPONS OPERATIONS.

5. OVERFLOW GENERAL LAY DOWN AREA MUST BE LOCATED IN ALPHA

LOT. FULL USE OF ALPHA LOT WILL NOT BE PROVIDED. REVIEW AND

IMPLEMENT LAND USE AND ENVIRONMENTAL CONTROLS PRIOR TO

USE.

6. LOCATE ROCK CRUSHING OPERATIONS WITHIN THE WEAPONS

COMPOUND AREA TO THE MAXIMUM EXTENT PRACTICAL. SHOULD

ROCK CRUSHING OPERATIONS NOT FIT WITHIN THE ACTIVE

CONSTRUCTION WORK ZONE, COORDINATE WITH THE CONTRACTING

OFFICER TO SELECT AN ALTERNATE LOCATION.

7. LAY DOWN AREAS REQUIRE CONTRACTING OFFICER APPROVAL PRIOR

TO USE.

5/

/2

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

VI

CI

NI

TY

M

AP

H

AU

L

RO

UT

E

CI

VI

L

C-002

CONTRACTOR

HAUL ROUTE

A1 VICINITY MAP & HAUL ROUTE

1" = 100'

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

MI

D-

AT

LA

NT

IC

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N G

RO

TO

N, C

O

NN

EC

TI

CU

T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

SI

TE

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

CONTRACTOR

TRAILER LOCATION

OVERFLOW GENERAL

LAYDOWN AREA

FOUNDATIONS AND EARTHWORK

CAST-IN-PLACE CONCRETE

POST-INSTALLED ANCHORS

STEEL DECKING

1. ROOF DECK:

a. CONFORM TO THE REQUIREMENTS OF ASTM A653, Fy = 50 KSI

MIN, GALVANIZED G90.

b. STEEL ROOF DECK MUST BE 1 1/2" HIGH, 20 GAUGE. DECK

DESIGN IS BASED ON A THREE SPAN CONDITION. INCREASE

DECK THICKNESS IF LESS THAN THREE SPAN CONDITION OR

CONSTRUCTION LIVE LOAD EXCEEDS 20 PSF.

c. THE DECK MUST HAVE THE FOLLOWING MINIMUM PROPERTIES

PER FOOT WIDTH:

Ip = 0.201 IN4 In = 0.222 Sp = 0.234 IN3 Sn = 0.247 IN3

2. DECK ENDS MUST BEAR AT LEAST 1 1/2" ON STRUCTURAL SUPPORTS.

END JOINTS MUST BE BUTTED.

3. CONTINUOUS SHEET METAL CLOSURES ARE REQUIRED AT OPENINGS

AND EDGES.

4. ROOF DECK FASTENING:

a. FASTEN DECK TO EACH SUPPORT WITH 5/8" DIAMETER PUDDLE

WELDS. WELD EDGE RIBS OF PANELS AND PROVIDE ADDITIONAL

WELDS AT MAXIMUM 12" ON CENTER.

b. FASTEN SIDE LAPS WITH #10 SELF DRILLING SCREWS AT THE

LESSER OF 1/2 OF THE SPAN OR 36" ON CENTER, UON.

c. FASTEN DECK EDGES TO PERIMETER SIDE SUPPORTS WITH #10

SELF DRILLING SCREWS AT THE LESSER OF 1/2 OF THE SPAN OR

24" ON CENTER, UON.

d. SECURE DECK ACCESSORIES, SUCH AS CLOSURES AND RIDGE

PLATES IN ACCORDANCE WITH SDI STANDARD PRACTICE.

FASTENER SPACING MUST NOT EXCEED 12-INCHES.

5. LOADS HUNG FROM DECKING MUST NOT EXCEED 50 POUNDS. PIPES,

DUCTS AND EQUIPMENT BENEATH ROOF DECKS MUST BE

SUPPORTED BY THE STRUCTURAL STEEL, STEEL JOISTS OR

SUPPLEMENTARY MEMBERS THAT ARE DIRECTLY SUPPORTED BY THE

STEEL FRAMING. DESIGN AND PROVIDE SUPPLEMENTARY MEMBERS

AT NO ADDITIONAL COST.

1. FOUNDATION DESIGN IS IN ACCORDANCE WITH THE

RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEERING REPORT

PREPARED BY JACOBS, DATED 07 FEBRUARY 2025.

2. PLACE FOUNDATIONS ON UNDISTURBED, NATURAL SUBGRADE OR

BACKFILL COMPACTED TO A MINIMUM OF 95% OF THE MAXIMUM SOIL

DENSITY AS MEASURED BY ASTM D1557, MODIFIED PROCTOR TEST.

THE MINIMUM ALLOWABLE SOIL BEARING CAPACITY UNDER

FOUNDATIONS MUST BE 4,000 PSF.

3. FOR SPREAD FOOTING AND MAT FOUNDATIONS CONSTRUCTED OVER

COMPACTED NATIVE SOILS, COMPACTED APPROVED GRAVEL

BACKFILL MATERIALS, AND BEDROCK, PROVIDE A MINIMUM MODULUS

OF SUBGRADE REACTION OF 150 POUNDS PER CUBIC INCH. DESIGN

MUST MEET SPECIFIED BEARING AND SETTLEMENT CRITERIA.

4. PROVIDE MEASURES TO PREVENT WATER, FROST OR ICE FROM

PENETRATING FOOTING OR SLAB SUBGRADE BEFORE PLACING

CONCRETE. FOOTINGS, MUD SLABS, OR BUILDING SLABS MUST NOT

BE PLACED INTO OR AGAINST SUBGRADE CONTAINING FREE WATER,

FROST, OR ICE.

5. CONCRETE FOUNDATIONS OR A 3" THICK CONCRETE MUD MAT (LEAN

CONCRETE) MUST BE PLACED THE SAME DAY THE SUBGRADE IS

INSPECTED. IF THE GROUND SURFACE IS DISTURBED BEFORE

CONCRETE IS PLACED, THE SUBGRADE MUST BE RE-INSPECTED BY

THE CONTRACTOR'S GEOTECHNICAL ENGINEER AT NO ADDITIONAL

COST.

6. DESIGN, PROVIDE AND MAINTAIN DEWATERING SYSTEMS, EARTH

RETENTION SYSTEMS, AND BRACING. PROTECT EXISTING

STRUCTURES AND UTILITIES DURING CONSTRUCTION.

7. WHEN FILLING AGAINST OPPOSITE SIDES OF A WALL OR STRUCTURE,

BACKFILL IN LIFTS THAT MAINTAIN LEVEL ELEVATIONS WITHIN 12" ON

BOTH SIDES TO BALANCE THE LATERAL PRESSURE.

8. EARTHWORK, INCLUDING FOUNDATION SUBGRADE, FILL AND

BACKFILL MUST BE INSPECTED AND APPROVED BY THE

CONTRACTOR'S GEOTECHNICAL ENGINEER.

9. WHERE EXCAVATION WOULD BE BELOW A LINE EXTENDING UPWARD

AT A 1.0 H TO 1.0 V SLOPE FROM THE BOTTOM OF A FOUNDATION OR

UTILITY, PROVIDE SHEETING, SHORING, AND BRACING. DO NOT

UNDERMINE EXISTING CONSTRUCTION.

