GI 04-02 - LEAD PAINT AND TRANSITE PANELS.pdf

PDF 430 KB Posted

Attached to
Z2DA--626A4-19-101 - Renovate Ward 1B at the Alvin C. York VA Medical Center, Murfreesboro, TN 37129
Solicitation number
36C24923R0114
Issued by

About this file

This document contains plans and specifications for a construction project to remove lead paint and asbestos-containing materials (ACM) at a Veterans Affairs medical center. The project involves abating lead paint from steel doors, casings, heaters and lockers. All flooring, wall and ceiling materials throughout the building are assumed to contain ACM, including mastic, ductwork insulation and piping insulation. The scope also includes removing estimated transite panels from radiators and heater covers. The related federal contract opportunity is solicitation number 36C24923R0114 to renovate ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee, as part of construction project number 626A4-19-101. The solicitation is for hazardous material abatement services in preparation for the planned renovation.

View the file

Other files

File Type Posted
36C24923R0114 0003.docx DOCX document
E-EI-01 - PARTIAL ELECTRICAL RISER DIAGRAM - DEMOLITION.pdf PDF
119437-Alvin C. York VAMC Renovate Ward 1B - Revision 1 - Electrical Narrative.pdf PDF
Government Answers to Industry Questions.pdf PDF
283100.pdf PDF
275223.pdf PDF
Bradley_GrabBar_8370-107.pdf PDF
Ward 1B - Revision 1.pdf PDF
Renovate Ward 1B Pre-Proposal Sign in Sheet - 07-06-2023.pdf PDF
E-EI-02 - PARTIAL ELECTRICAL RISER DIAGRAM - NEW WORK.pdf PDF
Bradley_GrabBar_8370-108.pdf PDF
General Decision Number TN20230187 06-30-2023 Rutherford County TN.pdf PDF
ASI 3413-25.pdf PDF
36C24923R0114 0002.docx DOCX document
GAMCO 125SwingUpTP.pdf PDF
Interior Wall Type Legend.pdf PDF
SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
36C24923R0114 0001.docx DOCX document
MECH BINDER.pdf PDF
Ward 1B - Specs - Vol. 2.pdf PDF
GD Number TN20230187 05-12-2023.pdf PDF
GI 01-02 - CONSTRUCTION STAGING PLAN.pdf PDF
GI 03-01 - SECOND FLOOR ICRA PLAN.pdf PDF
GI 05-01 - PHASING PLANS.pdf PDF
GI 00-01 - COVER SHEET.pdf PDF
GI 01-10 - WALL TYPE DETAILS.pdf PDF
Price Schedule Project 626A4-19-101 Renovate Ward 1B.xlsx XLSX spreadsheet
36C24923R0114.docx DOCX document
General Conditions Breakout.xlsx XLSX spreadsheet
WARD 1B - ARCH BINDER.pdf PDF
GI 01-20 - ACCESSIBILITY DETAILS.pdf PDF
RFI Form.docx DOCX document
GI 04-01 - ACM DUCT WORK AND ACM PIPE INSULATION.pdf PDF
Performance Relevancy Survey Form - 626A4-19-101 Renovate Ward 1B.docx DOCX document
Ward 1B - Specs - Vol. 1.pdf PDF
VN 01-00 - PATIENT LIFT VENDOR DRAWINGS.pdf PDF
ELECTRICAL BINDER.pdf PDF
PLUMBING BINDER.pdf PDF
GI 01-01 - GENERAL DATA.pdf PDF
TECH BINDER.pdf PDF
WARD 1B - GENERAL.pdf PDF
WARD 1B - INTERIORS .pdf PDF
Calculation of Self Performed Work.docx DOCX document
GI 02-01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL.pdf PDF
AD 01-01 - THIRD FLOOR DEMOLITION PLAN - OVERALL.pdf PDF
Contractor EMR Certification Form.docx DOCX document
FP BINDER.pdf PDF
GI 03-02 - THIRD FLOOR ICRA PLAN.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GENERAL NOTES:

1. IT SHOULD BE ASSUMED THAT ALL FLOORING CONTAINS ACM AND MASTIC

THROUGHOUT INCLUDING ALL EXISTING PATIENT ROOMS, SUPPORT ROOMS, AND

CORRIDORS.

2. ALL EXISTING IN WALL RADIATORS SHALL BE ASSUMED TO HAVE HAZARDOUS

TRANSITE PANELS THAT SHALL BE REMOVED. EACH RADIATOR SHALL BE

ASSUMED TO HAVE 25 LF OF HAZARDOUS INSULATION SURROUNDING PIPING

AND SHALL BE REMOVED.

ACM MASTIC THROUGHOUT, INSULATED

DUCT WORK SYSTEM

HAZARDOUS MATERIAL LEGEND

ACM MASTIC THROUGHOUT, INSULATED

PIPING SYSTEM

STEEL LOCKERS

HEATER COVERS

ASSUME TRANSITE PANELS BEHIND

ALL HEATER COVERS

12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554

©Copyright 2019

TLC No.:

www.tlc-engineers.com

118626

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

Dwg.

