General Conditions Breakout.xlsx

XLSX spreadsheet 18 KB Posted

Attached to
Z2DA--626A4-19-101 - Renovate Ward 1B at the Alvin C. York VA Medical Center, Murfreesboro, TN 37129
Solicitation number
36C24923R0114
Issued by

About this file

This document provides a template for breaking out general condition costs on a schedule of values for a federal construction contract. The template lists various general condition cost categories such as superintendent, project manager, field office engineer, builders risk and other project-specific insurance, site maintenance and protection, progress photos, signage, travel, lodging, record document preparation, as-builts, weather protection, infection control, information technology, and others. For each category, the template includes a description and a value field to enter dollar amounts.

The related federal contract opportunity is a renovation project for Ward 1B at the Alvin C. York VA Medical Center in Murfreesboro, Tennessee. The solicitation number is 36C24923R0114 and is issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9.

View the file

Other files

File Type Posted
36C24923R0114 0003.docx DOCX document
E-EI-01 - PARTIAL ELECTRICAL RISER DIAGRAM - DEMOLITION.pdf PDF
119437-Alvin C. York VAMC Renovate Ward 1B - Revision 1 - Electrical Narrative.pdf PDF
Government Answers to Industry Questions.pdf PDF
283100.pdf PDF
275223.pdf PDF
Bradley_GrabBar_8370-107.pdf PDF
Ward 1B - Revision 1.pdf PDF
Renovate Ward 1B Pre-Proposal Sign in Sheet - 07-06-2023.pdf PDF
E-EI-02 - PARTIAL ELECTRICAL RISER DIAGRAM - NEW WORK.pdf PDF
Bradley_GrabBar_8370-108.pdf PDF
General Decision Number TN20230187 06-30-2023 Rutherford County TN.pdf PDF
ASI 3413-25.pdf PDF
36C24923R0114 0002.docx DOCX document
GAMCO 125SwingUpTP.pdf PDF
Interior Wall Type Legend.pdf PDF
SUBCONTRACTOR INFORMATION AND CONSENT FORM.docx DOCX document
36C24923R0114 0001.docx DOCX document
MECH BINDER.pdf PDF
Ward 1B - Specs - Vol. 2.pdf PDF
GD Number TN20230187 05-12-2023.pdf PDF
GI 01-02 - CONSTRUCTION STAGING PLAN.pdf PDF
GI 03-01 - SECOND FLOOR ICRA PLAN.pdf PDF
GI 05-01 - PHASING PLANS.pdf PDF
GI 00-01 - COVER SHEET.pdf PDF
GI 01-10 - WALL TYPE DETAILS.pdf PDF
Price Schedule Project 626A4-19-101 Renovate Ward 1B.xlsx XLSX spreadsheet
GI 04-02 - LEAD PAINT AND TRANSITE PANELS.pdf PDF
36C24923R0114.docx DOCX document
WARD 1B - ARCH BINDER.pdf PDF
GI 01-20 - ACCESSIBILITY DETAILS.pdf PDF
RFI Form.docx DOCX document
GI 04-01 - ACM DUCT WORK AND ACM PIPE INSULATION.pdf PDF
Performance Relevancy Survey Form - 626A4-19-101 Renovate Ward 1B.docx DOCX document
Ward 1B - Specs - Vol. 1.pdf PDF
VN 01-00 - PATIENT LIFT VENDOR DRAWINGS.pdf PDF
ELECTRICAL BINDER.pdf PDF
PLUMBING BINDER.pdf PDF
GI 01-01 - GENERAL DATA.pdf PDF
TECH BINDER.pdf PDF
WARD 1B - GENERAL.pdf PDF
WARD 1B - INTERIORS .pdf PDF
Calculation of Self Performed Work.docx DOCX document
GI 02-01 - THIRD FLOOR LIFE SAFETY PLAN - OVERALL.pdf PDF
AD 01-01 - THIRD FLOOR DEMOLITION PLAN - OVERALL.pdf PDF
Contractor EMR Certification Form.docx DOCX document
FP BINDER.pdf PDF
GI 03-02 - THIRD FLOOR ICRA PLAN.pdf PDF
Show all 48

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.236-88 Contract Changes-Supplement, paragraph (b)(10), the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage.
General Condition DescriptionValue
Superintendent$ - 0
Project Manager$ - 0
Field Office Engineer$ - 0
Builder's Risk Insurance$ - 0
Other Project Specific Liability Insurance$ - 0
Site Maintenance and Protection$ - 0
Progress Photos (per contract specifications)$ - 0
Dumpsters$ - 0
Office Trailer$ - 0
Storage Trailer/POD/CONEX$ - 0
Telephone (Cell and/or Landline)$ - 0
Signage (per contract specifications and/or drawings)$ - 0
Travel (must comply with Federal Travel Regulations)$ - 0
Lodging (must comply with Federal Travel Regulations)$ - 0
Record Document Preparation$ - 0
As-builts (per contract specifications)$ - 0
Weather Protection (per contract specifications)$ - 0
Infection Control (per contract specifications)$ - 0
Information Technology (Internet, etc.)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0