1. PROVIDE CAST-IN-PLACE CONCRETE FOR EACH CLASS OF CONCRETE

SHOWN IN TABLE 2 - CONCRETE MATERIAL SCHEDULE.

2. CONCRETE REINFORCING:

a. TYPICAL DEFORMED BARS - ASTM A615, GRADE 60

b. WELDED DEFORMED BAR ANCHORS - ASTM A706, GRADE 70

c. PLAIN WELDED WIRE - ASTM A1064,GRADE 65, SUPPLIED IN FLAT

SHEETS

3. CONCRETE COVER OVER STEEL REINFORCING, UON:

a. REINFORCING IN CONCRETE CAST AGAINST & PERMANENTLY IN

CONTACT WITH GROUND - 3"

b. REINFORCING IN CONCRETE EXPOSED TO WEATHER OR IN

CONTACT WITH GROUND AFTER CONCRETE PLACEMENT,

INCLUDING ELEMENTS COVERED BY WATERPROOFING OR

DAMPPROOFING

• PRIMARY REINFORCING - 2"

• STIRRUPS AND TIES - 1 1/2"

c. REINFORCING IN CONCRETE SLABS AND WALLS NOT EXPOSED

TO WEATHER OR IN CONTACT WITH GROUND - 3/4"

d. REINFORCING IN CONCRETE BEAMS, GIRDERS, COLUMNS AND

PEDESTALS NOT EXPOSED TO WEATHER OR IN CONTACT WITH

GROUND, COVER TO - 1 1/2"

4. REFER TO TABLE 3 - CONCRETE REINFORCEMENT TENSION

DEVELOPMENT LENGTHS FOR Ld.

5. SPLICE REINFORCING BARS PER ACI 318 WITH CLASS B TENSION LAP

SPLICES (1.3 TIMES THE DEVELOPMENT LENGTH)

6. LAP SPLICE WWR SHEETS AT LEAST 8" AND TIE SECURELY.

7. DOWELS MUST MATCH SIZE AND SPACING AND BE CLASS B TENSION

LAP SPLICED WITH THE MAIN REINFORCEMENT, UON.

8. FIELD BENDING OF REINFORCEMENT IS NOT PERMITTED UNLESS

INDICATED ON THE DRAWINGS OR APPROVED IN WRITING BY THE

COR. DO NOT HEAT REBAR WITH A TORCH IN THE FIELD.

9. EXCEPT FOR WELDED DEFORMED BAR ANCHORS, DO NOT WELD

REINFORCING.

10. WIRE BRUSH, CLEAN, AND COAT CONSTRUCTION JOINTS WITH A

BONDING AGENT OR MOISTEN WITH A CEMENT SLURRY SCRUBBED

INTO THE JOINT IMMEDIATELY PRIOR TO PLACING FRESH CONCRETE.

11. CHAMFER EXPOSED CORNERS 3/4", UON.

STRUCTURAL & MISCELLANEOUS STEEL

1. STRUCTURAL STEEL MUST CONFORM TO THE FOLLOWING, UON:

a. W & WT SHAPES ASTM A992

b. ANGLES & CHANNELS ASTM 572, GR 50

c. PLATES & BARS ASTM 572, GR 50

d. HSS ASTM A500, GRADE C

e. ANCHOR RODS ASTM F1554, GRADE 36

f. HIGH STRENGTH BOLTS ASTM F3125, GRADE A325

g. TENSION-CONTROL HS BOLTS ASTM F3125, GRADE F1852, TYPE 1

h. DIRECT TENSION INDICATORS ASTM F959, TYPE 325-1

i. COMMON GRADE BOLTS ASTM A307, GRADE A

j. WELDING ELECTRODES E70xx

2. GROUT UNDER STEEL BEARING PLATES MUST HAVE A MINIMUM 28

DAY COMPRESSIVE STRENGTH OF 7,000 PSI.

3. FILLET WELDS MUST HAVE A MINIMUM SIZE OF 1/4", UON. INCREASE

THE EFFECTIVE THROAT OF THE WELD TO MAINTAIN THE WELD SIZE

WHEN PARTS JOINED BY FILLET WELDS ARE SEPARATED. THE ROOT

OPENING MUST NOT EXCEED 3/16".

4. BOLTED CONNECTIONS MUST HAVE A MINIMUM OF (2) 3/4" DIAMETER

HIGH STRENGTH BOLTS.

5. MEMBERS EXPOSED TO WEATHER MUST BE HOT DIPPED

GALVANIZED.

6. PROVIDE ZINC COATED (GALVANIZED) BOLTS, NUTS, AND WASHERS

TO CONNECT GALVANIZED STEEL MEMBERS.

7. HIGH STRENGTH BOLTED CONNECTIONS MUST BE PRETENSIONED.

CONNECTIONS THAT USE OVERSIZE HOLES OR SLOTTED HOLES IN

THE DIRECTION OF THE LOAD MUST BE SLIP CRITICAL.

8. PROVIDE STEEL TO STEEL CONNECTIONS IN ACCORDANCE WITH AISC

360-16. CONNECTIONS NOT SPECIFICALLY DETAILED ON THE

DRAWINGS MUST BE DESIGNED BASED ON A BEAM END REACTION

OBTAINED FROM THE MAXIMUM UNIFORM LOAD TABLES IN PART 3

(DESIGN OF FLEXURAL MEMBERS). THE END REACTION IS EQUAL TO

1/2 THE TOTAL ALLOWABLE LOAD FOR THE GIVEN BEAM, SPAN AND

GRADE OF STEEL SPECIFIED. DETAILED CONNECTIONS ON THE

DRAWINGS SUPERCEDE THIS NOTE.

9. DO NOT FIELD CUT STRUCTURAL STEEL MEMBERS WITHOUT THE

WRITTEN APPROVAL OF THE COR.

10. DO NOT SPLICE STEEL MEMBERS EXCEPT WHERE SPECIFICALLY

DETAILED ON THE DRAWINGS.

11. PROVIDE TEMPORARY SHORING AND BRACING UNTIL THE

STRUCTURE IS ALIGNED AND PERMANENT CONNECTIONS HAVE BEEN

COMPLETED.

1. ANCHORS AND INSERTS EXPOSED TO EARTH OR WEATHER MUST BE

STAINLESS STEEL, UON. AT OTHER LOCATIONS PROVIDE

GALVANIZED ANCHORS IN ACCORDANCE WITH ASTM A153.

EMBEDDED DEFORMED REINFORCING BARS MUST BE UNCOATED

STEEL.

2. PROVIDE TYPE & SIZE AS INDICATED & EMBED INTO THE EXISTING

CONCRETE AS SHOWN IN TABLE 4 - POST-INSTALLED ANCHOR

SCHEDULE. VERIFY MINIMUM EFFECTIVE EMBEDDMENT DEPTH WITH

THE ANCHOR MANUFACTURER.

3. EXPANSION ANCHORS MUST BE WEDGE TYPE, TORQUE

CONTROLLED.