PROJECT TEAM:

Office of

Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Department of Veterans Affairs

KEYPLAN

MURFREESBORO, TN

615.370.8500

615.370.8530 hfrdesign.com

214 Centerview Drive Suite 300 Brentwood, TN 37027

BLDG 2

BLDG 1

BLDG 9

Phase

FULLY SPRINKLERED

C U s e rs \a tr a y lo r\ D o c u m e n ts

\M b o ro V

A W a rd b

R e n o a tr a y lo r2 X

N D

H .r v t

/1

/2

:2

:3

P

M

04-14-2023

626A4-19-101

GI 04.02

AE RENOVATE WARD 1BLEAD PAINT AND TRANSITE PANELS

AT

HFR Project No: 2019056

100% CONSTRUCTION

DOCUMENTS

1 THIRD FLOOR PLAN - LEAD PAINT/TRANSITE PANELS/MASTIC FLOORING

4. ALL TRANSITE PANELS ARE ASSUMED ACM. ESTIMATED AMOUNT TO BE 80

3. IT CAN BE ASSUMED THAT ALL STEEL DOOR CASINGS, STEEL CASINGS, HEATERS STEEL COVERS, AND STEEL LOCKERS

CONTAIN LEAD PAINT. PAINTS ARE INTACT AND ARE IN GOOD CONDITION. FIELD VERIFY NUMBER OF EACH CONDITION

2. LIMITED QUANTIFICATION OF ACM FROM THE INSULATED PIPING SYSTEM AND DUCT WORK WAS DONE THEREFORE THE FULL

EXTENT OF UNCOVERING ACM MATERIAL WILL INVOLVE REMOVING ENTIRE ACOUSTIC CEILING TILES AND IN WALL CAVITIES TO

VISUALLY COUNT ALL AREAS THAT CONTAIN WHITE MASTIC

1. IT CAN BE ASSUMED ALL INSULATED PIPING, DUCTWORK SYSTEM,90-DEGREE JOINTS, 45-DEGREE JOINTS, T-JOINTS TO

INDIVIDUAL ROOMS AND TAPE JOINTS ARE HOMOGENOUS AND CONSIDERED ACM. INSULATION PIPE SYSTEM CONSISTED OF

HOT WATER SUPPLY LINES AND HOT WATER RECALCULATION LINES. LIMITED QUANTIFICATION OF ACM FROM THE INSULATED

PIPING SYSTEM AND DUCT WORK

GENERAL HAZARDOUS MATERIALS NOTES

0 5' 10'

No. Date Description

Sheets
AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL
AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN
AE 01.01 - FOURTH FLOOR/ATTIC PLAN
AE 01.03 - THIRD FLOOR OVERALL PLAN
AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED
AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED
AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED
AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED
AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED
AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED
AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS
AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS
AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES
AE 03.02 - DOOR DETAILS
AE 03.03 - WINDOW DETAILS
AE 08.01 - MISC. DETAILS
AE 08.02 - MISC. DETAILS
AE 08.03 - MISC. DETAILS
AE 08.04 - MISC. DETAILS
AE 08.05 - MISC. INTERIOR DETAILS
AE 08.06 - MISC CEILING DETAILS
AE 09.01 - INTERIOR ELEVATIONS
AE 09.02 - INTERIOR ELEVATIONS
AE 09.03 - CORRIDOR ELEVATIONS
AE 09.04 - CORRIDOR ELEVATIONS
AE 09.05 - 3D VIEWS
AE 10.01 - CASEWORK SECTIONS AND DETAILS
AE 10.02 - CASEWORK SECTIONS AND DETAILS
AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL
AE 11.10 - THIRD FLOOR RCP - PART A
AE 11.11 - THIRD FLOOR RCP - PART B
AE 11.12 - THIRD FLOOR RCP - PART C
AE 12.01A - EQUIPMENT PLANS
AE 12.01B - EQUIPMENT PLANS
AE 12.01C - EQUIPMENT PLANS
AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B
AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C
GI 00.01 - COVER SHEET
GI 01.01 - GENERAL DATA
GI 01.02 - CONSTRUCTION STAGING PLAN
GI 01.10 - WALL TYPE DETAILS
GI 01.20 - ACCESSIBILITY DETAILS
GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL
GI 03.01 - SECOND FLOOR ICRA PLAN
GI 03.02 - THIRD FLOOR ICRA PLAN
GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION
GI 04.02 - LEAD PAINT AND TRANSITE PANELS
GI 05.01 - PHASING PLANS
IN 01.00 - THIRD FLOOR FINISH LEGEND
IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A
IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B
IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C
IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL
IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A
IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B
IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C
IN 02.00 - THIRD FLOOR SIGNAGE LEGEND
IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE
IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A
IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B
IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C
VN 01.00 - PATIENT LIFT VENDOR DRAWINGS

File details come from the government source that posted it. Updated .