This document contains plans and specifications for a construction project to remove lead paint and asbestos-containing materials (ACM) at a Veterans Affairs medical center. The project involves abating lead paint from steel doors, casings, heaters and lockers. All flooring, wall and ceiling materials throughout the building are assumed to contain ACM, including mastic, ductwork insulation and piping insulation. The scope also includes removing estimated transite panels from radiators and heater covers. The related federal contract opportunity is solicitation number 36C24923R0114 to renovate ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee, as part of construction project number 626A4-19-101. The solicitation is for hazardous material abatement services in preparation for the planned renovation.
View the file
Other files
Show all 48
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES:
1. IT SHOULD BE ASSUMED THAT ALL FLOORING CONTAINS ACM AND MASTIC
THROUGHOUT INCLUDING ALL EXISTING PATIENT ROOMS, SUPPORT ROOMS, AND
CORRIDORS.
2. ALL EXISTING IN WALL RADIATORS SHALL BE ASSUMED TO HAVE HAZARDOUS
TRANSITE PANELS THAT SHALL BE REMOVED. EACH RADIATOR SHALL BE
ASSUMED TO HAVE 25 LF OF HAZARDOUS INSULATION SURROUNDING PIPING
AND SHALL BE REMOVED.
ACM MASTIC THROUGHOUT, INSULATED
DUCT WORK SYSTEM
HAZARDOUS MATERIAL LEGEND
ACM MASTIC THROUGHOUT, INSULATED
PIPING SYSTEM
STEEL LOCKERS
HEATER COVERS
ASSUME TRANSITE PANELS BEHIND
ALL HEATER COVERS
12 Cadillac Dr., Suite 150 Brentwood, TN 37027 P 615.297.4554
©Copyright 2019
TLC No.:
www.tlc-engineers.com
118626
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg.
PROJECT TEAM:
Office of
Construction and Facilities Management o n e e ig h th in c h o n e fo o t 1
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Department of Veterans Affairs
KEYPLAN
MURFREESBORO, TN
615.370.8500
615.370.8530 hfrdesign.com
214 Centerview Drive Suite 300 Brentwood, TN 37027
BLDG 2
BLDG 1
BLDG 9
Phase
FULLY SPRINKLERED
C U s e rs \a tr a y lo r\ D o c u m e n ts
\M b o ro V
A W a rd b
R e n o a tr a y lo r2 X
N D
H .r v t
/1
/2
:2
:3
P
M
04-14-2023
626A4-19-101
GI 04.02
AE RENOVATE WARD 1BLEAD PAINT AND TRANSITE PANELS
AT
HFR Project No: 2019056
100% CONSTRUCTION
DOCUMENTS
1 THIRD FLOOR PLAN - LEAD PAINT/TRANSITE PANELS/MASTIC FLOORING
4. ALL TRANSITE PANELS ARE ASSUMED ACM. ESTIMATED AMOUNT TO BE 80
3. IT CAN BE ASSUMED THAT ALL STEEL DOOR CASINGS, STEEL CASINGS, HEATERS STEEL COVERS, AND STEEL LOCKERS
CONTAIN LEAD PAINT. PAINTS ARE INTACT AND ARE IN GOOD CONDITION. FIELD VERIFY NUMBER OF EACH CONDITION
2. LIMITED QUANTIFICATION OF ACM FROM THE INSULATED PIPING SYSTEM AND DUCT WORK WAS DONE THEREFORE THE FULL
EXTENT OF UNCOVERING ACM MATERIAL WILL INVOLVE REMOVING ENTIRE ACOUSTIC CEILING TILES AND IN WALL CAVITIES TO
VISUALLY COUNT ALL AREAS THAT CONTAIN WHITE MASTIC
1. IT CAN BE ASSUMED ALL INSULATED PIPING, DUCTWORK SYSTEM,90-DEGREE JOINTS, 45-DEGREE JOINTS, T-JOINTS TO
INDIVIDUAL ROOMS AND TAPE JOINTS ARE HOMOGENOUS AND CONSIDERED ACM. INSULATION PIPE SYSTEM CONSISTED OF