4. ADHESIVE ANCHORS MUST CONSIST OF AN INSERT AND CARTRIDGE

TYPE, TWO COMPONENT, EPOXY OR HYBRID ADHESIVE DISPENSED

AND MIXED THROUGH A STATIC MIXING NOZZLE PROVIDED BY THE

ADHESIVE MANUFACTURER.

5. ANCHORING TO CONCRETE:

a. MECHANICAL ANCHORS USED IN CONCRETE MUST HAVE BEEN

TESTED AND QUALIFIED FOR PERFORMANCE IN CRACKED AND

UNCRACKED CONCRETE IN ACCORDANCE WITH ACI 355.2.

b. ADHESIVE ANCHORS MUST HAVE BEEN TESTED AND QUALIFIED

FOR PERFORMANCE IN CRACKED AND UNCRACKED CONCRETE,

INCLUDING HORIZONTAL AND OVERHEAD INSTALLATIONS, AND

LONG TERM CREEP IN ACCORDANCE WITH ACI 355.4.

6. IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED

ITEMS PRIOR TO DRILLING HOLES FOR ANCHORS. EXERCISE CARE IN

DRILLING TO AVOID DAMAGING EXISTING REINFORCING OR

EMBEDDED ITEMS. NOTIFY THE COR IF REINFORCING STEEL OR

OTHER EMBEDDED ITEMS ARE ENCOUNTERED DURING DRILLING.

7. PROVIDE ANCHORS IN DRY HAMMER DRILLED HOLES IN ACCORDANCE

WITH MANUFACTURER’S PRINTED INSTRUCTIONS.

1. MAXIMUM SLUMP OF CONCRETE AT POINT OF PLACEMENT - WITHOUT / WITH HIGH-RANGE WATER-REDUCING ADMIXTURE

2. REFER TO CIVIL FOR CONCRETE SITE WALLS

TABLE 2 - CONCRETE MATERIAL SCHEDULE (NORMAL WEIGHT)

ELEMENT ASTM C33

AGGREGATE

CLASS

MAXIMUM

CHLORIDE

CONTENT

DRY UNIT

WEIGHT

MAX

AGGREGATE

SIZE

SLUMP

(NOTE 1)

AIR

CONTENT

FOUNDATIONS 145 PCF 3/4" 4"/8" 0.15%5%

MAX W/CM

RATIO

4,500 PSI 0.45 4S

0.55INTERIOR SOG 4,000 PSI 1 1/2" 4S 3% MAX 4"/8" 0.15%

1. TOP BARS ARE DEFINED AS HORIZONTAL REINFORCING WHERE MORE THAN 12" OF FRESH CONCRETE IS

CAST BENEATH THE BAR.

2. Ld = THE STRAIGHT BAR DEVELOPMENT LENGTH

3. Ldh = THE HOOKED BAR DEVELOPMENT LENGTH

4. CASE 1: CLEAR SPACING OF BARS DEVELOPED OR SPLICED NOT LESS THAN db, CLEAR COVER NOT LESS

THAN db, AND STIRRUPS OR TIES THROUGHOUT Ld NOT LESS THAN THE CODE MINIMUM OR CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN 2*db AND CLEAR COVER NOT LESS THAN db

5. CASE 2: REINFORCING BARS THAT DO NOT MEET THE REQUIREMENTS OF CASE 1

6. DEVELOPMENT LENGTHS ONLY APPLY TO THE OPPERATIONS AND SENTRY CONSTRUCTION.

TABLE 3 - CONCRETE REINF TENSION DEVELOPMENT LENGTHS (INCHES)

BAR

SIZE

#3

#4

#5

#6

TOP BARS OTHER BARS

UNCOATED BARS

4,000 PSI

f'c

145 PCF

Ld Ldh

HOOKED

BARS

LEAN CONCRETE FILL --------1,000 PSI 3/4" 4S -------- -------- 0.15%145 PCF

0.55ARMS ROOM ROOF & WALLS 4,000 PSI 3/4" 4S 4"/8" 0.15%145 PCF

CASE 1 CASE 2 CASE 1 CASE 2

UNCOATED BARS

4,500 PSI

14 7

CRITICAL SECTION

Ld

Ldh

TABLE 4 - POST-INSTALLED ANCHOR SCHEDULE

ANCHORING TO NORMAL WEIGHT CONCRETE

ANCHOR TYPE ANCHOR DIAMETER/

REBAR SIZE

MINIMUM EFFECTIVE

EMBEDMENT, UON

MECHANICAL 5/8" 4"

1/2" 3 1/4"

3/4" 4 3/4"

2 3/4"

3/4"

1/2"

4"

ADHESIVE

TOP BARS OTHER BARS

Ld Ldh

HOOKED

BARSCASE 1 CASE 2 CASE 1 CASE 2

OPEN WEB STEEL JOISTS

1. JOIST DESIGN, FABRICATION, AND ERECTION OF OPEN WEB STEEL

JOISTS MUST BE PERFORMED IN ACCORDANCE WITH THE STEEL

JOIST INSTITUTE, LATEST EDITION.

2. ALL BRIDGING, INCLUDING SIZING, SPACING CONNECTIONS, MUST BE

DESIGNED BY JOIST DESIGNER IN ACCORDANCE WITH STEEL JOIST

INSTITUTE REQUIREMENTS TO RESIST UPLIFT LOADING INDICATED

ON DRAWINGS.

3. REFER TO S-102 FOR JOIST LAYOUT AND SHEET S-601

LOADING/DEPTH REQUIREMENTS TO BE USED IN DESIGN OF THE

DELEGATED OPEN WEB STEEL JOISTS.

4. REFER TO S-505 FOR TYPICAL JOIST DETAILS INCLUDING END

CONNECTION INFORMATION AND CHORD REINFORCEMENT

REQUIREMENTS AT CONCENTRATED LOADING.

5. DO NOT CUT HOLES OR NOTCHES IN CHORD AND WEB MEMBERS,

UNLESS APPROVED BY JOIST DESIGNER AND COR.

6. DO NOT APPLY TEMPORARY OR PERMANENT LOADS TO JOIST

BRIDGING.

7. SHOP DRAWINGS FOR JOISTS AND JOIST ACCESSORIES TO BE

PREPARED BY THE JOIST MANUFACTURER'S DETAILS.

8. SUBMIT DESIGN CALCULATIONS FOR REVIEW IN ACCORDANCE WITH

THE STEEL JOIST INSTITUTE DESIGN STANDARDS. SUBMIT DESIGN

CALCUALTIONS SIGNED AND SEALED BY A PROFESSIONAL LICENSED

ENGINEER IN THE STATE WHERE THE PROJECT IS LOCATED.

0.45OTHER WALLS 4,000 PSI 3/4" 4S 4"/8" 0.15%145 PCF

3% MAX

ULTIMATE DESIGN

SHEAR CAPACITY (KIP)

ULTIMATE DESIGN

TENSILE CAPACITY (KIP)

8.4 4.4

13.1 6.6

19 8.9

8.6 3.5

20.4 8.3

5%

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

5/

/2

3:

:3

PM

C :\U se rs

\w oo dc j\D oc um en ts

\B

LD

G -1

-S

-B

IM

_v

_c w oo d5

8.

rv t

S-003

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

M

AT

ER

IA

L

NO

TE

S

LP

12893958

JH JT

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTON, CT

O

PE

RA

TI

O

NS

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

AN

TI

C

S-

3 NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

AV

AL

S

TA

TI

O

N

N O

R

FO

LK

, V

A

SY

M

DE

SC

R I

PT

IO

N

DA

TE

AP

PR

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

/19 /20

05/19/26

FOUNDATIONS AND EARTHWORK

CAST-IN-PLACE CONCRETE

POST-INSTALLED ANCHORS

STEEL DECKING

1. COMPOSITE DECK:

a. CONFORM TO THE REQUIREMENTS OF ASTM A653, Fy = 50 KSI

MIN, GALVANIZED G90.

b. STEEL ROOF DECK MUST BE 1 1/2" HIGH, 20 GAUGE. DECK IS

DESIGNED BASED ON UNSHORED CONSTRUCTION FOR A TWO

SPAN CONDITION. INCREASE DECK THICKNESS OR PROVIDE

TEMPORARY SHORING IF LESS THAN TWO SPAN CONDITION OR

CONSTRUCTION LIVE LOAD EXCEEDS 20 PSF.

c. THE STEEL ROOF DECK MUST HAVE THE FOLLOWING MINIMUM

PROPERTIES PER FOOT WIDTH:

Ip = 0.182 IN4 Sp = 0.218 IN3 Sn = 0.226 IN3

2. DECK ENDS MUST BEAR AT LEAST 1 1/2" ON STRUCTURAL SUPPORTS.

END JOINTS MUST BE BUTTED.

3. CONTINUOUS SHEET METAL CLOSURES ARE REQUIRED AT SLAB

OPENINGS AND EDGES.

4. COMPOSITE DECK FASTENING:

a. FASTEN DECK TO EACH SUPPORT WITH 5/8" DIAMETER PUDDLE

WELDS. WELD EDGE RIBS OF PANELS AND PROVIDE ADDITIONAL

WELDS AT MAXIMUM 12" ON CENTER.

b. FASTEN SIDE LAPS WITH #10 SELF DRILLING SCREWS AT THE

LESSER OF 1/2 OF THE SPAN OR 36" ON CENTER, UON.

c. FASTEN PERIMETER EDGES TO SIDE SUPPORTS WITH #10 SELF

DRILLING SCREWS AT THE LESSER OF 1/2 OF THE SPAN OR 24"

ON CENTER, UON.

d. SECURE POUR STOPS, BEAM FILLERS & DECK CLOSURES IN

ACCORDANCE WITH SDI STANDARD PRACTICE REQUIREMENTS.

5. LOADS HUNG FROM CEILING DECKING MUST NOT EXCEED 50 POUNDS.

DUCTS & PIPES LESS THAN 12 INCHES DIAMETER MAY BE HUNG

DIRECTLY FROM ANCHORS CAST OR POST-INSTALLED IN THE

CONCRETE SLAB OF COMPOSITE DECKS. PIPES, DUCTS AND

EQUIPMENT BENEATH ROOF DECKS AND PIPES AND DUCTS LARGER

THAN 12" BENEATH COMPOSITE CONCRETE AND STEEL DECK SLABS

MUST BE SUPPORTED BY THE STRUCTURAL STEEL FRAME OR

SUPPLEMENTARY MEMBERS THAT ARE DIRECTLY SUPPORTED BY THE

STRUCTURAL STEEL FRAMING. DESIGN AND PROVIDE

SUPPLEMENTARY MEMBERS AT NO ADDITIONAL COST.

1. FOUNDATION DESIGN IS IN ACCORDANCE WITH THE

RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEERING REPORT

PREPARED BY JACOBS, DATED 07 FEBRUARY 2025.

2. PLACE FOUNDATIONS ON REINFORCED AND COMPACTED

ENGINEERED FILL OVER CEMENTITIOUS RIGID INCLUSIONS (GROUND

IMPROVEMENT SYSTEM), REFER TO CIVIL PLANS SHEET B-101,

GROUND IMPROVEMENT PLANS FOR ADDITIONAL REQUIREMENTS.

GROUND IMPROVEMENT SYSTEM MUST CREATE A FOUNDATION

SUBGRADE WITH THE MINIMUM BEARING CAPACITY AS NOTED ON

S-002 AND A MAXIMUM ALLOWABLE SETTLEMENT OF 3/4 INCH.

3. FOR SPREAD FOOTING AND MAT FOUNDATIONS CONSTRUCTED OVER

COMPACTED NATIVE SOILS, COMPACTED APPROVED GRAVEL

BACKFILL MATERIALS, AND BEDROCK, PROVIDE A MINIMUM MODULUS

OF SUBGRADE REACTION OF 150 POUNDS PER CUBIC INCH. DESIGN

MUST MEET SPECIFIED BEARING AND SETTLEMENT CRITERIA.

4. PROVIDE MEASURES TO PREVENT WATER, FROST OR ICE FROM

PENETRATING FOOTING OR SLAB SUBGRADE BEFORE PLACING

CONCRETE. FOOTINGS, MUD SLABS, OR BUILDING SLABS MUST NOT

BE PLACED INTO OR AGAINST SUBGRADE CONTAINING FREE WATER,

FROST, OR ICE.

5. CONCRETE FOUNDATIONS OR A 3" THICK CONCRETE MUD MAT (LEAN

CONCRETE) MUST BE PLACED THE SAME DAY THE SUBGRADE IS

INSPECTED. IF THE GROUND SURFACE IS DISTURBED BEFORE

CONCRETE IS PLACED, THE SUBGRADE MUST BE RE-INSPECTED BY

THE CONTRACTOR'S GEOTECHNICAL ENGINEER AT NO ADDITIONAL

COST.

6. DESIGN, PROVIDE AND MAINTAIN DEWATERING SYSTEMS, EARTH

RETENTION SYSTEMS, BRACING. PROTECT EXISTING STRUCTURES

AND UTILITIES DURING CONSTRUCTION.

7. WHEN FILLING AGAINST OPPOSITE SIDES OF A WALL OR STRUCTURE,

BACKFILL IN LIFTS THAT MAINTAIN LEVEL ELEVATIONS WITHIN 12" ON

BOTH SIDES TO BALANCE THE LATERAL PRESSURE.

8. EARTHWORK, INCLUDING FOUNDATION SUBGRADE, FILL AND

BACKFILL MUST BE INSPECTED AND APPROVED BY THE

CONTRACTOR'S GEOTECHNICAL ENGINEER.

9. WHERE EXCAVATION WOULD BE BELOW A LINE EXTENDING UPWARD

AT A 1.0 H TO 1.0 V SLOPE FROM THE BOTTOM OF A FOUNDATION OR

UTILITY, PROVIDE SHEETING, SHORING, AND BRACING. DO NOT

UNDERMINE EXISTING CONSTRUCTION.

1. PROVIDE CAST-IN-PLACE CONCRETE FOR EACH CLASS OF CONCRETE

SHOWN IN TABLE 2 - CONCRETE MATERIAL SCHEDULE.