HOT WATER SUPPLY LINES AND HOT WATER RECALCULATION LINES. LIMITED QUANTIFICATION OF ACM FROM THE INSULATED
PIPING SYSTEM AND DUCT WORK
GENERAL HAZARDOUS MATERIALS NOTES
0 5' 10'
No. Date Description
| Sheets |
| AD 01.01 - THIRD FLOOR DEMOLITION PLAN - OVERALL |
| AE 01.00 - SECOND FLOOR PLAN AND REFLECTED CEILING PLAN |
| AE 01.01 - FOURTH FLOOR/ATTIC PLAN |
| AE 01.03 - THIRD FLOOR OVERALL PLAN |
| AE 01.11 - PARTIAL THIRD FLOOR PLAN - PART A NOTED |
| AE 01.12 - PARTIAL THIRD FLOOR PLAN - PART B NOTED |
| AE 01.13 - PARTIAL THIRD FLOOR PLAN - PART C NOTED |
| AE 01.14 - PARTIAL THIRD FLOOR PLAN - PART A DIMENSIONED |
| AE 01.15 - PARTIAL THIRD FLOOR PLAN - PART B DIMENSIONED |
| AE 01.16 - PARTIAL THIRD FLOOR PLAN - PART C DIMENSIONED |
| AE 02.01 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.02 - ENLARGED PLANS AND REFLECTED CEILING PLANS |
| AE 02.03 - ENLARGED TOILET PLANS AND ELEVATIONS |
| AE 03.01 - DOOR ELEVATIONS, SCHEDULE, & NOTES |
| AE 03.02 - DOOR DETAILS |
| AE 03.03 - WINDOW DETAILS |
| AE 08.01 - MISC. DETAILS |
| AE 08.02 - MISC. DETAILS |
| AE 08.03 - MISC. DETAILS |
| AE 08.04 - MISC. DETAILS |
| AE 08.05 - MISC. INTERIOR DETAILS |
| AE 08.06 - MISC CEILING DETAILS |
| AE 09.01 - INTERIOR ELEVATIONS |
| AE 09.02 - INTERIOR ELEVATIONS |
| AE 09.03 - CORRIDOR ELEVATIONS |
| AE 09.04 - CORRIDOR ELEVATIONS |
| AE 09.05 - 3D VIEWS |
| AE 10.01 - CASEWORK SECTIONS AND DETAILS |
| AE 10.02 - CASEWORK SECTIONS AND DETAILS |
| AE 11.01 - THIRD FLOOR REFLECTED CEILING PLAN - OVERALL |
| AE 11.10 - THIRD FLOOR RCP - PART A |
| AE 11.11 - THIRD FLOOR RCP - PART B |
| AE 11.12 - THIRD FLOOR RCP - PART C |
| AE 12.01A - EQUIPMENT PLANS |
| AE 12.01B - EQUIPMENT PLANS |
| AE 12.01C - EQUIPMENT PLANS |
| AE 12.02 - EQUIPMENT PLANS - PATIENT ROOMS AREA B |
| AE 12.02B - EQUIPMENT PLANS - PATIENT ROOMS AREA C |
| GI 00.01 - COVER SHEET |
| GI 01.01 - GENERAL DATA |
| GI 01.02 - CONSTRUCTION STAGING PLAN |
| GI 01.10 - WALL TYPE DETAILS |
| GI 01.20 - ACCESSIBILITY DETAILS |
| GI 02.01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL |
| GI 03.01 - SECOND FLOOR ICRA PLAN |
| GI 03.02 - THIRD FLOOR ICRA PLAN |
| GI 04.01 - ACM DUCT WORK AND ACM PIPE INSULATION |
| GI 04.02 - LEAD PAINT AND TRANSITE PANELS |
| GI 05.01 - PHASING PLANS |
| IN 01.00 - THIRD FLOOR FINISH LEGEND |
| IN 01.02 - PARTIAL THIRD FLOOR FINISH PLAN - PART A |
| IN 01.03 - PARTIAL THIRD FLOOR FINISH PLAN - PART B |
| IN 01.04 - PARTIAL THIRD FLOOR FINISH PLAN - PART C |
| IN 01.05 - THIRD FLOOR PATTERN PLAN OVERALL |
| IN 01.06 - PARTIAL THIRD FLOOR PATTERN - PART A |
| IN 01.07 - PARTIAL THIRD FLOOR PATTERN - PART B |
| IN 01.08 - PARTIAL THIRD FLOOR PATTERN - PART C |
| IN 02.00 - THIRD FLOOR SIGNAGE LEGEND |
| IN 02.01 - THIRD FLOOR SIGNAGE SCHEDULE |
| IN 02.02 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART A |
| IN 02.03 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART B |
| IN 02.04 - PARTIAL THIRD FLOOR SIGNAGE PLAN - PART C |
| VN 01.00 - PATIENT LIFT VENDOR DRAWINGS |