2. CONCRETE REINFORCING:

a. TYPICAL DEFORMED BARS - ASTM A615, GRADE 60

b. WELDED DEFORMED BAR ANCHORS - ASTM A706, GRADE 70

c. PLAIN WELDED WIRE - ASTM A1064, GRADE 65, SUPPLIED IN FLAT

SHEETS

3. CONCRETE COVER OVER STEEL REINFORCING, UON:

a. REINFORCING IN CONCRETE CAST AGAINST & PERMANENTLY IN

CONTACT WITH GROUND - 3"

b. REINFORCING IN CONCRETE EXPOSED TO WEATHER OR IN

CONTACT WITH GROUND AFTER CONCRETE PLACEMENT,

INCLUDING ELEMENTS COVERED BY WATERPROOFING OR

DAMPPROOFING

• PRIMARY REINFORCING - 2"

• STIRRUPS AND TIES - 1 1/2"

c. REINFORCING IN CONCRETE SLABS AND WALLS NOT EXPOSED

TO WEATHER OR IN CONTACT WITH GROUND - 3/4"

d. REINFORCING IN CONCRETE BEAMS, GIRDERS, COLUMNS AND

PEDESTALS NOT EXPOSED TO WEATHER OR IN CONTACT WITH

GROUND, COVER TO - 1 1/2"

4. REFER TO TABLE 3 - CONCRETE REINFORCEMENT TENSION

DEVELOPMENT LENGTHS FOR Ld.

5. SPLICE REINFORCING BARS PER ACI 318 WITH CLASS B TENSION LAP

SPLICES (1.3 TIMES THE DEVELOPMENT LENGTH)

6. LAP SPLICE WWR SHEETS AT LEAST 8" AND TIE SECURELY.

7. DOWELS MUST MATCH SIZE AND SPACING AND BE CLASS B TENSION

LAP SPLICED WITH THE MAIN REINFORCEMENT, UON.

8. FIELD BENDING OF REINFORCEMENT IS NOT PERMITTED UNLESS

INDICATED ON THE DRAWINGS OR APPROVED IN WRITING BY THE

COR. DO NOT HEAT REBAR WITH A TORCH IN THE FIELD.

9. EXCEPT FOR WELDED DEFORMED BAR ANCHORS, DO NOT WELD

REINFORCING.

10. WIRE BRUSH, CLEAN, AND COAT CONSTRUCTION JOINTS WITH A

BONDING AGENT OR MOISTEN WITH A CEMENT SLURRY SCRUBBED

INTO THE JOINT IMMEDIATELY PRIOR TO PLACING FRESH CONCRETE.

11. CHAMFER EXPOSED CORNERS 3/4", UON.

STRUCTURAL & MISCELLANEOUS STEEL

1. STRUCTURAL STEEL MUST CONFORM TO THE FOLLOWING, UON:

a. W & WT SHAPES ASTM A992

b. ANGLES & CHANNELS ASTM 572, GR 50

c. PLATES & BARS ASTM 572. GR 50

d. HSS ASTM A500, GRADE C

e. ANCHOR RODS ASTM F1554, GRADE 36

f. HIGH STRENGTH BOLTS ASTM F3125, GRADE A325

g. TENSION-CONTROL HS BOLTS ASTM F3125, GRADE F1852, TYPE 1

h. DIRECT TENSION INDICATORS ASTM F959, TYPE 325-1

i. COMMON GRADE BOLTS ASTM A307, GRADE A

j. WELDING ELECTRODES E70xx

2. GROUT UNDER STEEL BEARING PLATES MUST HAVE A MINIMUM 28

DAY COMPRESSIVE STRENGTH OF 7,000 PSI.

3. FILLET WELDS MUST HAVE A MINIMUM SIZE OF 1/4", UON. INCREASE

THE EFFECTIVE THROAT OF THE WELD TO MAINTAIN THE WELD SIZE

WHEN PARTS JOINED BY FILLET WELDS ARE SEPARATED. THE ROOT

OPENING MUST NOT EXCEED 3/16".

4. BOLTED CONNECTIONS MUST HAVE A MINIMUM OF (2) 3/4" DIAMETER

HIGH STRENGTH BOLTS.

5. MEMBERS EXPOSED TO WEATHER MUST BE HOT DIPPED

GALVANIZED.

6. PROVIDE ZINC COATED (GALVANIZED) BOLTS, NUTS, AND WASHERS

TO CONNECT GALVANIZED STEEL MEMBERS.

7. HIGH STRENGTH BOLTED CONNECTIONS MUST BE PRETENSIONED.

CONNECTIONS THAT USE OVERSIZE HOLES OR SLOTTED HOLES IN

THE DIRECTION OF THE LOAD MUST BE SLIP CRITICAL.

8. PROVIDE STEEL TO STEEL CONNECTIONS IN ACCORDANCE WITH AISC

360-16. CONNECTIONS NOT SPECIFICALLY DETAILED ON THE

DRAWINGS MUST BE DESIGNED BASED ON A BEAM END REACTION

OBTAINED FROM THE MAXIMUM UNIFORM LOAD TABLES IN PART 3

(DESIGN OF FLEXURAL MEMBERS). THE END REACTION IS EQUAL TO

1/2 THE TOTAL ALLOWABLE LOAD FOR THE GIVEN BEAM, SPAN AND

GRADE OF STEEL SPECIFIED. DETAILED CONNECTIONS ON THE

DRAWINGS SUPERCEDE THIS NOTE.

9. DO NOT FIELD CUT STRUCTURAL STEEL MEMBERS WITHOUT THE

WRITTEN APPROVAL OF THE COR.

10. DO NOT SPLICE STEEL MEMBERS EXCEPT WHERE SPECIFICALLY

DETAILED ON THE DRAWINGS.

11. PROVIDE TEMPORARY SHORING AND BRACING UNTIL THE

STRUCTURE IS ALIGNED AND PERMANENT CONNECTIONS HAVE BEEN

COMPLETED.

1. ANCHORS AND INSERTS EXPOSED TO EARTH OR WEATHER MUST BE

STAINLESS STEEL, UON. AT OTHER LOCATIONS PROVIDE

GALVANIZED ANCHORS IN ACCORDANCE WITH ASTM A153.

EMBEDDED DEFORMED REINFORCING BARS MUST BE UNCOATED

STEEL.

2. PROVIDE TYPE & SIZE AS INDICATED & EMBED INTO THE EXISTING

CONCRETE AS SHOWN IN TABLE 4 - POST-INSTALLED ANCHOR

SCHEDULE. VERIFY MINIMUM EFFECTIVE EMBEDDMENT DEPTH WITH

THE ANCHOR MANUFACTURER.

3. EXPANSION ANCHORS MUST BE WEDGE TYPE, TORQUE

CONTROLLED.

4. ADHESIVE ANCHORS MUST CONSIST OF AN INSERT AND CARTRIDGE

TYPE, TWO COMPONENT, EPOXY OR HYBRID ADHESIVE DISPENSED

AND MIXED THROUGH A STATIC MIXING NOZZLE PROVIDED BY THE

ADHESIVE MANUFACTURER.

5. ANCHORING TO CONCRETE:

a. MECHANICAL ANCHORS USED IN CONCRETE MUST HAVE BEEN

TESTED AND QUALIFIED FOR PERFORMANCE IN CRACKED AND

UNCRACKED CONCRETE IN ACCORDANCE WITH ACI 355.2.

b. ADHESIVE ANCHORS MUST HAVE BEEN TESTED AND QUALIFIED

FOR PERFORMANCE IN CRACKED AND UNCRACKED CONCRETE,

INCLUDING HORIZONTAL AND OVERHEAD INSTALLATIONS, AND

LONG TERM CREEP IN ACCORDANCE WITH ACI 355.4.

6. IDENTIFY POSITION OF REINFORCING STEEL AND OTHER EMBEDDED

ITEMS PRIOR TO DRILLING HOLES FOR ANCHORS. EXERCISE CARE IN

DRILLING TO AVOID DAMAGING EXISTING REINFORCING OR

EMBEDDED ITEMS. NOTIFY THE COR IF REINFORCING STEEL OR

OTHER EMBEDDED ITEMS ARE ENCOUNTERED DURING DRILLING.

7. PROVIDE ANCHORS IN DRY HAMMER DRILLED HOLES IN ACCORDANCE

WITH MANUFACTURER’S PRINTED INSTRUCTIONS.

1. MAXIMUM SLUMP OF CONCRETE AT POINT OF PLACEMENT - WITHOUT / WITH HIGH-RANGE WATER-REDUCING ADMIXTURE

2. REFER TO CIVIL FOR CONCRETE SITE WALLS

TABLE 2 - CONCRETE MATERIAL SCHEDULE (NORMAL WEIGHT)

ELEMENT ASTM C33

AGGREGATE

CLASS

MAXIMUM

CHLORIDE

CONTENT

DRY UNIT

WEIGHT

MAX

AGGREGATE

SIZE

SLUMP

(NOTE 1)

AIR

CONTENT

FOUNDATIONS 145 PCF 3/4" 4"/8" 0.15%

MAX W/CM

RATIO

4,500 PSI 0.45 4S

0.55INTERIOR SOG 4,000 PSI 1 1/2" 4S 3% MAX 4"/8" 0.15%

1. TOP BARS ARE DEFINED AS HORIZONTAL REINFORCING WHERE MORE THAN 12" OF FRESH CONCRETE IS

CAST BENEATH THE BAR.

2. Ld = THE STRAIGHT BAR DEVELOPMENT LENGTH

3. Ldh = THE HOOKED BAR DEVELOPMENT LENGTH

4. CASE 1: CLEAR SPACING OF BARS DEVELOPED OR SPLICED NOT LESS THAN db, CLEAR COVER NOT LESS

THAN db, AND STIRRUPS OR TIES THROUGHOUT Ld NOT LESS THAN THE CODE MINIMUM OR CLEAR SPACING OF BARS BEING DEVELOPED OR SPLICED NOT LESS THAN 2*db AND CLEAR COVER NOT LESS THAN db

5. CASE 2: REINFORCING BARS THAT DO NOT MEET THE REQUIREMENTS OF CASE 1

6. DEVELOPMENT LENGTHS ONLY APPLY TO THE OPPERATIONS AND SENTRY CONSTRUCTION.

TABLE 3 - CONCRETE REINF TENSION DEVELOPMENT LENGTHS (INCHES)

BAR

SIZE

#3

#4

#5

#6

TOP BARS OTHER BARS

UNCOATED BARS

4,000 PSI

f'c

145 PCF

Ld Ldh

HOOKED

BARS

LEAN CONCRETE FILL --------1,000 PSI 3/4" 4S -------- -------- 0.15%145 PCF

0.55CONCRETE ON STEEL DECK 4,000 PSI 3/4" 4S 6% 4"/8" 0.15%145 PCF

CASE 1 CASE 2 CASE 1 CASE 2

CRITICAL SECTION

Ld

Ldh

5%

TABLE 4 - POST-INSTALLED ANCHOR SCHEDULE

ANCHORING TO NORMAL WEIGHT CONCRETE

ANCHOR TYPE ANCHOR DIAMETER/

REBAR SIZE

MINIMUM EFFECTIVE

EMBEDMENT, UON

MECHANICAL 5/8" 4"

1/2" 3 1/4"

3/4" 4 3/4"

2 3/4"

3/4"

1/2"

4"

ADHESIVE

ULTIMATE DESIGN

SHEAR CAPACITY (KIP)

ULTIMATE DESIGN

TENSILE CAPACITY (KIP)

8.4 4.4

13.1 6.6

19 8.9

8.6 3.5

20.4 8.3

4,000 PSIWALLS 0.45 145 PCF 3/4" 4S 5% 4"/8" 0.15%

UNCOATED BARS

4,500 PSI

14 7

TOP BARS OTHER BARS

Ld Ldh

HOOKED

BARSCASE 1 CASE 2 CASE 1 CASE 2

SATISFACTORY TO DATE

APPROVED

ACTIVITY

FOR COMMANDER NAVFAC

SEAL

A/E INFO

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

DES DRW CHK

OF

EPROJECT NO.:

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G S

YS

TE

M S

C O

M M

AN

D

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

AS NOTED

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

FAX: 571.218.1600

5/

/2

3:

:1

PM

C :\U se rs

\w oo dc j\D oc um en ts

\B

LD

G -1

-S

-B

IM

_v

_S

EN

TR

Y_ cw oo d5

8.

rv t

S-003

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

F

AC

ILI

TY

M

AT

ER

IA

L

NO

TE

S

LP

12894093

JH JT

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLON FEAD

DIRECTOR NEW LONDON, GROTON, CT

SE

NT

RY

SMS/CWJ

1667770

GR

OT

ON

, C

ON

NE

CT

IC

UT

NA

VA

L S

UB

MA

RI

NE

B

AS

E

NE

W

LO

ND

ON

JWJ

NEK

HPN

M

ID

-A

TL

AN

TI

C

S-

3 NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

-M

ID

-A

TL

AN

TI

C N

AV

AL

S

TA

TI

O

N

N O

R

FO

LK

, V

A

SY

M

DE

SC

R I

PT

IO

N

DA

TE

AP

PR

RE

VI

SI

ON

S

FO

R

AM

EN

DM

EN

T

/19 /20

TC

SD

B

C

J

J

CS

HS

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

ELECTRICAL HEAT TRACE PLAN

A1

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D E

P A

R T

M E

N T

O

F

T

H E

A V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M S

C

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C M

I D

A

T L A

N T

I C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N A

V A

L

S

U B

M A

R I N

E

B

A S

E

N

W

L

N

D O

N G

R O

T O

N

C

O N

N E

C T

I C

U T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

TY

PE

G M

AG

AZ

IN

E

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

E-801S

WRB

SHEET NOTES

12894235

HTLA OE F

W V

N IRO G

M IN

M IAO

C

KELLEY BOURASSA

Lic. No. 0402061759

5/19/2026

TY101S

0 8' 32'16'

TELECOMMUNICATION FLOOR PLAN

A1

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

MI

D-

AT

LA

NT

IC

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N G

RO

TO

N, C

O

NN

EC

TI

CU

T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

TY

PE

G M

AG

AZ

IN

E

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

R

EV

IS

IO

N

S

FO

R A

M

EN

D M

EN

T

5/

/2

SHEET NOTES

KEYED NOTES

LEGEND

ABBREVIATIONS

THESE DRAWINGS HAVE BEEN ADAPTED FROM APPROVED NAVFAC MUNITIONS STORAGE

CONSTRUCTION DOCUMENTS, NAVFAC DRAWING NUMBERS 14145735 TO 14145738,

APPROVED BY DDESB ON 24 SEPTEMBER 2024. JACOBS DOR RESPONSIBILITY AND SEAL

APPLICABILITY IS LIMITED TO THE SITE ADAPTATIONS AND MODIFICATIONS MADE TO THIS

DRAWING.

AutoCAD SHX Text A

AutoCAD SHX Text B

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text K

AutoCAD SHX Text

IDS

AutoCAD SHX Text

IT

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

DC

AutoCAD SHX Text

DC

AutoCAD SHX Text

DC

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

ILD

AutoCAD SHX Text

ILD

AutoCAD SHX Text

ILD

AutoCAD SHX Text J

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

1. ALL CONDUIT MUST BE RIGID GALVANIZED STEEL CONDUIT UNLESS ALL CONDUIT MUST BE RIGID GALVANIZED STEEL CONDUIT UNLESS INDICATED OTHERWISE. 2. EXPOSED CONDUITS ON EXTERIOR WALLS MUST BE PROHIBITED. EXPOSED CONDUITS ON EXTERIOR WALLS MUST BE PROHIBITED. 3. PROPOSED IDS VENDOR TO PERFORM COVERAGE CALCULATIONS, PROPOSED IDS VENDOR TO PERFORM COVERAGE CALCULATIONS, INCLUDING OBSTRUCTIONS, TO VERIFY QUANTITY AND LOCATION OF MOTION DETECTORS. FINAL LOCATIONS AND QUANTITIES OF MOTION DETECTORS TO BE INSTALLED PER IDS VENDOR SHOP DRAWINGS. 4. ALL CONDUITS WILL BE MINIMUM 1"C UNLESS NOTED OTHERWISE. ALL CONDUITS WILL BE MINIMUM 1"C UNLESS NOTED OTHERWISE. REFER TO T-601 FOR CONDUIT SIZES. 5. CONDUITS WILL BE EXPOSED INSIDE THE MAGAZINE UNLESS CONDUITS WILL BE EXPOSED INSIDE THE MAGAZINE UNLESS INDICATED OTHERWISE. LOCATE CONDUITS AS HIGH AS POSSIBLE AND COORDINATE ROUTING WITH OTHER TRADES. JUNCTION BOXES WILL BE SURFACE MOUNTED.

AutoCAD SHX Text

1. DOOR CONTACT FOR ECM DOOR. COORDINATE WITH DOOR DOOR CONTACT FOR ECM DOOR. COORDINATE WITH DOOR MANUFACTURER FOR EXACT LOCATION AND ROUGH-IN REQUIREMENTS. COORDINATE WITH THE CONTRACTING OFFICER FOR THE CONNECTION OF THE BMS ON THE DOOR. 2. IDS BOLTWORDS SLEEVE IN PILASTER. PROVIDE EMPTY 1" IDS BOLTWORDS SLEEVE IN PILASTER. PROVIDE EMPTY 1" CONDUIT TO IDS PULLBOX FOR WIRING BY GOVERNMENT. 3. RECESSED ROUGH-IN FOR FUTURE CCTV CAMERA. HOMERUN TO RECESSED ROUGH-IN FOR FUTURE CCTV CAMERA. HOMERUN TO IT CABINET. MOUNT 12" ABOVE TOP OF SLIDING MAGAZINE DOOR. 4. EXTEND TWO 1-1/2" CONDUITS TO SITE POLE, LOCATION TO BE EXTEND TWO 1-1/2" CONDUITS TO SITE POLE, LOCATION TO BE DETERMINED THROUGH COORDINATION WITH BASE SSO AND COMM SQUADRON, FOR PoE IP CAMERA AND PoE WIRELESS ACCESS POINT. POLE LOCATION AND CONDUIT ROUTE WILL BE LIMITED BY MAXIMUM CABLE LENGTH OF 295' FROM PATCH PANEL TO DEVICE. REFER TO DETAIL A1/T-501 AND A1/T-601. TO BE PROVIDED WHEN REQUIRED BASED ON CLASSIFICATION OF STORED MATERIALS. COORDINATE WITH CONTRACTING OFFICER. CONDUITS WILL EXIT THE MAGAZINE THROUGH THE SIDE WALL, PENETRATION OF THE FOUNDATION IS NOT PERMITTED. 5. EXTEND TWO 4" CONDUITS TO NEAREST TELECOMM MANHOLE. EXTEND TWO 4" CONDUITS TO NEAREST TELECOMM MANHOLE. CONDUITS WILL EXIT THE MAGAZINE THROUGH THE SIDE WALL, PENETRATION OF THE FOUNDATION IS NOT PERMITTED. 6. SINGLE POINT GROUND BAR. REFER TO E-101. SINGLE POINT GROUND BAR. REFER TO E-101. 7. MOTION DETECTOR WILL BE INSTALLED 3' FROM THE INSIDE FACE MOTION DETECTOR WILL BE INSTALLED 3' FROM THE INSIDE FACE OF THE MAGAZINE DOOR. 8. MOTION DETECTORS WILL BE EVENLY SPACED FOR COVERAGE OF MOTION DETECTORS WILL BE EVENLY SPACED FOR COVERAGE OF THE ENTIRE INTERIOR SPACE. 9. EXTERIOR EMERGENCY PHONE. REFER TO A3/T-501. EXTERIOR EMERGENCY PHONE. REFER TO A3/T-501. 10. TELECOMMUNICATIONS GROUNDING CONDUCTOR IN CONDUIT.TELECOMMUNICATIONS GROUNDING CONDUCTOR IN CONDUIT.

AutoCAD SHX Text J

AutoCAD SHX Text

DC

AutoCAD SHX Text J

AutoCAD SHX Text

IT

AutoCAD SHX Text

IDS

AutoCAD SHX Text K

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text HIGH SECURITY DOOR SWITCH KEYPAD MOTION DETECTOR, CEILING MOUNTED MOTION DETECTOR, WALL MOUNTED RECESSED JUNCTION BOX SURFACE JUNCTION BOX IDS CONTROLLER IT CABINET INTERNAL LOCKING DEVICE

AutoCAD SHX Text

ILD

AutoCAD SHX Text

SECURITY FLOOR PLAN

AutoCAD SHX Text

DS

AutoCAD SHX Text

GC

AutoCAD SHX Text

KD

AutoCAD SHX Text

AS NOTED

AutoCAD SHX Text 12894241

AutoCAD SHX Text

AutoCAD SHX Text

WRB

AutoCAD SHX Text

SCALE: 3/32" = 1'-0"

AutoCAD SHX Text BMS BALANCED MAGNETIC SWITCH BALANCED MAGNETIC SWITCH CCTV CLOSED-CIRCUIT TELEVISION CLOSED-CIRCUIT TELEVISION HSS HIGH SECURITY SYSTEM HIGH SECURITY SYSTEM IDS INTRUSION DETECTION SYSTEM INTRUSION DETECTION SYSTEM ILD INTERNAL LOCKING DEVICE INTERNAL LOCKING DEVICE IT INFORMATION TECHNOLOGY INFORMATION TECHNOLOGY PIR PASSIVE INFRARED SENSOR PASSIVE INFRARED SENSOR POE POWER OVER ETHERNET POWER OVER ETHERNET RGC RIGID GALVANIZED STEEL CONDUIT RIGID GALVANIZED STEEL CONDUIT WAP WIRELESS ACCESS POINT WIRELESS ACCESS POINT

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

RubioXR Image

J TC

SD

B

C

JCSHS

P

P

P P P P

P P

P

KEYED NOTES

SHEET NOTES

ELECTRICAL HEAT TRACE PLANA1

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D E

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C M

I D

A

T L A

N T

I C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N A

V A

L

S

U B

M A

R I N

E

B

A S

E

N

N

D O

N G

R O

T O

N

C

O N

N E

C T

I C

U T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

CL

W

S M

AG

AZ

IN

E

SMS/CWJ

JWJ

HPN

1667770

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

05/27/2025

E-801S

AS SHOWN

E L

E C

T R

I C

A

T

T

R A

P

A

N

WRB

JP JP

KB

F D

Z E

E

S d w g

12894310

HTLA OE F

W V

N IRO G

M IN

M IAO

C

KELLEY BOURASSA

ELECTRICAL HEAT TRACE PLAN

A1

TC

SD

B

C

J

J

CS

HS

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P

P P P P P P P P P

SHEET NOTES

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D E

P A

R T

M E

T

V

Y

A

B

C

D

2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N A

V A

L

F

A C

I L I T

I E

S

E

N G

I N

E E

R I N

G

S

Y S

T E

M

M A

N D

DES DRW

S Y

M D

E S

C R

I P

T I O

N D

A T

E A

P P

R

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C M

I D

A

T L A

N T

I C

N A

V A

L

S

T A

T I O

N

N

O R

F O

L K

V

A

N A

V A

L

S

U B

M A

R I N

E

B

A S

E

N

N

D O

N G

R O

T O

N

C

O N

N E

C T

I C

U T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

TY

PE

H M

AG

AZ

IN

E

SMS/CWJ

JWJ

HPN

1667770

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

E-801S

WRB

12921308

HTLA OE F

W V

N IRO G

M IN

M IAO

C

KELLEY BOURASSA

0 8' 32'16'

TELECOMMUNICATION FLOOR PLAN

A1

FAX: 571.218.1600

1100 NORTH GLEBE ROAD

SUITE 500

ARLINGTON, VIRGINIA 22201

571.218.1000

D

EP

AR

TM

EN

T

O F

TH

E

N

AV

Y

A

B

C

D

1 2 3 4 5

1 2 3 4 5

A

B

C

D

SCALE:

CONSTR. CONTR. NO.

SHEET

NAVFAC DRAWING NO.

N

AV

AL

F

AC

IL

IT

IE

S

EN

G

IN

EE

R

IN

G

S

YS

TE

M

S C

O M

M

AN

D

DES DRW

SY

M

D

ES

C R

IP

TI

O N

D

AT

E

AP

PR

CHK

OF

EPROJECT NO.:

PM/DM

BRANCH MANAGER

CHIEF ENG/ARCH

FIRE PROTECTION

NA

VA

L

FA

CI

LI

TI

ES

E

NG

IN

EE

RI

NG

S

YS

TE

M

S

CO

M M

AN

D

- M

ID

-A

TL

AN

TI

C

MI

D-

AT

LA

NT

IC

NA

VA

L S

TA

TI

ON

NO

RF

OL

K, V A

NA

VA

L

SU

BM

AR

IN

E

BA

SE

N

EW

L O

ND

O

N G

RO

TO

N, C

O

NN

EC

TI

CU

T

P-

W

EA

PO

NS

M

AG

AZ

IN

E

OR

DN

AN

CE

O

PE

RA

TIO

NS

FA

CI

LIT

Y

TY

PE

H M

AG

AZ

IN

E

SMS/CWJ

JWJ

HPN

1667770

05/27/2025

APPROVED BY LCDR ELIZABETH

OLOKODE NAVFAC NLOD FEAD

DIRECTOR NEW LONDON, GROTEN, CT

R

EV

IS

IO

N

S

FO

R A

M

EN

D M

EN

T

5/

/2

SHEET NOTES

KEYED NOTES

LEGEND

TY101S

ABBREVIATIONS

THESE DRAWINGS HAVE BEEN ADAPTED FROM APPROVED NAVFAC MUNITIONS STORAGE

CONSTRUCTION DOCUMENTS, NAVFAC DRAWING NUMBERS 14138857 TO 14138860,

APPROVED BY DDESB ON 24 SEPTEMBER 2024. JACOBS DOR RESPONSIBILITY AND SEAL

APPLICABILITY IS LIMITED TO THE SITE ADAPTATIONS AND MODIFICATIONS MADE TO THIS

DRAWING.

AutoCAD SHX Text K

AutoCAD SHX Text

IDS

AutoCAD SHX Text

IT

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

DC

AutoCAD SHX Text

DC

AutoCAD SHX Text

DC

AutoCAD SHX Text

DC

AutoCAD SHX Text

DC

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

ILD

AutoCAD SHX Text

ILD

AutoCAD SHX Text

ILD

AutoCAD SHX Text

ILD

AutoCAD SHX Text

ILD

AutoCAD SHX Text J

AutoCAD SHX Text J

AutoCAD SHX Text

(TYP.)

AutoCAD SHX Text

SCALE: 3/32" = 1'-0"

AutoCAD SHX Text

SATISFACTORY TO

AutoCAD SHX Text

APPROVED

AutoCAD SHX Text

ACTIVITY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

FOR COMMANDER NAVFAC

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

A/E INFO

AutoCAD SHX Text

1. ALL CONDUIT MUST BE RIGID GALVANIZED STEEL CONDUIT UNLESS ALL CONDUIT MUST BE RIGID GALVANIZED STEEL CONDUIT UNLESS INDICATED OTHERWISE. 2. EXPOSED CONDUITS ON EXTERIOR WALLS MUST BE PROHIBITED. EXPOSED CONDUITS ON EXTERIOR WALLS MUST BE PROHIBITED. 3. PROPOSED IDS VENDOR TO PERFORM COVERAGE CALCULATIONS, PROPOSED IDS VENDOR TO PERFORM COVERAGE CALCULATIONS, INCLUDING OBSTRUCTIONS, TO VERIFY QUANTITY AND LOCATION OF MOTION DETECTORS. FINAL LOCATIONS AND QUANTITIES OF MOTION DETECTORS TO BE INSTALLED PER IDS VENDOR SHOP DRAWINGS. 4. ALL CONDUITS WILL BE MINIMUM 1"C UNLESS NOTED OTHERWISE. ALL CONDUITS WILL BE MINIMUM 1"C UNLESS NOTED OTHERWISE. REFER TO T-601 FOR CONDUIT SIZES. 5. CONDUITS WILL BE EXPOSED INSIDE THE MAGAZINE UNLESS CONDUITS WILL BE EXPOSED INSIDE THE MAGAZINE UNLESS INDICATED OTHERWISE.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .